Galaxy Helios Data Center Campus

Foundations Partially operational

United States · 2 projects · Last reported

Summary

Galaxy Helios data center campus

Mining campus in Dickens County, in the West Texas panhandle, that Galaxy acquired in 2022 and is converting into AI and HPC data centers. CoreWeave has leased the first 800 MW of gross power in three phases totaling 526 MW of critical IT load, starting with a 15-year lease signed in April 2025. Galaxy delivered the first 133 MW of critical IT load to CoreWeave in 2026, and the eight Phase II data halls are expected online from the second quarter of 2027 into early 2028. ERCOT approved another 830 MW in January 2026, taking approved capacity above 1.6 GW, and Galaxy plans to develop that capacity on a build-to-suit basis.

Source record as of 2026-08-12 · Details and sources

Galaxy Helios Phase II 260 MW Critical IT Build

Galaxy reported on 12 August 2026 that Helios Phase II earthwork is complete and foundation work is under way under new general contractor HITT. The project is placed at the foundations stage. Galaxy expects the first of eight Phase II data halls online in Q2 2027; that is a forecast, and no structure, energization or operation of Phase II is established. evidence

Galaxy Digital · published 2026-08-12

Location

The interactive map needs JavaScript. Display anchor: 33.78064, -100.86710 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (2)

Galaxy Helios data center campus

Partially operational last observed as of · Reported status

Location: Dickens County, Texas, US. County coordinates from Wikipedia; Galaxy names Dickens County but gives no street address. Galaxy; Galaxy; Wikipedia

Use: Ai unspecified, Hpc

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacitymore than 1,600 MWPermitted · Campus · Grid connection2026-01Gross power capacity approved by ERCOT, combining the original 800 MW and 830 MW approved in January 2026.U.S. Securities and Exchange Commission (Galaxy Digital filing); Galaxy
Power capacity800 MWContracted · Phase · Facility · CoreWeave Phases I-III2026-04-08Gross power leased to CoreWeave, stated by Galaxy as the first 800 MW; the 10-K gives about 200 MW for the initial lease and 600 MW for the Phase II and III leases.U.S. Securities and Exchange Commission (Galaxy Digital filing); Galaxy
Power capacity526 MWContracted · Phase · It load · CoreWeave Phases I-III2026-01U.S. Securities and Exchange Commission (Galaxy Digital filing)
Power capacity133 MWOperational · Phase · It load · Phase I2026-08-12Galaxy
Power capacity260 MWUnder construction · Phase · It load · Phase II2026-08-12Earthwork complete and foundation work under way in August 2026. Galaxy's update does not report construction status for Phase III.U.S. Securities and Exchange Commission (Galaxy Digital filing); Galaxy
Power capacity830 MWPermitted · Phase · Grid connection · Expansion approved January 20262026-01Not yet leased; Galaxy had committed more than $180 million to long-lead equipment by August 2026.U.S. Securities and Exchange Commission (Galaxy Digital filing); Galaxy
Investmentmore than 7,500,000,000 USDAnnounced · Phase · CoreWeave Phases I-III2026-04-08Capital investment Galaxy associates with the first 800 MW leased to CoreWeave.Galaxy
Investmentmore than 15,000,000,000 USDReported · Campus2026-04-08Galaxy CEO's estimate of long-term digital infrastructure investment at Helios.Galaxy

Companies and organizations

NameRoleNotesSources
Galaxy DigitalDeveloperU.S. Securities and Exchange Commission (Galaxy Digital filing); Galaxy
Galaxy DigitalOwnerGalaxy says it acquired Helios in 2022.Galaxy
CoreWeaveTenantLeases for the initial 133 MW of critical IT (15 years, April 2025), Phase II (260 MW, August 2025) and Phase III (133 MW, January 2026).U.S. Securities and Exchange Commission (Galaxy Digital filing); Galaxy; Galaxy
HITTBuilderNamed by Galaxy as the new general contractor for Phase II in August 2026.Galaxy

Timeline

DateEventActual or plannedNotesSources
2022Site acquiredActualGalaxy
2025-04OtherActual15-year CoreWeave lease for the first 133 MW of critical IT load.U.S. Securities and Exchange Commission (Galaxy Digital filing)
2025-08Expansion announcedActualCoreWeave Phase II lease for 260 MW of additional critical IT.U.S. Securities and Exchange Commission (Galaxy Digital filing)
2026-01Expansion announcedActualCoreWeave Phase III lease for 133 MW of additional critical IT; ERCOT approved 830 MW more.U.S. Securities and Exchange Commission (Galaxy Digital filing)
2026First operationalActualGalaxy's Q2 2026 update reported the first 133 MW of critical IT load delivered to CoreWeave and in service.Galaxy
2027-Q2OtherPlannedFirst of eight Phase II data halls expected online; seven by year-end and the last in early 2028.Galaxy

Power supply

TypeDescriptionSources
GridERCOT has approved more than 1.6 GW of gross capacity for the campus; six main power transformers are installed at the project substation.U.S. Securities and Exchange Commission (Galaxy Digital filing); Galaxy
Sources for these details
Companies
  • Developer: Galaxy Digital (unknown scope) evidence
  • Developer: Galaxy Digital (unknown scope) evidence
  • Owner: Galaxy Digital (unknown scope) evidence
  • Tenant: CoreWeave (unknown scope) evidence
  • Tenant: CoreWeave (unknown scope) evidence
  • Tenant: CoreWeave (unknown scope) evidence
  • Builder: HITT (unknown scope) evidence
Source and location review
Status source
Galaxy Q2 2026 Unwrapped: The Code Economy Delivers evidence row
Galaxy · published 2026-08-12 · Company disclosure
Locator
County or district reference only · Compiled location reference · admin2 evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 76 days before the data update on 2026-10-27

Galaxy Helios Phase II 260 MW Critical IT Build

Foundations last observed as of · Authoritative status update

Source and location review
Status source
Galaxy Q2 2026 Unwrapped: The Code Economy Delivers evidence row
Galaxy Digital · published 2026-08-12 · Company disclosure
Locator
Campus locator · Official source · official_address_range_interpolation_constituent_campus_locator evidence
Source checks

Not reviewed against imagery not_reviewed_for_core_preview
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 76 days before the data update on 2026-10-27

Location details
Coordinates
33.78064, -100.86710
Geometry licence
no-open-redistribution-license-asserted
Use scope
Campus locator
Scope class
official_address_range_interpolation_constituent_campus_locator
Authority
Official source
Source entity
Campus
Method
census_single_exact_address_match_then_explicit_nad83_to_wgs84
Derivation
official_address_range_geocode
Precision scope
Government geocoder street-range interpolation for the TCEQ-registered Helios I address. Used for the physical campus only; Phase II's separate 1003 FM 193 address is unresolved in Census. No Phase II footprint, parcel boundary or surveyed accuracy is asserted.
Horizontal uncertainty
Not reported

No source provides a numeric horizontal-accuracy guarantee or a surveyed campus reference feature.

Geometry evidence
50b56d5c 69ecb4cd

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Galaxy Helios Data Center Campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
A Letter from the Founder & CEO (GLXY 2025 Annual Report)
Archived copy
Galaxy
Company disclosure
Imported: Record, Metric: Investment, Metric: Power Capacity, Milestone: Site Acquired, Power Source: Grid, Role: Developer, Owner claim, Tenant claimsource-terms-not-recordedGalaxyfbfc65876661a62feabc7f7a84db8e182a2b2a8491adcabff9d4b58b2a13941f
Factual source record; not the publisher page
Census exact-address match for 984 County Road 112, Afton - explicit NAD83 provenance correction
Archived copy
United States Census Bureau
Government record
Site distinctness context, Geometrynot statedno-open-redistribution-license-assertedUnited States Census Bureau5a774f282621730362b35870e22058b5f628c82c737137fc8bc13c030e5ecf1e
Retained source material; see source provenance
Census Geocoder FAQ - source NAD83 datum and address-range interpolation
Archived copy
U.S. Census Bureau
Government record
Site distinctness context, Geometrynot statedno-open-redistribution-license-assertedU.S. Census Bureau13a8ca9f7395daf53e0c06344dd2f1ed28bc6806ab0625b3410eba7e280db169
Retained source material; see source provenance
Central Registry RN111537775, Galaxy Helios I
Archived copy
Texas Commission on Environmental Quality
Government record
Geometry identity context, Site distinctness contextnot statedno-open-redistribution-license-assertedTexas Commission on Environmental Quality70dfa09ebe1640a609e8dfac2f930a5be47a125bce0a1eeafb45a68ae1dc7aad
Retained source material; see source provenance
Dickens County, Texas
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia1a4ccb9fda077d44e357e79a22330f80deba05d5c592f59295603597fbfd790b
Factual source record; not the publisher page
Galaxy Announces On-Campus Emergency Services Partnership with Total Safety at Helios Data Center Campus
Archived copy
Galaxy
Company disclosure
Imported: Geometry, Imported: Recordsource-terms-not-recordedGalaxy959f4674dc2dbe9c872a56de91337523ceca42c195e0867569daad4bd0527ab2
Factual source record; not the publisher page
Galaxy Completes Phase I of Its Helios Data Center Campus, Delivering 133 Megawatts of Critical IT Load to CoreWeave
Archived copy
Galaxy Digital Inc.
Company disclosure
Physical statusall-rights-reservedGalaxy Digital Inc.f46a95f8d5f6a9980416fe971dccfb1e6af0eaedd82b1159e7bd69d59d127805
Retained source material; see source provenance
Galaxy Digital Inc. Form 10-K for the fiscal year ended December 31, 2025
Archived copy
U.S. Securities and Exchange Commission (Galaxy Digital filing)
Regulatory filing
Imported: Record, Metric: Power Capacity, Milestone: Expansion Announced, Milestone: Other, Power Source: Grid, Role: Developer, Tenant claimsource-terms-not-recordedU.S. Securities and Exchange Commission (Galaxy Digital filing)91a1b7506009ac8ed6d80b3b061e0b27b925ee71d1702c1f76b20da17b40259f
Factual source record; not the publisher page
Galaxy Q2 2026 Unwrapped: The Code Economy Delivers
Archived copy
Galaxy Digital
Company disclosure
Physical statusall-rights-reservedGalaxy Digital Inc.f88cdea2ab05b57dc0ecc1f5903d9497323ac66436605cc555218d856744f9c0
Retained source material; see source provenance
Galaxy Q2 2026 Unwrapped: The Code Economy Delivers
Archived copy
Galaxy
Company disclosure
Imported: Geometry, Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: First Operational, Milestone: Other, Role: Builder, Tenant claimsource-terms-not-recordedGalaxyf9de7ebf9854ec19d5f8d7e4586548f1dbf1cd89e8c053319cf2157e5660d643
Factual source record; not the publisher page
TABS2026014893, Galaxy Helios Phase 2, Helios 3
Archived copy
Texas Department of Licensing and Regulation
Government record
Geometry identity context, Site distinctness contextnot statedno-open-redistribution-license-assertedTexas Department of Licensing and Regulation982c7c49cda6ed36752fe931f337cc35892211ded9a8b2db1db71fd9557b20de
Retained source material; see source provenance
Cite this site

Kyars, K. (2026). Galaxy Helios Data Center Campus [site vcc-site-43bf6c7b8c9e9dfc51d0]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-43bf6c7b8c9e9dfc51d0/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction