Microsoft Pecos datacenter campus
Announced
United States · 1 project · Last reported
Summary
Microsoft campus announced in June 2026 for Pecos in Reeves County, West Texas, adding about 2 GW of capacity for AI and cloud services through a multibillion-dollar investment over five to seven years. At launch it will run behind the meter on a co-located gas plant, Chevron's Project Kilby, built with Engine No. 1 and GE Vernova and sized to reach 2.67 GW in phases under a 20-year power deal; first power is expected in 2028, subject to Chevron's final investment decision. Microsoft says it funds the generation, plans to connect to the wider grid later, and will use closed-loop cooling.
Source record as of 2026-07-02 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 31.41560, -103.50000 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Town or locality reference only; the facility position is not established.
Projects (1)
Microsoft Pecos datacenter campus
Announced last observed as of · Reported status
Location: Pecos, Reeves County, Texas, US. Coordinates are the Pecos city coordinates from its Wikipedia page. Sources name Pecos and Reeves County but give no site or acreage. Microsoft; The Energy Mag; Wikipedia
Use: Ai unspecified, Cloud
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | about 2,000 MW | Planned · Campus · Unspecified | 2026-06-22 | Capacity Microsoft says the campus adds to its global datacenter fleet. | Microsoft; Orrick; The Energy Mag; W.Media |
| Power capacity | 2,670 MW | Planned · Campus · Onsite generation | 2026-06-23 | Chevron's co-located Project Kilby gas plant, to be built in modular phases and run behind the meter for the campus; subject to a final investment decision. | The Energy Mag; W.Media |
| Jobs construction | more than 6,000 count | Planned · Campus | 2026-06-22 | At peak build-out; Microsoft also expects hundreds of permanent operational jobs. | Microsoft; Orrick; The Energy Mag |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| Microsoft | Developer | Microsoft; Orrick | |
| Chevron (Energy Forge One LLC) | Power supplier | Energy Forge One LLC, a wholly owned Chevron subsidiary, signed a 20-year, multi-gigawatt power purchase agreement to supply the campus from the co-located Project Kilby gas plant. | Orrick; The Energy Mag; W.Media |
| Engine No. 1 | Power supplier | Developing Project Kilby with Chevron. | The Energy Mag; W.Media |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2026-06-22 | Announced | Actual | Microsoft; The Energy Mag | |
| 2028 | Other | Planned | Project Kilby is expected to begin delivering power, subject to Chevron's final investment decision expected later in 2026. | The Energy Mag; W.Media |
Power supply
| Type | Description | Sources |
|---|---|---|
| Natural gas onsite | Co-located Project Kilby gas plant by Chevron with Engine No. 1, using GE Vernova turbines plus Solar Turbines units, designed to scale to 2.67 GW and operate behind the meter with selective catalytic reduction for nitrogen oxides; Microsoft says it funds the new generation. | Microsoft; The Energy Mag; W.Media |
| Grid | Microsoft expects to connect the plant and campus to the wider grid over time, in coordination with utilities and local authorities; no timeline is given. | Microsoft; The Energy Mag |
Microsoft gives no dollar figure beyond a multibillion-dollar investment, so no investment metric is recorded. Whether the 2 GW is IT or facility power is not stated. No report of construction start was found as of October 2026.
Sources for these details
- Powering the next wave of AI: Expanding capacity with our new datacenter in Pecos — Microsoft; 2026-06-22
- Microsoft Expands Global Data Center Capacity with 2 GW Data Center and Co-Located Power Facility in West Texas — Orrick; 2026-07-02
- Microsoft to Build 2GW AI Data Center Campus in West Texas With Onsite Gas Power — The Energy Mag; 2026-06-22
- Microsoft's upcoming data center campus in Texas to expand global capacity by 2 GW — W.Media; 2026-06-23
- Pecos, Texas — Wikipedia; publication date not stated
- Companies
- Developer: Microsoft (unknown scope) evidence
- Developer: Microsoft (unknown scope) evidence
- Power Supplier: Chevron (Energy Forge One LLC) (unknown scope) evidence
- Power Supplier: Chevron (Energy Forge One LLC) (unknown scope) evidence
- Power Supplier: Chevron (Energy Forge One LLC) (unknown scope) evidence
- Power Supplier: Engine No. 1 (unknown scope) evidence
- Power Supplier: Engine No. 1 (unknown scope) evidence
Source and location review
- Status source
- Powering the next wave of AI: Expanding capacity with our new datacenter in Pecos evidence row
Microsoft · published 2026-06-22 · Company disclosure - Locator
- Locality reference only · Compiled location reference · locality evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 117 days before the data update on 2026-10-27
Location details
- Coordinates
- 31.41560, -103.50000
- Geometry licence
- source-terms-not-recorded
- Use scope
- Locality reference only
- Scope class
- locality
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- Coordinates are the Pecos city coordinates from its Wikipedia page. Sources name Pecos and Reeves County but give no site or acreage.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- ebbafd06
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Microsoft Expands Global Data Center Capacity with 2 GW Data Center and Co-Located Power Facility in West Texas Archived copy | Orrick Other | Imported: Record, Imported: Status, Metric: Jobs Construction, Metric: Power Capacity, Role: Developer, Role: Power Supplier | source-terms-not-recorded | Orrick | b2b3c2970ca13ab353dffa6409518568eee854f88836d76239287cd1ab267623Factual source record; not the publisher page | ||
| Microsoft to Build 2GW AI Data Center Campus in West Texas With Onsite Gas Power Archived copy | The Energy Mag Trade publication | Imported: Geometry, Imported: Record, Metric: Jobs Construction, Metric: Power Capacity, Milestone: Announced, Milestone: Other, Power Source: Grid, Power Source: Natural Gas Onsite, Role: Power Supplier | source-terms-not-recorded | The Energy Mag | 11080b16399692264bd226cf6b14a670478d2d14beb671ec21585e6356c1345fFactual source record; not the publisher page | ||
| Microsoft's upcoming data center campus in Texas to expand global capacity by 2 GW Archived copy | W.Media Trade publication | Imported: Record, Metric: Power Capacity, Milestone: Other, Power Source: Natural Gas Onsite, Role: Power Supplier | source-terms-not-recorded | W.Media | c7dd08a9454a7a31911529a95280dd38e276c02616468480db1af4cd099ba969Factual source record; not the publisher page | ||
| Pecos, Texas Archived copy | Wikipedia Other | Imported: Geometry, Imported: Record | not stated | source-terms-not-recorded | Wikipedia | 998d0edeb424690f74b36a46bc011e28846de154bc7eb22c6f1e6ce11c7aa9e2Factual source record; not the publisher page | |
| Powering the next wave of AI: Expanding capacity with our new datacenter in Pecos Archived copy | Microsoft Company disclosure | Imported: Geometry, Imported: Record, Imported: Status, Metric: Jobs Construction, Metric: Power Capacity, Milestone: Announced, Power Source: Grid, Power Source: Natural Gas Onsite, Role: Developer | source-terms-not-recorded | Microsoft | 94b21a2e19a5bb402d4e53e743d9d7a0dd71dd63e25460a0fb97742599b904eeFactual source record; not the publisher page |
Cite this site
Kyars, K. (2026). Microsoft Pecos datacenter campus [site vcc-site-91ad5264ef3af020a0ed]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-91ad5264ef3af020a0ed/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction