Microsoft Pecos datacenter campus

Announced

United States · 1 project · Last reported

Summary

Microsoft campus announced in June 2026 for Pecos in Reeves County, West Texas, adding about 2 GW of capacity for AI and cloud services through a multibillion-dollar investment over five to seven years. At launch it will run behind the meter on a co-located gas plant, Chevron's Project Kilby, built with Engine No. 1 and GE Vernova and sized to reach 2.67 GW in phases under a 20-year power deal; first power is expected in 2028, subject to Chevron's final investment decision. Microsoft says it funds the generation, plans to connect to the wider grid later, and will use closed-loop cooling.

Source record as of 2026-07-02 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 31.41560, -103.50000 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Microsoft Pecos datacenter campus

Announced last observed as of · Reported status

Location: Pecos, Reeves County, Texas, US. Coordinates are the Pecos city coordinates from its Wikipedia page. Sources name Pecos and Reeves County but give no site or acreage. Microsoft; The Energy Mag; Wikipedia

Use: Ai unspecified, Cloud

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacityabout 2,000 MWPlanned · Campus · Unspecified2026-06-22Capacity Microsoft says the campus adds to its global datacenter fleet.Microsoft; Orrick; The Energy Mag; W.Media
Power capacity2,670 MWPlanned · Campus · Onsite generation2026-06-23Chevron's co-located Project Kilby gas plant, to be built in modular phases and run behind the meter for the campus; subject to a final investment decision.The Energy Mag; W.Media
Jobs constructionmore than 6,000 countPlanned · Campus2026-06-22At peak build-out; Microsoft also expects hundreds of permanent operational jobs.Microsoft; Orrick; The Energy Mag

Companies and organizations

NameRoleNotesSources
MicrosoftDeveloperMicrosoft; Orrick
Chevron (Energy Forge One LLC)Power supplierEnergy Forge One LLC, a wholly owned Chevron subsidiary, signed a 20-year, multi-gigawatt power purchase agreement to supply the campus from the co-located Project Kilby gas plant.Orrick; The Energy Mag; W.Media
Engine No. 1Power supplierDeveloping Project Kilby with Chevron.The Energy Mag; W.Media

Timeline

DateEventActual or plannedNotesSources
2026-06-22AnnouncedActualMicrosoft; The Energy Mag
2028OtherPlannedProject Kilby is expected to begin delivering power, subject to Chevron's final investment decision expected later in 2026.The Energy Mag; W.Media

Power supply

TypeDescriptionSources
Natural gas onsiteCo-located Project Kilby gas plant by Chevron with Engine No. 1, using GE Vernova turbines plus Solar Turbines units, designed to scale to 2.67 GW and operate behind the meter with selective catalytic reduction for nitrogen oxides; Microsoft says it funds the new generation.Microsoft; The Energy Mag; W.Media
GridMicrosoft expects to connect the plant and campus to the wider grid over time, in coordination with utilities and local authorities; no timeline is given.Microsoft; The Energy Mag

Microsoft gives no dollar figure beyond a multibillion-dollar investment, so no investment metric is recorded. Whether the 2 GW is IT or facility power is not stated. No report of construction start was found as of October 2026.

Sources for these details
Companies
  • Developer: Microsoft (unknown scope) evidence
  • Developer: Microsoft (unknown scope) evidence
  • Power Supplier: Chevron (Energy Forge One LLC) (unknown scope) evidence
  • Power Supplier: Chevron (Energy Forge One LLC) (unknown scope) evidence
  • Power Supplier: Chevron (Energy Forge One LLC) (unknown scope) evidence
  • Power Supplier: Engine No. 1 (unknown scope) evidence
  • Power Supplier: Engine No. 1 (unknown scope) evidence
Source and location review
Status source
Powering the next wave of AI: Expanding capacity with our new datacenter in Pecos evidence row
Microsoft · published 2026-06-22 · Company disclosure
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 117 days before the data update on 2026-10-27

Location details
Coordinates
31.41560, -103.50000
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Coordinates are the Pecos city coordinates from its Wikipedia page. Sources name Pecos and Reeves County but give no site or acreage.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
ebbafd06

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Microsoft Pecos datacenter campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Microsoft Expands Global Data Center Capacity with 2 GW Data Center and Co-Located Power Facility in West Texas
Archived copy
Orrick
Other
Imported: Record, Imported: Status, Metric: Jobs Construction, Metric: Power Capacity, Role: Developer, Role: Power Suppliersource-terms-not-recordedOrrickb2b3c2970ca13ab353dffa6409518568eee854f88836d76239287cd1ab267623
Factual source record; not the publisher page
Microsoft to Build 2GW AI Data Center Campus in West Texas With Onsite Gas Power
Archived copy
The Energy Mag
Trade publication
Imported: Geometry, Imported: Record, Metric: Jobs Construction, Metric: Power Capacity, Milestone: Announced, Milestone: Other, Power Source: Grid, Power Source: Natural Gas Onsite, Role: Power Suppliersource-terms-not-recordedThe Energy Mag11080b16399692264bd226cf6b14a670478d2d14beb671ec21585e6356c1345f
Factual source record; not the publisher page
Microsoft's upcoming data center campus in Texas to expand global capacity by 2 GW
Archived copy
W.Media
Trade publication
Imported: Record, Metric: Power Capacity, Milestone: Other, Power Source: Natural Gas Onsite, Role: Power Suppliersource-terms-not-recordedW.Mediac7dd08a9454a7a31911529a95280dd38e276c02616468480db1af4cd099ba969
Factual source record; not the publisher page
Pecos, Texas
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia998d0edeb424690f74b36a46bc011e28846de154bc7eb22c6f1e6ce11c7aa9e2
Factual source record; not the publisher page
Powering the next wave of AI: Expanding capacity with our new datacenter in Pecos
Archived copy
Microsoft
Company disclosure
Imported: Geometry, Imported: Record, Imported: Status, Metric: Jobs Construction, Metric: Power Capacity, Milestone: Announced, Power Source: Grid, Power Source: Natural Gas Onsite, Role: Developersource-terms-not-recordedMicrosoft94b21a2e19a5bb402d4e53e743d9d7a0dd71dd63e25460a0fb97742599b904ee
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Microsoft Pecos datacenter campus [site vcc-site-91ad5264ef3af020a0ed]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-91ad5264ef3af020a0ed/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction