Meta Montgomery data center
Under construction
United States · 1 project · Last reported
Summary
Meta data center campus in Montgomery, Alabama. Announced in May 2024 as a 715,000-square-foot campus worth more than USD 800 million, it was expanded in September 2025 with two more buildings, bringing the campus to nearly 1.3 million square feet and the investment to more than USD 1.5 billion; Meta says it will be optimized for AI workloads. Meta's location list gives 2024 as the groundbreaking year. Meta names Alabama Power as its energy-planning partner and refers readers to Hensel Phelps for construction information. Meta's undated fact sheet gives job estimates well above those in its earlier posts.
Source record as of 2026-10-09 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 32.37770, -86.30910 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Town or locality reference only; the facility position is not established.
Projects (1)
Meta Montgomery data center
Under construction last observed as of · Reported status
Location: Montgomery, Alabama, US. City point from OpenStreetMap Nominatim; Meta gives no site address. Meta Platforms; Meta Platforms
Use: Ai unspecified
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Investment | more than 800,000,000 USD | Announced · Campus | 2024-05-02 | Meta Platforms | |
| Investment | more than 1,500,000,000 USD | Announced · Campus | 2025-09-23 | Meta Platforms; Meta Platforms; Meta Platforms | |
| Floor area | 715,000 sq_ft | Planned · Phase · Original campus | 2024-05-02 | Meta Platforms | |
| Floor area | about 1,300,000 sq_ft | Planned · Campus | 2025-09-23 | Described as nearly 1.3 million square feet after the expansion. | Meta Platforms |
| Jobs construction | more than 1,000 count | Planned · Campus | 2025-09-23 | Meta Platforms; Meta Platforms; Meta Platforms | |
| Jobs construction | 4,000 count | Planned · Campus | 2026-10-09 | From Meta's undated fact sheet, read 2026-10-09; conflicts with the more than 1,000 given in Meta's posts and location list. | Meta Platforms |
| Jobs permanent | more than 100 count | Planned · Campus | 2025-09-23 | Meta Platforms; Meta Platforms | |
| Jobs permanent | 300 count | Planned · Campus | 2026-10-09 | From Meta's undated fact sheet, read 2026-10-09; conflicts with the more than 100 given in Meta's 2025 post and location list. | Meta Platforms |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| Meta Platforms | Developer | Meta Platforms; Meta Platforms | |
| Hensel Phelps | Builder | Meta refers readers to Hensel Phelps for construction information. | Meta Platforms |
| Alabama Power | Utility | Named in Meta's fact sheet as its energy-planning partner. | Meta Platforms |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2024-05-02 | Announced | Actual | Meta Platforms | |
| 2024 | Construction started | Actual | Meta's location list gives 2024 as the groundbreaking year. | Meta Platforms |
| 2025-09-23 | Expansion announced | Actual | Two additional buildings, nearly doubling the investment. | Meta Platforms |
Power supply
| Type | Description | Sources |
|---|---|---|
| Grid | Meta says it planned its energy needs with Alabama Power, pays the full cost of the energy used and matches its use with clean and renewable energy; its 2025 post cites Meta-supported clean energy projects adding 227 MW in Alabama. | Meta Platforms; Meta Platforms |
The status rests on two undated Meta pages: the U.S. location list, which gives 2024 as the groundbreaking year, and the fact sheet, which describes the data center in the future tense. status_as_of is therefore the date both were read (2026-10-09). The fact sheet PDF shows no publication date; its embedded file creation date is 2026-09-02.
Sources for these details
- Hello, Montgomery! — Meta Platforms; 2024-05-02 · Archived source
- Montgomery, we're growing! — Meta Platforms; 2025-09-23
- Meta Montgomery Data Center fact sheet — Meta Platforms; publication date not stated
- United States - Meta Data Centers — Meta Platforms; publication date not stated · Archived source
- Companies
Source and location review
- Status source
- Meta Montgomery Data Center fact sheet evidence row
Meta Platforms · publication date not stated · Company disclosure - Locator
- Locality reference only · Compiled location reference · locality evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 18 days before the data update on 2026-10-27
Location details
- Coordinates
- 32.37770, -86.30910
- Geometry licence
- source-terms-not-recorded
- Use scope
- Locality reference only
- Scope class
- locality
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- City point from OpenStreetMap Nominatim; Meta gives no site address.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- 26e820ae
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Hello, Montgomery! Archived copy | Meta Platforms Company disclosure | Imported: Geometry, Imported: Record, Metric: Floor Area, Metric: Investment, Metric: Jobs Construction, Milestone: Announced, Role: Builder, Role: Developer | source-terms-not-recorded | Meta Platforms | 62a171c03b4d75226937b310d4fe665fd9e33d7d476a86a8d1775234f612b9bcFactual source record; not the publisher page | ||
| Meta Montgomery Data Center fact sheet Archived copy | Meta Platforms Company disclosure | Imported: Record, Imported: Status, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Power Source: Grid, Role: Utility | not stated | source-terms-not-recorded | Meta Platforms | 70daaafd53eea3dcfd17c535e2f35247af78eadc9dcdaeaaa6c3e0294518fcadFactual source record; not the publisher page | |
| Montgomery, we're growing! Archived copy | Meta Platforms Company disclosure | Imported: Geometry, Imported: Record, Metric: Floor Area, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Milestone: Expansion Announced, Power Source: Grid, Role: Developer | source-terms-not-recorded | Meta Platforms | 99a02d58b77cdeea1fbeb70e6542c1ebc954bb021232917c23310d686db79fd9Factual source record; not the publisher page | ||
| United States - Meta Data Centers Archived copy | Meta Platforms Company disclosure | Imported: Record, Imported: Status, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Milestone: Construction Started | not stated | source-terms-not-recorded | Meta Platforms | 539e1741c9222cd37ad6082a5eab049381cd1013a6fff00438497e3051ce24acFactual source record; not the publisher page |
Cite this site
Kyars, K. (2026). Meta Montgomery data center [site vcc-site-4905a5572ec5f3fc6e2d]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4905a5572ec5f3fc6e2d/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction