CyrusOne Freestone County data center campus

Announced

United States · 1 project · Last reported

Summary

Multiphase data center campus planned by CyrusOne next to Calpine's Freestone Energy Center in Freestone County, Texas, about 80 miles southeast of Dallas near Fairfield. In February 2026 Calpine, by then part of Constellation, signed a 380 MW agreement providing power, grid connectivity and site infrastructure, plus an exclusive agreement to serve a second 380 MW phase. CyrusOne's campus page lists the project as in development and still awaiting county approval, with more than USD 500 million of investment across phases, power from both the grid and on-site generation, and closed-loop cooling.

Source record as of 2026-10-09 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 31.71830, -96.16970 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

CyrusOne Freestone County data center campus

Announced last observed as of · Reported status

Location: Fairfield, Freestone County, Texas, US. Coordinates are the Wikipedia centroid of Fairfield (s3). CyrusOne gives the Freestone Energy Center's Fairfield address (on FM 488) as the reference point and has no address for the data center itself; the site was not geocoded. CyrusOne; CyrusOne; Wikipedia

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity380 MWContracted · Phase · Unspecified · First phase (initial 380 MW agreement)2026-02-09The release does not name this tranche phase 1; it describes the second 380 MW block as phase 2.CyrusOne
Power capacity380 MWContracted · Phase · Unspecified · Phase 22026-02-09Calpine entered an exclusive agreement to provide power, grid connectivity and site infrastructure for this phase; the release counts it within more than 1,100 MW under contract for CyrusOne in Texas.CyrusOne
Investmentmore than 500,000,000 USDAnnounced · Campus2026-10-09Stated across multiple phases on CyrusOne's undated campus page.CyrusOne

Companies and organizations

NameRoleNotesSources
CyrusOneDeveloperCyrusOne; CyrusOne
CalpinePower supplierCalpine LLC, a business unit of Constellation, supplies power from its Freestone Energy Center.CyrusOne; CyrusOne

Timeline

DateEventActual or plannedNotesSources
2026-02-09AnnouncedActualCyrusOne

Power supply

TypeDescriptionSources
GridSupply and grid connection through the Calpine agreement at the Freestone Energy Center.CyrusOne; CyrusOne
OtherCyrusOne says the campus will also use on-site generation; its type and size are not stated.CyrusOne

The campus page is an undated living page (it mentions events in June 2026), so status_as_of is the access date. It says the project still needs approval and gives no capacity, building count or delivery dates. Only company sources were found; no independent coverage was opened. Constellation's release puts CyrusOne's contracted Texas capacity across sites at over 1,100 MW, including 400 MW at the separate Bosque County campus.

Sources for these details
Companies
  • Developer: CyrusOne (unknown scope) evidence
  • Developer: CyrusOne (unknown scope) evidence
  • Power Supplier: Calpine (unknown scope) evidence
  • Power Supplier: Calpine (unknown scope) evidence
Source and location review
Status source
Freestone County Data Center evidence row
CyrusOne · publication date not stated · Company disclosure
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 18 days before the data update on 2026-10-27

Location details
Coordinates
31.71830, -96.16970
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Coordinates are the Wikipedia centroid of Fairfield (s3). CyrusOne gives the Freestone Energy Center's Fairfield address (on FM 488) as the reference point and has no address for the data center itself; the site was not geocoded.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
1d917775

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for CyrusOne Freestone County data center campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Constellation and CyrusOne Announce Agreement to Support New Data Center Facility at Freestone Energy Center in Texas
Archived copy
CyrusOne
Company disclosure
Imported: Geometry, Imported: Record, Metric: Power Capacity, Milestone: Announced, Power Source: Grid, Role: Developer, Role: Power Suppliersource-terms-not-recordedCyrusOne712bc5d565a21b6af25175ee3ac35d2bf515ea19b44ff7b516d27eaa6b537291
Factual source record; not the publisher page
Fairfield, Texas
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia19cac6d7f30dc2838d0b4d7ef0e68efbba190f2222e01ea3508c114d77287054
Factual source record; not the publisher page
Freestone County Data Center
Archived copy
CyrusOne
Company disclosure
Imported: Geometry, Imported: Record, Imported: Status, Metric: Investment, Power Source: Grid, Power Source: Other, Role: Developer, Role: Power Suppliernot statedsource-terms-not-recordedCyrusOne35cc7987c15fe282a9ef451c84bad6500e481e88fb61380db44a6a08bdf4f209
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). CyrusOne Freestone County data center campus [site vcc-site-4776103546341c240223]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4776103546341c240223/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction