Meta Beaver Dam data center

Under construction

United States · 1 project · Last reported

Summary

Meta data center campus of more than 700,000 square feet in Beaver Dam, Wisconsin, announced in November 2025 as a USD 1 billion investment and described as optimized for Meta's AI workloads. Meta's fact sheet and location list now give the investment as USD 1 billion or more, and the list gives 2025 as the groundbreaking year. Meta says it planned its energy needs with Alliant Energy and pays the full cost of the power used, and it refers readers to Mortenson for construction information. Meta has not published a power capacity or an opening date.

Source record as of 2026-10-09 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 43.45780, -88.83730 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Meta Beaver Dam data center

Under construction last observed as of · Reported status

Location: Beaver Dam, Wisconsin, US. City point from OpenStreetMap Nominatim; Meta names the city but no site or road. Meta Platforms; Meta Platforms

Use: Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Investment1,000,000,000 USDAnnounced · Campus2025-11-12Meta's undated fact sheet and location list give USD 1 billion or more.Meta Platforms
Floor areamore than 700,000 sq_ftPlanned · Campus2025-11-12Meta Platforms
Jobs constructionabout 1,000 countPlanned · Campus2025-11-12The fact sheet and location list give more than 1,000 skilled trade workers on site at peak.Meta Platforms
Jobs permanentmore than 100 countPlanned · Campus2025-11-12Meta Platforms; Meta Platforms

Companies and organizations

NameRoleNotesSources
Meta PlatformsDeveloperMeta Platforms; Meta Platforms
MortensonBuilderMeta refers readers to Mortenson for construction information and opportunities.Meta Platforms
Alliant EnergyUtilityMeta says it planned its energy needs with Alliant Energy.Meta Platforms; Meta Platforms
City of Beaver DamGovernmentMeta says it pays the city the full cost of water and wastewater service.Meta Platforms

Timeline

DateEventActual or plannedNotesSources
2025-11-12AnnouncedActualMeta Platforms
2025Construction startedActualMeta's location list gives 2025 as the groundbreaking year.Meta Platforms

Power supply

TypeDescriptionSources
GridMeta says it planned its energy needs with Alliant Energy, pays the full cost of the energy used and matches the site's use with clean and renewable energy.Meta Platforms; Meta Platforms

The status rests on two undated Meta pages: the U.S. location list, which gives 2025 as the groundbreaking year, and the fact sheet, which describes the data center in the future tense. status_as_of is therefore the date both were read (2026-10-09). The fact sheet PDF shows no publication date; its embedded file creation date is 2026-09-01.

Sources for these details

Under 'Data centers within Alliant Energy's service area' the utility lists 'Meta | Beaver Dam, Wisconsin': 'Meta announced its $1 billion data center investment in Beaver Dam, Wisconsin, in November 2025. The project will be built in Alliant Energy's Beaver Dam Commerce Park.' It adds that 'Meta will also underwrite nearly $200 million in energy network improvements, substations and transmission lines to support the project', that Meta will donate $15 million to Alliant Energy's Hometown Care Energy Fund over the next decade, and that 'The site's electricity use will be matched with 100% clean and renewable energy.' The page also describes Alliant's data-centre rate safeguards and lists QTS and Google in Cedar Rapids and a potential QTS campus in Clinton, Iowa. No capacity, energisation date, substation name or construction stage is given. evidence

Alliant Energy Corporation · publication date not stated

The utility's release of the joint announcement says the AI-optimised campus of more than 700,000 square feet 'will be located in Alliant Energy's Beaver Dam Commerce Park', described as Wisconsin's largest certified site, shovel-ready since its WEDC designation in 2019, and that 'As part of its commitment to cover infrastructure costs to support the data center, Meta will underwrite nearly $200 million in energy infrastructure investments including network upgrades, utility substations, and transmission lines.' It gives Meta's expectation that the data center will come online in 2027 (a forecast) and names Alliant Energy as the utility serving Beaver Dam. evidence

Alliant Energy Corporation · published 2025-11-12

Lists about 1,100 Alliant Energy pages with last-modified dates, including our-energy/data-centers (2026-10-26) and the 12 November 2025 Meta Beaver Dam announcement (2025-11-12). evidence

Alliant Energy Corporation · publication date not stated

Companies
  • Developer: Meta Platforms (unknown scope) evidence
  • Developer: Meta Platforms (unknown scope) evidence
  • Builder: Mortenson (unknown scope) evidence
  • Utility: Alliant Energy (unknown scope) evidence
  • Utility: Alliant Energy (unknown scope) evidence
  • Government: City of Beaver Dam (unknown scope) evidence
Source and location review
Status source
Meta Beaver Dam Data Center fact sheet evidence row
Meta Platforms · publication date not stated · Company disclosure
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 18 days before the data update on 2026-10-27

Location details
Coordinates
43.45780, -88.83730
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
City point from OpenStreetMap Nominatim; Meta names the city but no site or road.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
38a97c43

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Meta Beaver Dam data center
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Alliant Energy news release: 'Meta announces $1 billion Data Center Investment in Beaver Dam, Wisconsin' (12 November 2025)
Archived copy
Alliant Energy Corporation
Utility record
Grid connection contextall-rights-reservedAlliant Energy Corporationf200d518b4ce90dd061eceef73180b90c2b1546b837b7eb9d93afea07dbf1a68
Retained source material; see source provenance
Alliant Energy website sitemap (sitemap.xml), captured 27 October 2026
Archived copy
Alliant Energy Corporation
Utility record
Grid connection contextnot statedall-rights-reservedAlliant Energy Corporation181e3046159e8606e84e785d0f7b7dcaee0ebd5d64011b60daff7e22e31147b2
Retained source material; see source provenance
Alliant Energy: 'Data centers' page (our-energy/data-centers), captured 27 October 2026 (sitemap lastmod 26 October 2026)
Archived copy
Alliant Energy Corporation
Utility record
Grid connection contextnot statedall-rights-reservedAlliant Energy Corporation98ec88dd55f26fc52ba3d005a86a86ca5a70046b62747be74a65114fa46af49b
Retained source material; see source provenance
Hello, Beaver Dam!
Archived copy
Meta Platforms
Company disclosure
Imported: Geometry, Imported: Record, Metric: Floor Area, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Milestone: Announced, Power Source: Grid, Role: Builder, Role: Developer, Role: Utilitysource-terms-not-recordedMeta Platformsf3b47bfcf5e71a2d22746a45cb47cc11a68df037ba58c28399124bfd184594cc
Factual source record; not the publisher page
Meta Beaver Dam Data Center fact sheet
Archived copy
Meta Platforms
Company disclosure
Imported: Geometry, Imported: Record, Imported: Status, Metric: Jobs Permanent, Power Source: Grid, Role: Developer, Role: Government, Role: Utilitynot statedsource-terms-not-recordedMeta Platforms894b4b75c55c4005db6feeccdbbc8048be8487ca0ca71e3e3699a3516265e3ca
Factual source record; not the publisher page
United States - Meta Data Centers
Archived copy
Meta Platforms
Company disclosure
Imported: Record, Imported: Status, Milestone: Construction Startednot statedsource-terms-not-recordedMeta Platforms399d8e7134b42db5037e326738eedb68b9ca15191b3837173172efec50da3ac6
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Meta Beaver Dam data center [site vcc-site-fcfc181b3d5d02fb0a65]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-fcfc181b3d5d02fb0a65/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction