Galaxy Helios Data Center Campus
Foundations Partially operational
United States · 2 projects · Last reported
Summary
Galaxy Helios data center campus
Mining campus in Dickens County, in the West Texas panhandle, that Galaxy acquired in 2022 and is converting into AI and HPC data centers. CoreWeave has leased the first 800 MW of gross power in three phases totaling 526 MW of critical IT load, starting with a 15-year lease signed in April 2025. Galaxy delivered the first 133 MW of critical IT load to CoreWeave in 2026, and the eight Phase II data halls are expected online from the second quarter of 2027 into early 2028. ERCOT approved another 830 MW in January 2026, taking approved capacity above 1.6 GW, and Galaxy plans to develop that capacity on a build-to-suit basis.
Source record as of 2026-08-12 · Details and sources
Galaxy Helios Phase II 260 MW Critical IT Build
Galaxy reported on 12 August 2026 that Helios Phase II earthwork is complete and foundation work is under way under new general contractor HITT. The project is placed at the foundations stage. Galaxy expects the first of eight Phase II data halls online in Q2 2027; that is a forecast, and no structure, energization or operation of Phase II is established. evidence
Galaxy Digital · published 2026-08-12
Location
The interactive map needs JavaScript. Display anchor: 33.78064, -100.86710 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Campus reference; individual project footprints are not mapped.
Projects (2)
Galaxy Helios data center campus
Partially operational last observed as of · Reported status
Location: Dickens County, Texas, US. County coordinates from Wikipedia; Galaxy names Dickens County but gives no street address. Galaxy; Galaxy; Wikipedia
Use: Ai unspecified, Hpc
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | more than 1,600 MW | Permitted · Campus · Grid connection | 2026-01 | Gross power capacity approved by ERCOT, combining the original 800 MW and 830 MW approved in January 2026. | U.S. Securities and Exchange Commission (Galaxy Digital filing); Galaxy |
| Power capacity | 800 MW | Contracted · Phase · Facility · CoreWeave Phases I-III | 2026-04-08 | Gross power leased to CoreWeave, stated by Galaxy as the first 800 MW; the 10-K gives about 200 MW for the initial lease and 600 MW for the Phase II and III leases. | U.S. Securities and Exchange Commission (Galaxy Digital filing); Galaxy |
| Power capacity | 526 MW | Contracted · Phase · It load · CoreWeave Phases I-III | 2026-01 | U.S. Securities and Exchange Commission (Galaxy Digital filing) | |
| Power capacity | 133 MW | Operational · Phase · It load · Phase I | 2026-08-12 | Galaxy | |
| Power capacity | 260 MW | Under construction · Phase · It load · Phase II | 2026-08-12 | Earthwork complete and foundation work under way in August 2026. Galaxy's update does not report construction status for Phase III. | U.S. Securities and Exchange Commission (Galaxy Digital filing); Galaxy |
| Power capacity | 830 MW | Permitted · Phase · Grid connection · Expansion approved January 2026 | 2026-01 | Not yet leased; Galaxy had committed more than $180 million to long-lead equipment by August 2026. | U.S. Securities and Exchange Commission (Galaxy Digital filing); Galaxy |
| Investment | more than 7,500,000,000 USD | Announced · Phase · CoreWeave Phases I-III | 2026-04-08 | Capital investment Galaxy associates with the first 800 MW leased to CoreWeave. | Galaxy |
| Investment | more than 15,000,000,000 USD | Reported · Campus | 2026-04-08 | Galaxy CEO's estimate of long-term digital infrastructure investment at Helios. | Galaxy |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| Galaxy Digital | Developer | U.S. Securities and Exchange Commission (Galaxy Digital filing); Galaxy | |
| Galaxy Digital | Owner | Galaxy says it acquired Helios in 2022. | Galaxy |
| CoreWeave | Tenant | Leases for the initial 133 MW of critical IT (15 years, April 2025), Phase II (260 MW, August 2025) and Phase III (133 MW, January 2026). | U.S. Securities and Exchange Commission (Galaxy Digital filing); Galaxy; Galaxy |
| HITT | Builder | Named by Galaxy as the new general contractor for Phase II in August 2026. | Galaxy |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2022 | Site acquired | Actual | Galaxy | |
| 2025-04 | Other | Actual | 15-year CoreWeave lease for the first 133 MW of critical IT load. | U.S. Securities and Exchange Commission (Galaxy Digital filing) |
| 2025-08 | Expansion announced | Actual | CoreWeave Phase II lease for 260 MW of additional critical IT. | U.S. Securities and Exchange Commission (Galaxy Digital filing) |
| 2026-01 | Expansion announced | Actual | CoreWeave Phase III lease for 133 MW of additional critical IT; ERCOT approved 830 MW more. | U.S. Securities and Exchange Commission (Galaxy Digital filing) |
| 2026 | First operational | Actual | Galaxy's Q2 2026 update reported the first 133 MW of critical IT load delivered to CoreWeave and in service. | Galaxy |
| 2027-Q2 | Other | Planned | First of eight Phase II data halls expected online; seven by year-end and the last in early 2028. | Galaxy |
Power supply
| Type | Description | Sources |
|---|---|---|
| Grid | ERCOT has approved more than 1.6 GW of gross capacity for the campus; six main power transformers are installed at the project substation. | U.S. Securities and Exchange Commission (Galaxy Digital filing); Galaxy |
Sources for these details
- Galaxy Digital Inc. Form 10-K for the fiscal year ended December 31, 2025 — U.S. Securities and Exchange Commission (Galaxy Digital filing); 2026-02-26 · Archived source
- A Letter from the Founder & CEO (GLXY 2025 Annual Report) — Galaxy; 2026-04-08
- Galaxy Q2 2026 Unwrapped: The Code Economy Delivers — Galaxy; 2026-08-12
- Galaxy Announces On-Campus Emergency Services Partnership with Total Safety at Helios Data Center Campus — Galaxy; 2026-08-27
- Dickens County, Texas — Wikipedia; publication date not stated · Archived source
- Companies
- Developer: Galaxy Digital (unknown scope) evidence
- Developer: Galaxy Digital (unknown scope) evidence
- Owner: Galaxy Digital (unknown scope) evidence
- Tenant: CoreWeave (unknown scope) evidence
- Tenant: CoreWeave (unknown scope) evidence
- Tenant: CoreWeave (unknown scope) evidence
- Builder: HITT (unknown scope) evidence
Source and location review
- Status source
- Galaxy Q2 2026 Unwrapped: The Code Economy Delivers evidence row
Galaxy · published 2026-08-12 · Company disclosure - Locator
- County or district reference only · Compiled location reference · admin2 evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 76 days before the data update on 2026-10-27
Galaxy Helios Phase II 260 MW Critical IT Build
Foundations last observed as of · Authoritative status update
Source and location review
- Status source
- Galaxy Q2 2026 Unwrapped: The Code Economy Delivers evidence row
Galaxy Digital · published 2026-08-12 · Company disclosure - Locator
- Campus locator · Official source · official_address_range_interpolation_constituent_campus_locator evidence
- Source checks
Not reviewed against imagery not_
reviewed_ for_ core_ preview
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 76 days before the data update on 2026-10-27
Location details
- Coordinates
- 33.78064, -100.86710
- Geometry licence
- no-open-redistribution-license-asserted
- Use scope
- Campus locator
- Scope class
- official_address_range_interpolation_constituent_campus_locator
- Authority
- Official source
- Source entity
- Campus
- Method
- census_single_exact_address_match_then_explicit_nad83_to_wgs84
- Derivation
- official_address_range_geocode
- Precision scope
- Government geocoder street-range interpolation for the TCEQ-registered Helios I address. Used for the physical campus only; Phase II's separate 1003 FM 193 address is unresolved in Census. No Phase II footprint, parcel boundary or surveyed accuracy is asserted.
- Horizontal uncertainty
Not reported
No source provides a numeric horizontal-accuracy guarantee or a surveyed campus reference feature.
- Geometry evidence
- 50b56d5c 69ecb4cd
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| A Letter from the Founder & CEO (GLXY 2025 Annual Report) Archived copy | Galaxy Company disclosure | Imported: Record, Metric: Investment, Metric: Power Capacity, Milestone: Site Acquired, Power Source: Grid, Role: Developer, Owner claim, Tenant claim | source-terms-not-recorded | Galaxy | fbfc65876661a62feabc7f7a84db8e182a2b2a8491adcabff9d4b58b2a13941fFactual source record; not the publisher page | ||
| Census exact-address match for 984 County Road 112, Afton - explicit NAD83 provenance correction Archived copy | United States Census Bureau Government record | Site distinctness context, Geometry | not stated | no-open-redistribution-license-asserted | United States Census Bureau | 5a774f282621730362b35870e22058b5f628c82c737137fc8bc13c030e5ecf1eRetained source material; see source provenance | |
| Census Geocoder FAQ - source NAD83 datum and address-range interpolation Archived copy | U.S. Census Bureau Government record | Site distinctness context, Geometry | not stated | no-open-redistribution-license-asserted | U.S. Census Bureau | 13a8ca9f7395daf53e0c06344dd2f1ed28bc6806ab0625b3410eba7e280db169Retained source material; see source provenance | |
| Central Registry RN111537775, Galaxy Helios I Archived copy | Texas Commission on Environmental Quality Government record | Geometry identity context, Site distinctness context | not stated | no-open-redistribution-license-asserted | Texas Commission on Environmental Quality | 70dfa09ebe1640a609e8dfac2f930a5be47a125bce0a1eeafb45a68ae1dc7aadRetained source material; see source provenance | |
| Dickens County, Texas Archived copy | Wikipedia Other | Imported: Geometry, Imported: Record | not stated | source-terms-not-recorded | Wikipedia | 1a4ccb9fda077d44e357e79a22330f80deba05d5c592f59295603597fbfd790bFactual source record; not the publisher page | |
| Galaxy Announces On-Campus Emergency Services Partnership with Total Safety at Helios Data Center Campus Archived copy | Galaxy Company disclosure | Imported: Geometry, Imported: Record | source-terms-not-recorded | Galaxy | 959f4674dc2dbe9c872a56de91337523ceca42c195e0867569daad4bd0527ab2Factual source record; not the publisher page | ||
| Galaxy Completes Phase I of Its Helios Data Center Campus, Delivering 133 Megawatts of Critical IT Load to CoreWeave Archived copy | Galaxy Digital Inc. Company disclosure | Physical status | all-rights-reserved | Galaxy Digital Inc. | f46a95f8d5f6a9980416fe971dccfb1e6af0eaedd82b1159e7bd69d59d127805Retained source material; see source provenance | ||
| Galaxy Digital Inc. Form 10-K for the fiscal year ended December 31, 2025 Archived copy | U.S. Securities and Exchange Commission (Galaxy Digital filing) Regulatory filing | Imported: Record, Metric: Power Capacity, Milestone: Expansion Announced, Milestone: Other, Power Source: Grid, Role: Developer, Tenant claim | source-terms-not-recorded | U.S. Securities and Exchange Commission (Galaxy Digital filing) | 91a1b7506009ac8ed6d80b3b061e0b27b925ee71d1702c1f76b20da17b40259fFactual source record; not the publisher page | ||
| Galaxy Q2 2026 Unwrapped: The Code Economy Delivers Archived copy | Galaxy Digital Company disclosure | Physical status | all-rights-reserved | Galaxy Digital Inc. | f88cdea2ab05b57dc0ecc1f5903d9497323ac66436605cc555218d856744f9c0Retained source material; see source provenance | ||
| Galaxy Q2 2026 Unwrapped: The Code Economy Delivers Archived copy | Galaxy Company disclosure | Imported: Geometry, Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: First Operational, Milestone: Other, Role: Builder, Tenant claim | source-terms-not-recorded | Galaxy | f9de7ebf9854ec19d5f8d7e4586548f1dbf1cd89e8c053319cf2157e5660d643Factual source record; not the publisher page | ||
| TABS2026014893, Galaxy Helios Phase 2, Helios 3 Archived copy | Texas Department of Licensing and Regulation Government record | Geometry identity context, Site distinctness context | not stated | no-open-redistribution-license-asserted | Texas Department of Licensing and Regulation | 982c7c49cda6ed36752fe931f337cc35892211ded9a8b2db1db71fd9557b20deRetained source material; see source provenance |