CyrusOne Freestone County data center campus
Announced
United States · 1 project · Last reported
Summary
Multiphase data center campus planned by CyrusOne next to Calpine's Freestone Energy Center in Freestone County, Texas, about 80 miles southeast of Dallas near Fairfield. In February 2026 Calpine, by then part of Constellation, signed a 380 MW agreement providing power, grid connectivity and site infrastructure, plus an exclusive agreement to serve a second 380 MW phase. CyrusOne's campus page lists the project as in development and still awaiting county approval, with more than USD 500 million of investment across phases, power from both the grid and on-site generation, and closed-loop cooling.
Source record as of 2026-10-09 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 31.71830, -96.16970 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Town or locality reference only; the facility position is not established.
Projects (1)
CyrusOne Freestone County data center campus
Announced last observed as of · Reported status
Location: Fairfield, Freestone County, Texas, US. Coordinates are the Wikipedia centroid of Fairfield (s3). CyrusOne gives the Freestone Energy Center's Fairfield address (on FM 488) as the reference point and has no address for the data center itself; the site was not geocoded. CyrusOne; CyrusOne; Wikipedia
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | 380 MW | Contracted · Phase · Unspecified · First phase (initial 380 MW agreement) | 2026-02-09 | The release does not name this tranche phase 1; it describes the second 380 MW block as phase 2. | CyrusOne |
| Power capacity | 380 MW | Contracted · Phase · Unspecified · Phase 2 | 2026-02-09 | Calpine entered an exclusive agreement to provide power, grid connectivity and site infrastructure for this phase; the release counts it within more than 1,100 MW under contract for CyrusOne in Texas. | CyrusOne |
| Investment | more than 500,000,000 USD | Announced · Campus | 2026-10-09 | Stated across multiple phases on CyrusOne's undated campus page. | CyrusOne |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| CyrusOne | Developer | CyrusOne; CyrusOne | |
| Calpine | Power supplier | Calpine LLC, a business unit of Constellation, supplies power from its Freestone Energy Center. | CyrusOne; CyrusOne |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2026-02-09 | Announced | Actual | CyrusOne |
Power supply
| Type | Description | Sources |
|---|---|---|
| Grid | Supply and grid connection through the Calpine agreement at the Freestone Energy Center. | CyrusOne; CyrusOne |
| Other | CyrusOne says the campus will also use on-site generation; its type and size are not stated. | CyrusOne |
The campus page is an undated living page (it mentions events in June 2026), so status_as_of is the access date. It says the project still needs approval and gives no capacity, building count or delivery dates. Only company sources were found; no independent coverage was opened. Constellation's release puts CyrusOne's contracted Texas capacity across sites at over 1,100 MW, including 400 MW at the separate Bosque County campus.
Sources for these details
- Constellation and CyrusOne Announce Agreement to Support New Data Center Facility at Freestone Energy Center in Texas — CyrusOne; 2026-02-09
- Freestone County Data Center — CyrusOne; publication date not stated
- Fairfield, Texas — Wikipedia; publication date not stated · Archived source
- Companies
Source and location review
- Status source
- Freestone County Data Center evidence row
CyrusOne · publication date not stated · Company disclosure - Locator
- Locality reference only · Compiled location reference · locality evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 18 days before the data update on 2026-10-27
Location details
- Coordinates
- 31.71830, -96.16970
- Geometry licence
- source-terms-not-recorded
- Use scope
- Locality reference only
- Scope class
- locality
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- Coordinates are the Wikipedia centroid of Fairfield (s3). CyrusOne gives the Freestone Energy Center's Fairfield address (on FM 488) as the reference point and has no address for the data center itself; the site was not geocoded.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- 1d917775
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Constellation and CyrusOne Announce Agreement to Support New Data Center Facility at Freestone Energy Center in Texas Archived copy | CyrusOne Company disclosure | Imported: Geometry, Imported: Record, Metric: Power Capacity, Milestone: Announced, Power Source: Grid, Role: Developer, Role: Power Supplier | source-terms-not-recorded | CyrusOne | 712bc5d565a21b6af25175ee3ac35d2bf515ea19b44ff7b516d27eaa6b537291Factual source record; not the publisher page | ||
| Fairfield, Texas Archived copy | Wikipedia Other | Imported: Geometry, Imported: Record | not stated | source-terms-not-recorded | Wikipedia | 19cac6d7f30dc2838d0b4d7ef0e68efbba190f2222e01ea3508c114d77287054Factual source record; not the publisher page | |
| Freestone County Data Center Archived copy | CyrusOne Company disclosure | Imported: Geometry, Imported: Record, Imported: Status, Metric: Investment, Power Source: Grid, Power Source: Other, Role: Developer, Role: Power Supplier | not stated | source-terms-not-recorded | CyrusOne | 35cc7987c15fe282a9ef451c84bad6500e481e88fb61380db44a6a08bdf4f209Factual source record; not the publisher page |
Cite this site
Kyars, K. (2026). CyrusOne Freestone County data center campus [site vcc-site-4776103546341c240223]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4776103546341c240223/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction