Vantage Frontier campus (Stargate Shackelford County)

Under construction

United States · 1 project · Last reported

Summary

Vantage Data Centers is building Frontier, a 1,200-acre campus of ten single-story data centers in Shackelford County, Texas, near Abilene. It is planned at 1.4 GW and roughly $25 billion. In September 2025 it was named one of the new Stargate sites under the OpenAI and Oracle agreement. Analysts report power will come from an off-grid natural gas microgrid built and run by VoltaGrid. A groundbreaking was reported in December 2025, and state building registrations filed in mid-2026 list building start dates in 2026 and completions in 2027. Vantage targeted the first building for the second half of 2026, and trade press reports campus completion in 2028.

Source record as of 2026-04-17 · Details and sources

Oracle-published campus/data-hall construction photographs dated9/8/26. Source-reported imagery only; no independent image analysis or precise stage asserted. evidence

Oracle · publication date not stated

Location

The interactive map needs JavaScript. Display anchor: 32.70890, -99.33080 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

County or district reference only; the facility position is not established.

Projects (1)

Vantage Frontier campus (Stargate Shackelford County)

Under construction last observed as of · Authoritative status update

This record reports under construction as of 2026-04-17. Cleanview; Epoch AI

Location: Shackelford County, Texas, US. Shackelford County centroid from OpenStreetMap Nominatim. Texas TDLR filings give a site address on Private Road 1604 with an Abilene mailing address in Shackelford County, but the road was not found in OpenStreetMap. Epoch AI places the campus just across the county line from the Abilene site, so the true site is likely west of this point. REBusinessOnline; Texas Department of Licensing and Regulation; Texas Department of Licensing and Regulation; Epoch AI

Use: Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity1,400 MWPlanned · Campus · Unspecified2025-08-19Trade press gives 1.4 GW and Vantage's locations page lists 1,400 MW total, without saying whether this is IT or facility power.REBusinessOnline; Vantage Data Centers
Power capacity1,400 MWPlanned · Campus · It load2026-04-17Analyst characterization, not a company disclosure: Cleanview calls 1.4 GW critical IT capacity and Epoch AI says Vantage reports it as IT power, while Vantage's own locations page labels the figure total.Cleanview; Epoch AI
Power capacityabout 2,000 MWPlanned · Campus · Facility2026-04-17Analyst estimate, not a company disclosure: Epoch AI's projection of total facility power, derived from the reported IT load.Epoch AI
Power capacityabout 2,580 MWPermitted · Campus · Onsite generation2026-04Analyst report, not a company disclosure: gross capacity of the planned Jenbacher engine fleet per a state air permit filing summarized by Cleanview.Cleanview
Investmentabout 25,000,000,000 USDAnnounced · Campus2025-08-19Reported as $25 billion in August 2025; later trade coverage describes it as more than $25 billion.REBusinessOnline; W.Media
Investment950,000,000 USDReported · Phase · Building TX301 (TDLR estimated cost)2026-06-29Texas Department of Licensing and Regulation
Investment945,000,000 USDReported · Phase · Building TX310 (TDLR estimated cost)2026-06-30Texas Department of Licensing and Regulation
Land areaabout 1,200 acresPlanned · Campus2025-08-19REBusinessOnline; W.Media
Buildings10 countPlanned · Campus2025-08-19REBusinessOnline; W.Media
Floor areaabout 3,700,000 sq_ftPlanned · Campus2025-08-19REBusinessOnline; W.Media

Companies and organizations

NameRoleNotesSources
Vantage Data CentersDeveloperREBusinessOnline; W.Media
Vantage Data CentersOwnerTDLR filings list building-level Vantage LLCs (for example Vantage Data Centers TX301, LLC) as owners.Texas Department of Licensing and Regulation; Texas Department of Licensing and Regulation
OracleTenantGrouped with the Stargate sites being developed by Oracle; analysts Cleanview and Epoch AI, not company disclosures, name Oracle as cloud operator and owner of the AI hardware. TDLR filings show no tenant assigned.SoftBank Group Corp.; W.Media; Cleanview
OpenAITenantEnd user through Oracle under the Stargate program.SoftBank Group Corp.; Cleanview
VoltaGridPower supplierAnalyst Cleanview, citing an Oracle fact sheet, describes VoltaGrid as developer and operator of the on-site gas microgrid; not confirmed in a company source opened here.Cleanview

Timeline

DateEventActual or plannedNotesSources
2025-08-19AnnouncedActualREBusinessOnline
2025-09-23OtherActualNamed as one of three new Stargate sites under the OpenAI and Oracle agreement.SoftBank Group Corp.
2025Construction startedActualAugust 2025 trade coverage said construction had already begun; analyst Cleanview dates land clearing to September 2025 and a groundbreaking to December 2025, when trade press also reported Vantage had broken ground.REBusinessOnline; W.Media; Cleanview
2026-H2First operationalPlannedTarget for the first building to be delivered and enter service.REBusinessOnline; W.Media
2027-08-11OtherPlannedCompletion date listed in the TDLR registration for building TX301, later than the company's second-half 2026 target for the first building.Texas Department of Licensing and Regulation
2028Fully operationalPlannedTrade press reports a 2028 completion; analyst Epoch AI separately projects Q4 2028.W.Media; Epoch AI

Power supply

TypeDescriptionSources
Natural gas onsiteOff-grid, behind-the-meter gas microgrid of Jenbacher reciprocating engines in ten power blocks, developed and operated by VoltaGrid, with no public plans to connect to the grid, per analysts Cleanview and Epoch AI.Cleanview; Epoch AI
Diesel backupDiesel engines provide black-start capability for the microgrid, according to the air permit filing summarized by analyst Cleanview.Cleanview

TDLR registrations list planned start and completion dates per building and do not by themselves confirm progress, so status rests on April 2026 analyst imagery reviews: Cleanview reported vertical construction on five buildings and Epoch AI reported roofing on the first. These are analyst assessments, not company disclosures. No source found confirms the first building has been delivered as of October 2026.

Sources for these details
Companies
  • Developer: Vantage Data Centers (unknown scope) evidence
  • Developer: Vantage Data Centers (unknown scope) evidence
  • Owner: Vantage Data Centers (unknown scope) evidence
  • Owner: Vantage Data Centers (unknown scope) evidence
  • Tenant: Oracle (unknown scope) evidence
  • Tenant: Oracle (unknown scope) evidence
  • Tenant: Oracle (unknown scope) evidence
  • Tenant: OpenAI (unknown scope) evidence
  • Tenant: OpenAI (unknown scope) evidence
  • Power Supplier: VoltaGrid (unknown scope) evidence
Source and location review
Status source
Oracle Shackelford construction media items datedSeptember8,2026 evidence row
Oracle · publication date not stated · Company disclosure
Locator
County or district reference only · Compiled location reference · admin2 evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 49 days before the data update on 2026-10-27

Location details
Coordinates
32.70890, -99.33080
Geometry licence
source-terms-not-recorded
Use scope
County or district reference only
Scope class
admin2
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Shackelford County centroid from OpenStreetMap Nominatim. Texas TDLR filings give a site address on Private Road 1604 with an Abilene mailing address in Shackelford County, but the road was not found in OpenStreetMap. Epoch AI places the campus just across the county line from the Abilene site, so the true site is likely west of this point.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
c23b8163

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Vantage Frontier campus (Stargate Shackelford County)
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Behind-the-meter data centers: Stargate Frontier
Archived copy
Cleanview
Analyst report
Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: Construction Started, Power Source: Diesel Backup, Power Source: Natural Gas Onsite, Role: Power Supplier, Tenant claimnot statedsource-terms-not-recordedCleanviewbdd967cd55f7f412f237a8d50b24853d84e6197d76f111566dbda3a8e7af1c39
Factual source record; not the publisher page
Data Center Locations - North America
Archived copy
Vantage Data Centers
Company disclosure
Imported: Record, Metric: Power Capacitynot statedsource-terms-not-recordedVantage Data Centers79be232c95987d328b492b3cd852eb9a5922794b09d72dd53696ef1766be7214
Factual source record; not the publisher page
OpenAI Stargate: where the US sites stand
Archived copy
Epoch AI
Analyst report
Imported: Geometry, Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: Fully Operational, Power Source: Natural Gas Onsitesource-terms-not-recordedEpoch AIf3659dabca37bb9900fa59adc288141f13c13e50dec174dbf2c034c0bdd4f4b1
Factual source record; not the publisher page
OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites
Archived copy
SoftBank Group Corp.
Company disclosure
Imported: Record, Milestone: Other, Tenant claimsource-terms-not-recordedSoftBank Group Corp.77e86241ed68d61e9e04fd3f44ba4e1cd85eeab82a5118fb40fc21d1b34b07be
Factual source record; not the publisher page
Oracle Shackelford construction media items datedSeptember8,2026
Archived copy
Oracle
Company disclosure
Physical statusnot statedall-rights-reservedOracleaccb17d2cdcd1dce771770f81e553fa1cdafd49f659f19fde05a237af85c6847
Retained source material; see source provenance
TABS2026024068: Vantage DC Abilene - TX3 - Project Frontier, building TX301
Archived copy
Texas Department of Licensing and Regulation
Regulatory filing
Imported: Geometry, Imported: Record, Metric: Investment, Milestone: Other, Owner claimsource-terms-not-recordedTexas Department of Licensing and Regulation4895071ca3399c1727cc346f18e94a7ba7be5e9895ed934ca47174de0588ef3f
Factual source record; not the publisher page
TABS2026024112: Vantage DC Abilene - TX3 - Project Frontier, building TX310
Archived copy
Texas Department of Licensing and Regulation
Regulatory filing
Imported: Geometry, Imported: Record, Metric: Investment, Owner claimsource-terms-not-recordedTexas Department of Licensing and Regulationc1d2fe390e53caf0fe773c151852a3a5ef29e4fe3a4506fc8a57e9d1819415a4
Factual source record; not the publisher page
Vantage Data Centers breaks ground on data center campus in Texas
Archived copy
W.Media
Trade publication
Imported: Record, Metric: Buildings, Metric: Floor Area, Metric: Investment, Metric: Land Area, Milestone: Construction Started, Milestone: First Operational, Milestone: Fully Operational, Role: Developer, Tenant claimsource-terms-not-recordedW.Media5dcabfd26b2a156774cd9cdab01c6f52fc927f8f60fe10f374c5dc9bc0e8a0e6
Factual source record; not the publisher page
Vantage Data Centers to Invest $25B for Mega-Campus in Shackelford County, Texas
Archived copy
REBusinessOnline
Trade publication
Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Floor Area, Metric: Investment, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Milestone: Construction Started, Milestone: First Operational, Role: Developersource-terms-not-recordedREBusinessOnlined4c0eefda039c4b977025014335aee5cfc848e92c347077ce795e38a9ce0807c
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Vantage Frontier campus (Stargate Shackelford County) [site vcc-site-f3c14c6227b2ae418664]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f3c14c6227b2ae418664/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction