TeraWulf Lake Hawkeye data campus
Announced
United States · 1 project · Last reported
Summary
TeraWulf plan to redevelop about 183 leased acres of the former coal-fired Cayuga power plant site on Cayuga Lake in Lansing, Tompkins County, New York, into a high-performance computing campus. Its 80-year ground lease, announced in August 2025, gives exclusive rights to develop up to 400 MW, and TeraWulf first expected 138 MW online in late 2026. That timeline slipped: the project was in town site plan review in May 2026, faced county and resident opposition, and by August 2026 TeraWulf called it a longer-term redevelopment of about 400 MW gross, 320 MW of critical IT load, with operations not expected before about 2029.
Source record as of 2026-08-05 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 42.56580, -76.53190 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Town or locality reference only; the facility position is not established.
Projects (1)
TeraWulf Lake Hawkeye data campus
Announced last observed as of · Reported status
Location: Lansing, Tompkins County, New York, US. Sources place the site at the former Cayuga power plant in the town of Lansing without an address. Coordinates are the town point from the Lansing, New York Wikipedia article, not the plant site. TeraWulf; WBNG; FingerLakes1.com; Wikipedia
Use: Hpc, Ai unspecified
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | about 400 MW | Planned · Campus · Facility | 2026-08-05 | The lease grants exclusive rights to develop up to 400 MW; the August 2026 release gives about 400 MW gross, subject to permitting and site development. | TeraWulf; TeraWulf |
| Power capacity | about 320 MW | Planned · Campus · It load | 2026-08-05 | TeraWulf | |
| Power capacity | about 150 MW | Planned · Phase · Unspecified · Phase I | 2026-05-08 | Power available in Phase I, expanding to 300 MW in Phase II, per the Q1 2026 release. In August 2025 TeraWulf had expected 138 MW ready for service in the second half of 2026. | TeraWulf |
| Land area | about 183 acres | Reported · Campus | 2025-08-14 | Leased, not owned: an 80-year ground lease on part of a former coal-fired power plant site. | TeraWulf; TeraWulf |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| TeraWulf | Developer | Holds an 80-year ground lease with reciprocal purchase and sale options from year 50. | TeraWulf; TeraWulf; TeraWulf |
| Cayuga Operating Company | Owner | Lessor under the 80-year ground lease; TeraWulf discloses that the Cayuga site is owned by its chief executive. | TeraWulf |
| Tompkins County | Government | County legislators passed a resolution in January 2026 asking state regulators for a more thorough review of the project. | WBNG |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2025-08-14 | Announced | Actual | TeraWulf announced the long-term ground lease at the Cayuga site for high-performance computing. | TeraWulf |
| 2026-05-08 | Other | Actual | TeraWulf reported the project in site plan review. | TeraWulf |
| 2026-07-14 | Other | Actual | A New York executive order paused discretionary permits for certain AI data centers for up to a year; TeraWulf said the project was still in early planning and operations would fall after the pause. | FingerLakes1.com |
| 2029 | First operational | Planned | TeraWulf does not expect operations until about 2029; its August 2025 target had been the second half of 2026. | TeraWulf |
Power supply
| Type | Description | Sources |
|---|---|---|
| Solar | TeraWulf said in August 2025 that a solar installation of about 67 MW was planned, without saying where. | TeraWulf |
| Battery storage | An 800 MWh battery storage system was in advanced development on adjacent parcels, per TeraWulf in August 2025. | TeraWulf |
Capacity figures shifted across TeraWulf releases: 138 MW for 2026 (August 2025), about 150 MW then 300 MW in two phases (May 2026), and about 400 MW gross and 320 MW IT longer term (August 2026). Local reporting says TeraWulf has pledged not to use lake water for cooling but has applied to renew a water withdrawal permit. WBNG dates the original lease rights to 2019, while TeraWulf announced the ground lease in August 2025.
Sources for these details
- TeraWulf secures long-term ground lease at Cayuga site to expand high-performance computing infrastructure — TeraWulf; 2025-08-14
- TeraWulf reports first quarter 2026 results — TeraWulf; 2026-05-08
- TeraWulf reports second quarter 2026 results — TeraWulf; 2026-08-05 · Archived source
- Tompkins County residents oppose AI data center on Cayuga Lake — WBNG; 2026-01-28
- What's next for Lansing data center after state moratorium? — FingerLakes1.com; 2026-07-22 · Archived source
- Lansing, New York — Wikipedia; publication date not stated
- Companies
Source and location review
- Status source
- TeraWulf reports second quarter 2026 results evidence row
TeraWulf · published 2026-08-05 · Company disclosure - Locator
- Locality reference only · Compiled location reference · locality evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 83 days before the data update on 2026-10-27
Location details
- Coordinates
- 42.56580, -76.53190
- Geometry licence
- source-terms-not-recorded
- Use scope
- Locality reference only
- Scope class
- locality
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- Sources place the site at the former Cayuga power plant in the town of Lansing without an address. Coordinates are the town point from the Lansing, New York Wikipedia article, not the plant site.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- 17da0c46
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Lansing, New York Archived copy | Wikipedia Other | Imported: Geometry, Imported: Record | not stated | source-terms-not-recorded | Wikipedia | eee3a2bfcd7202411ab1cb70f43a12e2e581d80cf47b8e47fe2e8de843cd5421Factual source record; not the publisher page | |
| TeraWulf reports first quarter 2026 results Archived copy | TeraWulf Company disclosure | Imported: Record, Metric: Land Area, Metric: Power Capacity, Milestone: Other, Role: Developer | source-terms-not-recorded | TeraWulf | 4154aded51b3c7e71144a1b36c9e721965a6c8969a9b2d531bd98f9f657dafddFactual source record; not the publisher page | ||
| TeraWulf reports second quarter 2026 results Archived copy | TeraWulf Company disclosure | Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: First Operational, Role: Developer | source-terms-not-recorded | TeraWulf | 332c91af6595bbec0f5d3422590e459075b8ea3382432b88052b40d1d7f227dcFactual source record; not the publisher page | ||
| TeraWulf secures long-term ground lease at Cayuga site to expand high-performance computing infrastructure Archived copy | TeraWulf Company disclosure | Imported: Geometry, Imported: Record, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Power Source: Battery Storage, Power Source: Solar, Role: Developer, Owner claim | source-terms-not-recorded | TeraWulf | 2ce15f6d78da5339c09aa98fca59df3c59c5b8a5198bed3be5bfd4679760ec1fFactual source record; not the publisher page | ||
| Tompkins County residents oppose AI data center on Cayuga Lake Archived copy | WBNG News | Imported: Geometry, Imported: Record, Role: Government | source-terms-not-recorded | WBNG | 7570569e495b606e61e3dcbb433333d318420342ddd6fb3830da408523e400bcFactual source record; not the publisher page | ||
| What's next for Lansing data center after state moratorium? Archived copy | FingerLakes1.com News | Imported: Geometry, Imported: Record, Milestone: Other | source-terms-not-recorded | FingerLakes1.com | 73904c8314acb4989ab217d5cf2ec81c3c925d2cfc2092e25316f0f066da8edfFactual source record; not the publisher page |