Google Kansas City data center campus (Hunt Midwest Business Center)
Under construction
United States · 1 project · Last reported
Summary
Google's first Missouri data center campus, at the Hunt Midwest Business Center off NE Parvin Road in Kansas City's Northland (Clay County). Google announced the $1 billion project in March 2024, with Evergy powering the site and a 400 MW solar PPA from the Beavertail Solar farm with Ranger Power and DESRI. Google, partly through the Alphabet vehicle Shalerock LLC, had assembled more than 315 acres in the Northland by late 2021 for a project called Project Shale. Google's site now describes two new data centers in Kansas City as in development, while a third-party listing reports the first building operational since 2025 within a four-phase plan of about 1.435 million sq ft.
Source record as of 2026-10-09 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 39.16800, -94.47880 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Approximate site reference; the exact facility position is unverified.
Projects (1)
Google Kansas City data center campus (Hunt Midwest Business Center)
Under construction last observed as of · Reported status
Location: Kansas City, Clay County, Missouri, US. Approximate point on NE Parvin Road east of Interstate 435, within the Hunt Midwest Business Center that sources name as the site; the business park covers about 2,500 acres, so the data center parcel within it is not pinpointed. KSHB 41; Startland News; KCTV5
Use: Ai unspecified, Cloud
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Investment | 1,000,000,000 USD | Announced · Campus | 2024-03-20 | Missouri Public Service Commission (EFIS); KSHB 41; Startland News; KCTV5 | |
| Investment | 600,000,000 USD | Reported · Phase · Project Shale phase 1 (2019 proposal on 78.9 acres) | 2021-12-21 | Potential investment cited for the original 2019 proposal, before the 2024 announcement. | The Tech Capital |
| Land area | more than 315 acres | Acquired · Campus | 2021-12-21 | The Tech Capital; Baxtel | |
| Floor area | about 1,435,000 sq_ft | Planned · Campus | 2026 | Four-phase plan as described by a third-party data center listing; not confirmed by Google in an opened source. | Baxtel |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| Developer | Missouri Public Service Commission (EFIS); KSHB 41; Startland News | ||
| Shalerock LLC | Owner | Alphabet vehicle reported as buying the original 78.9 acres in 2019; the same report attributes a further 236.4-acre purchase in December 2021 to Google. | The Tech Capital |
| Evergy | Utility | Missouri Public Service Commission (EFIS); Startland News; KCTV5 | |
| Ranger Power | Power supplier | Counterparty with DESRI to a PPA for 400 MW of new solar capacity from Beavertail Solar in Missouri; supply is grid-delivered, not on site. | Missouri Public Service Commission (EFIS); KSHB 41 |
| D. E. Shaw Renewable Investments | Power supplier | Counterparty with Ranger Power to the Beavertail Solar PPA. | Missouri Public Service Commission (EFIS); KSHB 41 |
| Port KC | Government | In 2019 the Port Authority of Kansas City authorized up to $25 billion of privately backed Chapter 68 bonds over 35 years with a property tax exemption for the project; officials said that ceiling did not reflect planned spending. | The Tech Capital |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2021-12 | Site acquired | Actual | Purchase of 236.4 acres reported, adding to 78.9 acres bought in 2019. | The Tech Capital |
| 2024-03-20 | Announced | Actual | Missouri Public Service Commission (EFIS); KSHB 41; Startland News; KCTV5 | |
| 2025 | First operational | Actual | Third-party listing gives 2025 as the year built and marks the first building operational, but its own description still says the campus is being developed; Google's page labels the Kansas City campus as in development. Unconfirmed. | Baxtel |
Power supply
| Type | Description | Sources |
|---|---|---|
| Grid | Evergy powers the site. | Missouri Public Service Commission (EFIS); Startland News |
| Solar | PPA for 400 MW of new-to-the-grid solar capacity from the Beavertail Solar farm in Missouri, with Ranger Power and DESRI. | Missouri Public Service Commission (EFIS); KSHB 41 |
Status follows Google's undated page, which labels Kansas City as in development with two new data centers being built, and an undated third-party listing that reports a building completed in 2025; status_as_of is the access date because neither page carries a publication date. The listing's claim that the first building is operational is not confirmed by Google, so the record is not marked partially operational. Google's March 2024 announcement tied the site to its AI and cloud business.
Sources for these details
- Google announces $1 billion data center in Kansas City (exhibit ADS-D-4, Missouri PSC EFIS document 881306) — Missouri Public Service Commission (EFIS); 2024-03-20
- Google announces $1B data center in Kansas City's Northland — KSHB 41; publication date not stated
- Google to build $1B data center in Kansas City; aiming for 24/7 carbon-free energy use — Startland News; 2024-03-20
- Google to build $1 billion data center in Kansas City — KCTV5; 2024-03-20 · Archived source
- Google eyes 315-acre hyperscale data center in Kansas — The Tech Capital; 2021-12-21 · Archived source
- Kansas City, Missouri - Google Data Center Location — Google; publication date not stated
- Google: Shale 1 Data Center — Baxtel; publication date not stated
- Companies
- Developer: Google (unknown scope) evidence
- Developer: Google (unknown scope) evidence
- Developer: Google (unknown scope) evidence
- Owner: Shalerock LLC (unknown scope) evidence
- Utility: Evergy (unknown scope) evidence
- Utility: Evergy (unknown scope) evidence
- Utility: Evergy (unknown scope) evidence
- Power Supplier: Ranger Power (unknown scope) evidence
- Power Supplier: Ranger Power (unknown scope) evidence
- Power Supplier: D. E. Shaw Renewable Investments (unknown scope) evidence
- Power Supplier: D. E. Shaw Renewable Investments (unknown scope) evidence
- Government: Port KC (unknown scope) evidence
Source and location review
- Status source
- Kansas City, Missouri - Google Data Center Location evidence row
Google · publication date not stated · Company disclosure - Locator
- Approximate site reference · Compiled location reference · approximate_site evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 18 days before the data update on 2026-10-27
Location details
- Coordinates
- 39.16800, -94.47880
- Geometry licence
- source-terms-not-recorded
- Use scope
- Approximate site reference
- Scope class
- approximate_site
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- Approximate point on NE Parvin Road east of Interstate 435, within the Hunt Midwest Business Center that sources name as the site; the business park covers about 2,500 acres, so the data center parcel within it is not pinpointed.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- aea3d2fe
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Google announces $1 billion data center in Kansas City (exhibit ADS-D-4, Missouri PSC EFIS document 881306) Archived copy | Missouri Public Service Commission (EFIS) Regulatory filing | Imported: Record, Metric: Investment, Milestone: Announced, Power Source: Grid, Power Source: Solar, Role: Developer, Role: Power Supplier, Role: Utility | source-terms-not-recorded | Missouri Public Service Commission (EFIS) | 5cf6d879e4c59e78440ab0394bcccdfdacf03529d235e79c324293eba97b804cFactual source record; not the publisher page | ||
| Google announces $1B data center in Kansas City's Northland Archived copy | KSHB 41 News | Imported: Geometry, Imported: Record, Metric: Investment, Milestone: Announced, Power Source: Solar, Role: Developer, Role: Power Supplier | not stated | source-terms-not-recorded | KSHB 41 | 36fcedcd44f9a57984ecc92e64f7f03ec82affa6c4be614d369bf39ef8226817Factual source record; not the publisher page | |
| Google eyes 315-acre hyperscale data center in Kansas Archived copy | The Tech Capital Trade publication | Imported: Record, Metric: Investment, Metric: Land Area, Milestone: Site Acquired, Role: Government, Owner claim | source-terms-not-recorded | The Tech Capital | a05881279ce214205ebbcf5fc5be09ddea73702550d6984a5f0ce20eaba36134Factual source record; not the publisher page | ||
| Google to build $1 billion data center in Kansas City Archived copy | KCTV5 News | Imported: Geometry, Imported: Record, Metric: Investment, Milestone: Announced, Role: Utility | source-terms-not-recorded | KCTV5 | 7d964b3895a3aeddbd1ab2b1edd1fd69bf514714744d5ac6789921cc48831ddfFactual source record; not the publisher page | ||
| Google to build $1B data center in Kansas City; aiming for 24/7 carbon-free energy use Archived copy | Startland News News | Imported: Geometry, Imported: Record, Metric: Investment, Milestone: Announced, Power Source: Grid, Role: Developer, Role: Utility | source-terms-not-recorded | Startland News | 506575b5b560d01d4b94e9f68ee9730cfc9173a6bf592f60ea9d857290a70667Factual source record; not the publisher page | ||
| Google: Shale 1 Data Center Archived copy | Baxtel Other | Imported: Record, Imported: Status, Metric: Floor Area, Metric: Land Area, Milestone: First Operational | not stated | source-terms-not-recorded | Baxtel | bab0c7865edb3cb003a6782ac018eae5a4bd911294025d29e01b1bb5381ec184Factual source record; not the publisher page | |
| Kansas City, Missouri - Google Data Center Location Archived copy | Google Company disclosure | Imported: Record, Imported: Status | not stated | source-terms-not-recorded | c7ce8777aba589376b56ef21198ad7669a79a030adc5c5871d79ed507049f5a6Factual source record; not the publisher page |