Meta Bowling Green data center

Under construction

United States · 1 project · Last reported

Summary

Meta data center campus of 715,000 square feet in Middleton Township, Wood County, Ohio, near Bowling Green, announced in April 2025 as an investment of more than USD 800 million and described as optimized for Meta's AI workloads. Meta's location list gives 2025 as the groundbreaking year. In February 2026 the Ohio Power Siting Board approved, without public hearings, a 350 MW behind-the-meter gas plant with about 120 MW of batteries next to the data center, to be built and run by Will-Power OH. Meta names Toledo Edison, FirstEnergy and Williams as energy-planning partners and refers readers to JE Dunn Construction for construction information.

Source record as of 2026-10-09 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 41.47430, -83.66610 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Meta Bowling Green data center

Under construction last observed as of · Reported status

Location: Middleton Township, Wood County, Ohio, US. Township point from OpenStreetMap Nominatim. BG Independent places the adjacent power plant at the northeast corner of Ohio 582 and Mercer Road, but no source gives the data center parcel itself. Meta Platforms; BG Independent News

Use: Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity350 MWPermitted · Campus · Onsite generation2026-02-03Net output of the behind-the-meter Apollo gas plant approved to serve only the adjacent Meta data center; the article gives no figure for the data center's own load.BG Independent News
Investmentmore than 800,000,000 USDAnnounced · Campus2025-04-09Meta Platforms; Meta Platforms; Meta Platforms
Floor area715,000 sq_ftPlanned · Campus2025-04-09Meta Platforms
Jobs constructionmore than 1,000 countPlanned · Campus2025-04-09Meta's fact sheet gives 1,000 without a qualifier.Meta Platforms; Meta Platforms
Jobs permanentabout 100 countPlanned · Campus2025-04-09Meta Platforms; Meta Platforms

Companies and organizations

NameRoleNotesSources
Meta PlatformsDeveloperMeta Platforms; Meta Platforms
JE Dunn ConstructionBuilderMeta refers readers to JE Dunn Construction for construction information.Meta Platforms
Toledo EdisonUtilityMeta says it planned the site's energy needs with Toledo Edison from the start.Meta Platforms
FirstEnergyUtilityNamed in Meta's fact sheet as an energy-planning partner.Meta Platforms
WilliamsPower supplierNamed in Meta's fact sheet as an energy-planning partner; its specific role is not described there.Meta Platforms
Will-Power OHPower supplierWill build and operate the adjacent behind-the-meter gas plant.BG Independent News
Ohio Power Siting BoardGovernmentApproved the adjacent gas plant in February 2026.BG Independent News

Timeline

DateEventActual or plannedNotesSources
2025-04-09AnnouncedActualMeta Platforms
2025Construction startedActualMeta's location list gives 2025 as the groundbreaking year.Meta Platforms
2026-02-03Permit approvedActualOhio Power Siting Board approval, under its expedited process, of the adjacent 350 MW Apollo gas plant.BG Independent News

Power supply

TypeDescriptionSources
Natural gas onsiteThe Apollo Power Generation Facility, a 350 MW gas plant on 147 acres next to the data center, is approved to serve only the data center with no physical grid connection. Will-Power OH will build and run it, with part of the output expected by mid-2027 and the rest by late 2027.BG Independent News
Battery storageAbout 120 MW of battery storage approved as part of the same plant.BG Independent News
GridMeta says it planned the site's energy needs with Toledo Edison, and names FirstEnergy and Williams as planning partners in its fact sheet; it says it pays the full cost of the energy used.Meta Platforms; Meta Platforms

The status rests on two undated Meta pages: the U.S. location list, which gives 2025 as the groundbreaking year, and the fact sheet, which describes the data center in the future tense. status_as_of is therefore the date both were read (2026-10-09). The fact sheet PDF shows no publication date; its embedded file creation date is 2026-09-01.

Sources for these details
Companies
  • Developer: Meta Platforms (unknown scope) evidence
  • Developer: Meta Platforms (unknown scope) evidence
  • Builder: JE Dunn Construction (unknown scope) evidence
  • Utility: Toledo Edison (unknown scope) evidence
  • Utility: FirstEnergy (unknown scope) evidence
  • Power Supplier: Williams (unknown scope) evidence
  • Power Supplier: Will-Power OH (unknown scope) evidence
  • Government: Ohio Power Siting Board (unknown scope) evidence
Source and location review
Status source
Meta Bowling Green Data Center fact sheet evidence row
Meta Platforms · publication date not stated · Company disclosure
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 18 days before the data update on 2026-10-27

Location details
Coordinates
41.47430, -83.66610
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Township point from OpenStreetMap Nominatim. BG Independent places the adjacent power plant at the northeast corner of Ohio 582 and Mercer Road, but no source gives the data center parcel itself.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
815af14a

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Meta Bowling Green data center
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Hello, Bowling Green!
Archived copy
Meta Platforms
Company disclosure
Imported: Geometry, Imported: Record, Metric: Floor Area, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Milestone: Announced, Power Source: Grid, Role: Builder, Role: Developer, Role: Utilitysource-terms-not-recordedMeta Platformsd9ae875c25ba9f11f63e2037fecd39a98beb22ea9b11064d1b4dd95f6517b3cf
Factual source record; not the publisher page
Meta Bowling Green Data Center fact sheet
Archived copy
Meta Platforms
Company disclosure
Imported: Record, Imported: Status, Metric: Investment, Metric: Jobs Permanent, Power Source: Grid, Role: Developer, Role: Power Supplier, Role: Utilitynot statedsource-terms-not-recordedMeta Platforms1974205c3bbf1d9c835d8f959f893b7963c3edb789d5690d98a0127068cc3d47
Factual source record; not the publisher page
Power plant for Meta data center in Wood County fast tracked – approved by state with no public hearings
Archived copy
BG Independent News
News
Imported: Geometry, Imported: Record, Metric: Power Capacity, Milestone: Permit Approved, Power Source: Battery Storage, Power Source: Natural Gas Onsite, Role: Government, Role: Power Suppliersource-terms-not-recordedBG Independent News7ddfac11bc2578d4c23cfd4065979091d9c535334dd605f452e82e15da96f7d9
Factual source record; not the publisher page
United States - Meta Data Centers
Archived copy
Meta Platforms
Company disclosure
Imported: Record, Imported: Status, Metric: Investment, Metric: Jobs Construction, Milestone: Construction Startednot statedsource-terms-not-recordedMeta Platforms4dbbb0f9003d185fbc65396f54f6e1889b2fa94777a5414d72a1cd689803eaf0
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Meta Bowling Green data center [site vcc-site-a39bc0fe88ed4e44ee52]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a39bc0fe88ed4e44ee52/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction