DataOne Vineland Two-Phase AI Data Center Facility

Under construction

United States · 2 projects · Last reported

Summary

DataOne Vineland Phase 2 Expansion Current Build

The city identifies the Phase 2 two-story datacenter extension as under construction on Block 7503 Lot 35.01. evidence

City of Vineland Planning Board · published 2026-08-07

Nebius Vineland AI factory

AI data center in Vineland, New Jersey, designed, built, owned and operated by DataOne with Nebius as tenant owning the servers and GPUs, and Vineland-based Northeast Precast as builder. A May 2025 Nebius filing describes a phased development scalable up to 300 MW, with construction begun in early 2025. Nebius named the site in its September 2025 agreement to supply Microsoft with dedicated GPU capacity, valued at about 17.4 billion US dollars through 2031. Power is to come from on-site, off-grid Bloom Energy fuel cells. Nebius's project page says construction is ongoing and the AI factory is expected to be operational by 2027.

Source record as of 2026-10-09 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 39.42519, -75.01347 (Polygon locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (2)

DataOne Vineland Phase 2 Expansion Current Build

Under construction last observed as of · Authoritative status update

Source and location review
Status source
Vineland August 7 notice: Phase 2 building under construction evidence row
City of Vineland Planning Board · published 2026-08-07 · Government record
Locator
Campus locator · Official source · official_mapped_constituent_parcel_as_campus_locator evidence
Source checks

Not reviewed against imagery not_reviewed_for_core_preview
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 81 days before the data update on 2026-10-27

Nebius Vineland AI factory

Under construction last observed as of · Reported status

Location: Vineland, Cumberland County, New Jersey, US. City centroid from the Wikipedia infobox for Vineland (s7), which also gives Cumberland County. No street address or parcel appears in the cited sources. Nebius; Nebius; Nebius; Wikipedia

Use: Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacityup to 300 MWPlanned · Campus · Unspecified2025-05-02The filing describes the New Jersey site as a phased development scalable up to this amount; it gives no figure for the initial phase.U.S. Securities and Exchange Commission (Nebius Group filing)
Jobs permanentabout 200 countPlanned · Campus2026-07-10Nebius; Nebius
Jobs constructionabout 1,000 countPlanned · Campus2026-07-10Nebius; Nebius

Companies and organizations

NameRoleNotesSources
DataOneDeveloperDescribed as the AI factory designer and builder under a build-to-suit arrangement.Nebius; Nebius
DataOneOwnerNebius; Nebius
DataOneOperatorNebius; Nebius
NebiusTenantOwns and operates the servers and GPUs.Nebius; Nebius; Nebius
Northeast PrecastBuilderVineland-based construction partner.Nebius; Nebius
Bloom EnergyHardware supplierSupplier of the on-site fuel cells.Nebius; Nebius
MicrosoftTenantEnd customer buying dedicated GPU capacity from Nebius delivered from the Vineland site, rather than a direct lessee of the building.Nebius; U.S. Securities and Exchange Commission (Nebius Group filing)
City of VinelandGovernmentCity Council and mayor approved a five-year payment-in-lieu-of-taxes ordinance in January 2026.Nebius

Timeline

DateEventActual or plannedNotesSources
2025-H1Construction startedActualThe May 2025 filing says construction of the build-to-suit facility began in early 2025.U.S. Securities and Exchange Commission (Nebius Group filing)
2025-09-08OtherActualNebius signed a five-year agreement to provide Microsoft dedicated GPU capacity from the new Vineland data center, about 17.4 billion US dollars through 2031 and up to about 19.4 billion with options.Nebius; U.S. Securities and Exchange Commission (Nebius Group filing)
2026-01OtherActualVineland approved a five-year payment-in-lieu-of-taxes ordinance for the project.Nebius
2026-08-12OtherActualNebius reported it had delivered all capacity tranches under the Microsoft contract; the letter does not name the site.Nebius
2027First operationalPlannedNebius says the AI factory is expected to be operational by 2027.Nebius

Power supply

TypeDescriptionSources
Fuel cellOn-site Bloom Energy fuel cells described as off-grid generation, with Nebius saying it will bring and pay for its own power.Nebius; Nebius

The Vineland project page is undated; status_as_of is the date it was accessed, when it said construction was ongoing. Microsoft buys GPU capacity from Nebius rather than leasing the building.

Sources for these details
Companies
  • Developer: DataOne (unknown scope) evidence
  • Developer: DataOne (unknown scope) evidence
  • Owner: DataOne (unknown scope) evidence
  • Owner: DataOne (unknown scope) evidence
  • Operator: DataOne (unknown scope) evidence
  • Operator: DataOne (unknown scope) evidence
  • Tenant: Nebius (unknown scope) evidence
  • Tenant: Nebius (unknown scope) evidence
  • Tenant: Nebius (unknown scope) evidence
  • Builder: Northeast Precast (unknown scope) evidence
  • Builder: Northeast Precast (unknown scope) evidence
  • Hardware Supplier: Bloom Energy (unknown scope) evidence
  • Hardware Supplier: Bloom Energy (unknown scope) evidence
  • Tenant: Microsoft (unknown scope) evidence
  • Tenant: Microsoft (unknown scope) evidence
  • Government: City of Vineland (unknown scope) evidence
Source and location review
Status source
Nebius in Vineland, NJ project page evidence row
Nebius · publication date not stated · Company disclosure
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 18 days before the data update on 2026-10-27

Location details
Coordinates
39.42519, -75.01347
Geometry licence
no-open-license-asserted
Use scope
Campus locator
Scope class
official_mapped_constituent_parcel_as_campus_locator
Authority
Official source
Source entity
Campus
Method
municipal_block_lot_query_native_epsg3424_to_epsg4326
Derivation
exact_single_public_municipal_parcel_ring_server_projected_with_explicit_epsg1188
Precision scope
Only the exact municipal mapped Block 7503 Lot 35.01 parcel is selected to locate the one campus shared by both phases. Not a surveyed cadastral boundary, complete campus boundary, security fence, Phase 2 building footprint or active-work extent. Derived display anchor is not an additional authoritative point. Old Lot 33.01 is not added or inferred merged.
Horizontal uncertainty
Not reported

City expressly warns some GIS data use assumptions and estimates and supplies no numerical positional accuracy. Coordinate digits, projection agreement and transformation operation accuracy are not a survey-accuracy estimate.

Geometry evidence
1973e08d 62770f24 66c81dd1

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for DataOne Vineland Two-Phase AI Data Center Facility
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
August 18 hearing outcome and DataOne statement
Archived copy
WHYY / Zoe Read
News
Site distinctness contextno-open-license-assertedWHYY / Zoe Readb434bf014f6dbc9fa0b1615f56d776f6b09749f03596e047598fb4dede09e28f
Retained source material; see source provenance
City legal-notice index dates the exact DataOne PDF
Archived copy
City of Vineland
Government record
Site distinctness contextno-open-license-assertedCity of Vineland1c6b9cf088b844218693ad4883fcb4687af08e196af3007fe696c7af532643e3
Retained source material; see source provenance
DataOne Vineland undated construction and delivery context
Archived copy
DataOne
Company disclosure
Site distinctness contextnot statedno-open-license-assertedDataOne6542c20e3d641b48261990d6073e2346540d386e1e8795caa91f61312bb28aec
Retained source material; see source provenance
Nebius announces multi-billion dollar agreement with Microsoft for AI infrastructure
Archived copy
Nebius
Company disclosure
Imported: Geometry, Imported: Record, Milestone: Other, Tenant claimsource-terms-not-recordedNebiuscabb767f943f25efd08e245c34ef846df06a7d470c919d374a8b861201f85a49
Factual source record; not the publisher page
Nebius Group N.V. Form 6-K filed September 8, 2025
Archived copy
U.S. Securities and Exchange Commission (Nebius Group filing)
Regulatory filing
Imported: Record, Milestone: Other, Tenant claimsource-terms-not-recordedU.S. Securities and Exchange Commission (Nebius Group filing)2cfd727242f7812e2ca380f1877a4dd20c362cdb340fcae2dd9ec2bbc8b5a93c
Factual source record; not the publisher page
Nebius Group N.V. Form F-3ASR registration statement
Archived copy
U.S. Securities and Exchange Commission (Nebius Group filing)
Regulatory filing
Imported: Record, Metric: Power Capacity, Milestone: Construction Startedsource-terms-not-recordedU.S. Securities and Exchange Commission (Nebius Group filing)7a6b3a83ce3359b268de99a0ec97954912f797bbc9de3c59e483cde9cbc20046
Factual source record; not the publisher page
Nebius in Vineland, NJ project page
Archived copy
Nebius
Company disclosure
Imported: Geometry, Imported: Record, Imported: Status, Metric: Jobs Construction, Metric: Jobs Permanent, Milestone: First Operational, Milestone: Other, Power Source: Fuel Cell, Role: Builder, Role: Developer, Role: Government, Role: Hardware Supplier, Operator claim, Owner claim, Tenant claimnot statedsource-terms-not-recordedNebiusb0cdb305ed62e7e8e68ee68039fd95e6f876eecd50e8f52700e99a7d83b66ba7
Factual source record; not the publisher page
Nebius Q2 2026 letter to shareholders
Archived copy
Nebius
Company disclosure
Imported: Record, Milestone: Othersource-terms-not-recordedNebius75c2e321c657f8a75afd5e4c017031eacf890fd62a7be172b9fc3da5ad725dd7
Factual source record; not the publisher page
Nebius Vineland undated construction context
Archived copy
Nebius
Company disclosure
Site distinctness contextnot statedno-open-license-assertedNebiusf0e17b17f4ac56d04157d75776033ce5d0522031ba4e75d8269fb36807ea319e
Retained source material; see source provenance
Nebius x Vineland, NJ fact sheet
Archived copy
Nebius
Company disclosure
Imported: Geometry, Imported: Record, Metric: Jobs Construction, Metric: Jobs Permanent, Power Source: Fuel Cell, Role: Builder, Role: Developer, Role: Hardware Supplier, Operator claim, Owner claim, Tenant claimsource-terms-not-recordedNebius8500a66865402dd71ade00bc4d65c27e3d1984e1df47e9ee5c1ca1a750aa821c
Factual source record; not the publisher page
Post-cutoff generator investigation is not building completion
Archived copy
WHYY / Zoe Read
News
Site distinctness contextno-open-license-assertedWHYY / Zoe Read42ae683345550ab645ca01d4f48a7727932c897d53ea36faff1ff69ea30ecc97
Retained source material; see source provenance
Public document-host provenance for the two Vineland orders
Archived copy
The Woodbury Warbler / Jen Russell
News
Site distinctness contextno-open-license-assertedThe Woodbury Warbler / Jen Russell59fe66be49ec32c7937210592e2238c3014a1a3ee8591e96fdb2bb60aa200123
Retained source material; see source provenance
Vineland 2026-08-06 equipment-specific stop-construction order
Archived copy
City of Vineland construction official; scan hosted by The Woodbury Warbler
Government record
Site distinctness contextno-open-license-assertedCity of Vineland construction official; scan hosted by The Woodbury Warbler41bdc4b86f693381b2fc912239c0d5cfe40e92583909d7f04ec5f9b453ad0118
Retained source material; see source provenance
Vineland 2026-08-10 equipment-specific stop-construction order
Archived copy
City of Vineland construction official; scan hosted by The Woodbury Warbler
Government record
Site distinctness contextno-open-license-assertedCity of Vineland construction official; scan hosted by The Woodbury Warbler10c5d1a4d5e9bba0cad84145499f3d5a31b1fb17f9d38a0de00064d6220b4135
Retained source material; see source provenance
Vineland August 7 notice: Phase 2 building under construction
Archived copy
City of Vineland Planning Board
Government record
Geometry identity context, Site distinctness context, Physical statusno-open-license-assertedCity of Vineland Planning Board6b57210c952b865e8de1969b2f534ecb596ab35a271a85af87eac3e8b6c98aa3
Retained source material; see source provenance
Vineland exact DataOne Block 7503 Lot 35.01 native parcel
Archived copy
City of Vineland
Government record
Geometry identity context, Site distinctness context, Geometrynot statedno-open-license-assertedCity of Vineland GIS / Engineering273ea463d0c5d440d97371b786f7a7c251ec5ae56e9ac7dfcbe7c46be2995083
Retained source material; see source provenance
Vineland exact parcel with explicitly requested WGS84 transformation
Archived copy
City of Vineland
Government record
Site distinctness context, Geometrynot statedno-open-license-assertedCity of Vineland GIS / Engineering0f7ac063ce8ded83310ce701af988f9576190db5fa82be88a8d5efd385501452
Retained source material; see source provenance
Vineland parcel layer identity and explicit source CRS
Archived copy
City of Vineland
Government record
Site distinctness context, Geometrynot statedno-open-license-assertedCity of Vineland GIS / Engineeringf89bfdec8150e1688d660fa005df1a343613b73aa18960bfe341655327811586
Retained source material; see source provenance
Vineland parcel service public access and rights context
Archived copy
City of Vineland
Government record
Geometry identity context, Site distinctness contextnot statedno-open-license-assertedCity of Vineland GIS / Engineeringdf7e5c75535ce05760701fafd86fde5751cb338670a5a20eeb59f50159c39062
Retained source material; see source provenance
Vineland public block-and-lot query and map disclaimer
Archived copy
City of Vineland
Government record
Geometry identity context, Site distinctness contextnot statedno-open-license-assertedCity of Vineland GIS / Engineeringd20dc292009ba26386dfdb062d65353e3bc429003fa06f6b15c4c25e9f04e2cd
Retained source material; see source provenance
Vineland public viewer item metadata
Archived copy
City of Vineland
Government record
Geometry identity context, Site distinctness contextnot statedno-open-license-assertedCity of Vineland GIS / Engineeringca280476c1c8ca86bec1f8a5bff050c27bb305eca619423e415873b892b51dca
Retained source material; see source provenance
Vineland publicly links its GIS viewer and disclaims quantitative accuracy
Archived copy
City of Vineland
Government record
Geometry identity context, Site distinctness contextnot statedno-open-license-assertedCity of Vineland GIS / Engineering8f5168051635fec371df0cccc7499848b76aa29405c516161dd6c3133d21ef72
Retained source material; see source provenance
Vineland, New Jersey
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipediac2fae377ad2c72cea2cfa9dc53b50e1bdf1872a947dd9e5595fbc16f417025d0
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). DataOne Vineland Two-Phase AI Data Center Facility [site vcc-site-c14008c0552564c11274]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c14008c0552564c11274/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction