TeraWulf Lake Hawkeye data campus

Announced

United States · 1 project · Last reported

Summary

TeraWulf plan to redevelop about 183 leased acres of the former coal-fired Cayuga power plant site on Cayuga Lake in Lansing, Tompkins County, New York, into a high-performance computing campus. Its 80-year ground lease, announced in August 2025, gives exclusive rights to develop up to 400 MW, and TeraWulf first expected 138 MW online in late 2026. That timeline slipped: the project was in town site plan review in May 2026, faced county and resident opposition, and by August 2026 TeraWulf called it a longer-term redevelopment of about 400 MW gross, 320 MW of critical IT load, with operations not expected before about 2029.

Source record as of 2026-08-05 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 42.56580, -76.53190 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

TeraWulf Lake Hawkeye data campus

Announced last observed as of · Reported status

Location: Lansing, Tompkins County, New York, US. Sources place the site at the former Cayuga power plant in the town of Lansing without an address. Coordinates are the town point from the Lansing, New York Wikipedia article, not the plant site. TeraWulf; WBNG; FingerLakes1.com; Wikipedia

Use: Hpc, Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacityabout 400 MWPlanned · Campus · Facility2026-08-05The lease grants exclusive rights to develop up to 400 MW; the August 2026 release gives about 400 MW gross, subject to permitting and site development.TeraWulf; TeraWulf
Power capacityabout 320 MWPlanned · Campus · It load2026-08-05TeraWulf
Power capacityabout 150 MWPlanned · Phase · Unspecified · Phase I2026-05-08Power available in Phase I, expanding to 300 MW in Phase II, per the Q1 2026 release. In August 2025 TeraWulf had expected 138 MW ready for service in the second half of 2026.TeraWulf
Land areaabout 183 acresReported · Campus2025-08-14Leased, not owned: an 80-year ground lease on part of a former coal-fired power plant site.TeraWulf; TeraWulf

Companies and organizations

NameRoleNotesSources
TeraWulfDeveloperHolds an 80-year ground lease with reciprocal purchase and sale options from year 50.TeraWulf; TeraWulf; TeraWulf
Cayuga Operating CompanyOwnerLessor under the 80-year ground lease; TeraWulf discloses that the Cayuga site is owned by its chief executive.TeraWulf
Tompkins CountyGovernmentCounty legislators passed a resolution in January 2026 asking state regulators for a more thorough review of the project.WBNG

Timeline

DateEventActual or plannedNotesSources
2025-08-14AnnouncedActualTeraWulf announced the long-term ground lease at the Cayuga site for high-performance computing.TeraWulf
2026-05-08OtherActualTeraWulf reported the project in site plan review.TeraWulf
2026-07-14OtherActualA New York executive order paused discretionary permits for certain AI data centers for up to a year; TeraWulf said the project was still in early planning and operations would fall after the pause.FingerLakes1.com
2029First operationalPlannedTeraWulf does not expect operations until about 2029; its August 2025 target had been the second half of 2026.TeraWulf

Power supply

TypeDescriptionSources
SolarTeraWulf said in August 2025 that a solar installation of about 67 MW was planned, without saying where.TeraWulf
Battery storageAn 800 MWh battery storage system was in advanced development on adjacent parcels, per TeraWulf in August 2025.TeraWulf

Capacity figures shifted across TeraWulf releases: 138 MW for 2026 (August 2025), about 150 MW then 300 MW in two phases (May 2026), and about 400 MW gross and 320 MW IT longer term (August 2026). Local reporting says TeraWulf has pledged not to use lake water for cooling but has applied to renew a water withdrawal permit. WBNG dates the original lease rights to 2019, while TeraWulf announced the ground lease in August 2025.

Sources for these details
Companies
  • Developer: TeraWulf (unknown scope) evidence
  • Developer: TeraWulf (unknown scope) evidence
  • Developer: TeraWulf (unknown scope) evidence
  • Owner: Cayuga Operating Company (unknown scope) evidence
  • Government: Tompkins County (unknown scope) evidence
Source and location review
Status source
TeraWulf reports second quarter 2026 results evidence row
TeraWulf · published 2026-08-05 · Company disclosure
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 83 days before the data update on 2026-10-27

Location details
Coordinates
42.56580, -76.53190
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Sources place the site at the former Cayuga power plant in the town of Lansing without an address. Coordinates are the town point from the Lansing, New York Wikipedia article, not the plant site.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
17da0c46

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for TeraWulf Lake Hawkeye data campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Lansing, New York
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipediaeee3a2bfcd7202411ab1cb70f43a12e2e581d80cf47b8e47fe2e8de843cd5421
Factual source record; not the publisher page
TeraWulf reports first quarter 2026 results
Archived copy
TeraWulf
Company disclosure
Imported: Record, Metric: Land Area, Metric: Power Capacity, Milestone: Other, Role: Developersource-terms-not-recordedTeraWulf4154aded51b3c7e71144a1b36c9e721965a6c8969a9b2d531bd98f9f657dafdd
Factual source record; not the publisher page
TeraWulf reports second quarter 2026 results
Archived copy
TeraWulf
Company disclosure
Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: First Operational, Role: Developersource-terms-not-recordedTeraWulf332c91af6595bbec0f5d3422590e459075b8ea3382432b88052b40d1d7f227dc
Factual source record; not the publisher page
TeraWulf secures long-term ground lease at Cayuga site to expand high-performance computing infrastructure
Archived copy
TeraWulf
Company disclosure
Imported: Geometry, Imported: Record, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Power Source: Battery Storage, Power Source: Solar, Role: Developer, Owner claimsource-terms-not-recordedTeraWulf2ce15f6d78da5339c09aa98fca59df3c59c5b8a5198bed3be5bfd4679760ec1f
Factual source record; not the publisher page
Tompkins County residents oppose AI data center on Cayuga Lake
Archived copy
WBNG
News
Imported: Geometry, Imported: Record, Role: Governmentsource-terms-not-recordedWBNG7570569e495b606e61e3dcbb433333d318420342ddd6fb3830da408523e400bc
Factual source record; not the publisher page
What's next for Lansing data center after state moratorium?
Archived copy
FingerLakes1.com
News
Imported: Geometry, Imported: Record, Milestone: Othersource-terms-not-recordedFingerLakes1.com73904c8314acb4989ab217d5cf2ec81c3c925d2cfc2092e25316f0f066da8edf
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). TeraWulf Lake Hawkeye data campus [site vcc-site-a291a33ca480670cccf1]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a291a33ca480670cccf1/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction