Applied Digital's fourth AI factory campus, in Center, Oliver County, North Dakota. In May 2026 the company announced a 15-year take-or-pay lease with an unnamed US high investment-grade hyperscaler for 300 MW of critical IT load, supported by about 430 MW of grid-connected utility power, worth about 7.5 billion US dollars over the base term. The May release withheld the state; the company's October 2026 earnings release names Center, North Dakota. The campus is under construction, with initial operations targeted for 2027.
Source record as of 2026-10-07 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 47.11500, -101.29780 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Town or locality reference only; the facility position is not established.
Projects (1)
Applied Digital Polaris Forge 3
Under construction last observed as of · Reported status
Location: Center, Oliver County, North Dakota, US. Town centroid of Center from its Wikipedia coordinates (s4). The October 2026 earnings release (s3) names Center, Oliver County; no parcel or address has been found. Applied Digital; U.S. Securities and Exchange Commission (Applied Digital filing); Wikipedia
Use: Ai unspecified, Hpc
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | 300 MW | Contracted · Campus · It load | 2026-05-20 | Critical IT load leased to an unnamed US high investment-grade hyperscaler for 15 years, about 7.5 billion US dollars of base-term contracted revenue. | Applied Digital; Applied Digital |
| Power capacity | about 430 MW | Planned · Campus · Grid connection | 2026-05-20 | Grid-connected utility power supporting the campus. | Applied Digital |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| Applied Digital | Developer | Applied Digital; U.S. Securities and Exchange Commission (Applied Digital filing) |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2026-05-20 | Announced | Actual | Lease announcement; the location was described only as a northern state. | Applied Digital |
| 2027-08 | First operational | Planned | May 2026 target; the July 2026 results release says initial operations are expected during calendar 2027. | Applied Digital; Applied Digital |
Power supply
| Type | Description | Sources |
|---|---|---|
| Grid | About 430 MW of grid-connected utility power; the utility is not named in the cited sources. | Applied Digital |
Related projects: applied digital polaris forge 1, applied digital polaris forge 2
Sources for these details
- Applied Digital Reaches Significant Milestone, Surpassing 1 GW of Contracted Capacity with U.S. Based High Investment-Grade Hyperscaler Lease at Fourth Campus, Polaris Forge 3 — Applied Digital; 2026-05-20 · Archived source
- Applied Digital Reports Fiscal Fourth Quarter and Full Year 2026 Results — Applied Digital; 2026-07-27
- Applied Digital Reports Fiscal First Quarter 2027 Results (Form 8-K exhibit) — U.S. Securities and Exchange Commission (Applied Digital filing); 2026-10-07
- Center, North Dakota — Wikipedia; publication date not stated
- Companies
Source and location review
- Status source
- Applied Digital Reports Fiscal Fourth Quarter and Full Year 2026 Results evidence row
Applied Digital · published 2026-07-27 · Company disclosure - Locator
- Locality reference only · Compiled location reference · locality evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 20 days before the data update on 2026-10-27
Location details
- Coordinates
- 47.11500, -101.29780
- Geometry licence
- source-terms-not-recorded
- Use scope
- Locality reference only
- Scope class
- locality
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- Town centroid of Center from its Wikipedia coordinates (s4). The October 2026 earnings release (s3) names Center, Oliver County; no parcel or address has been found.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- bf899518
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Applied Digital Reaches Significant Milestone, Surpassing 1 GW of Contracted Capacity with U.S. Based High Investment-Grade Hyperscaler Lease at Fourth Campus, Polaris Forge 3 Archived copy | Applied Digital Company disclosure | Imported: Record, Metric: Power Capacity, Milestone: Announced, Milestone: First Operational, Power Source: Grid, Role: Developer | source-terms-not-recorded | Applied Digital | 9877d156ca494f6fae7059125afa0c1b734b897032777efc189f76b0e000907bFactual source record; not the publisher page | ||
| Applied Digital Reports Fiscal First Quarter 2027 Results (Form 8-K exhibit) Archived copy | U.S. Securities and Exchange Commission (Applied Digital filing) Regulatory filing | Imported: Geometry, Imported: Record, Imported: Status, Role: Developer | source-terms-not-recorded | U.S. Securities and Exchange Commission (Applied Digital filing) | 296151fba2a5f1cdbb397414c19e5ad22e64bd1b0267932bea5fcec7b00d19dfFactual source record; not the publisher page | ||
| Applied Digital Reports Fiscal Fourth Quarter and Full Year 2026 Results Archived copy | Applied Digital Company disclosure | Imported: Geometry, Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: First Operational | source-terms-not-recorded | Applied Digital | 06427d554c78aab1bd09ed8bdf6c677a541d5b427a63d2058252b7e65f1e6a67Factual source record; not the publisher page | ||
| Center, North Dakota Archived copy | Wikipedia Other | Imported: Geometry, Imported: Record | not stated | source-terms-not-recorded | Wikipedia | 468ebe615643bd1f40b9ca035548576dbc936b0c3e7de5ced281e9f4081610e4Factual source record; not the publisher page |
Cite this site
Kyars, K. (2026). Applied Digital Polaris Forge 3 [site vcc-site-5af95dd1d26b0546ea7f]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5af95dd1d26b0546ea7f/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction