Bitdeer and Geis Shalersville AI data center campus

Proposed

United States · 1 project · Last reported

Summary

Proposed 15-building AI data center campus by Bitdeer Technologies Group and Geis Development at the Turnpike Commerce Center, just north of the Ohio Turnpike in Shalersville Township, Portage County, Ohio. Plans made public in May 2026 start with two data halls of about 48,000 sq ft each plus an office building and 150 MW of initial power capacity, with a potential 750 MW at full build-out over about five years; construction was put at more than USD 300 million, excluding computing equipment. A township moratorium is in place, and on 6 October 2026 trustees required uses of 25 MW or more to sit on heavy industrial land, which the township lacks; Geis's lawyers threatened to sue.

Source record as of 2026-10-07 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 41.24560, -81.26030 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Bitdeer and Geis Shalersville AI data center campus

Proposed last observed as of · Reported status

Location: Shalersville Township, Portage County, Ohio, US. Sources place the site at the Turnpike Commerce Center just north of the Ohio Turnpike in Shalersville Township, without coordinates. The point is the township coordinate from its Wikipedia article, not the site. News 5 Cleveland (WEWS); The Portager; The Portager; The Portager; Wikipedia

Use: Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacityup to 750 MWPlanned · Campus · Unspecified2026-10-07Potential capacity if the full campus is built; the sources do not say whether this is IT or facility load.News 5 Cleveland (WEWS); TheEnergyMag; The Portager
Power capacity150 MWPlanned · Phase · Unspecified · Initial capacity2026-05News 5 Cleveland (WEWS)
Investmentmore than 300,000,000 USDReported · Campus2026-05Construction cost excluding the company's computing equipment.News 5 Cleveland (WEWS)
Land areaabout 257 acresReported · Campus2026-08-14The October 2026 Portager report instead describes the campus as sitting on just over 150 acres of Geis-owned land.News 5 Cleveland (WEWS); TheEnergyMag; The Portager
Buildings15 countPlanned · Campus2026-08-14Phase 1 is two data halls plus a 51,500 sq ft office building; phase 2 adds 12 data halls.News 5 Cleveland (WEWS); TheEnergyMag; The Portager
Floor areaabout 48,000 sq_ftPlanned · Phase · Each phase 1 data hall2026-05News 5 Cleveland (WEWS); TheEnergyMag
Jobs constructionabout 400 countPlanned · Campus2026-06-17Local construction jobs over five years, as presented at the June 2026 public meeting.TheEnergyMag
Jobs permanent150–200 countPlanned · Campus2026-06-17At full build-out; phase 1 alone was put at 30 to 50 long-term jobs.News 5 Cleveland (WEWS); TheEnergyMag

Companies and organizations

NameRoleNotesSources
Bitdeer Technologies GroupDeveloperReported in May 2026 to be under contract to buy about 257 acres for the campus.News 5 Cleveland (WEWS); The Portager; TheEnergyMag; The Portager; The Portager
Geis DevelopmentDeveloperStreetsboro-based business park developer partnering with Bitdeer.News 5 Cleveland (WEWS); The Portager; TheEnergyMag; The Portager
Shalersville Holdings (Geis Companies)OwnerGeis affiliate described as owning the land in August 2026; the October 2026 report also calls it Geis-owned land.The Portager; The Portager
Shalersville TownshipGovernmentHas a data center moratorium in place and in October 2026 redefined its industrial zoning categories.News 5 Cleveland (WEWS); The Portager

Timeline

DateEventActual or plannedNotesSources
2026-05AnnouncedActualPlans became public in late May 2026, ahead of a township residents' open house that the article links to 29 May.News 5 Cleveland (WEWS)
2026-06-16OtherActualPublic meeting at Shalersville Town Hall drew about 200 people inside and dozens more outside.TheEnergyMag
2026-10-06OtherActualTrustees amended zoning definitions so that uses of 25 MW or more belong on heavy industrial land, which the township lacks; Geis's lawyer called the change unlawful and said the firm would sue unless it was tabled or rejected. The moratorium runs to the first week of November, and trustees said they would extend it if needed.The Portager

Power supply

TypeDescriptionSources
GridBitdeer said it would pay for the electricity it needs and for any transmission and distribution upgrades; the utility is not named.News 5 Cleveland (WEWS)

The News 5 Cleveland article (s1) shows no publication date; its images are dated 27 May 2026 and it links to a 29 May 2026 open house, so its figures are dated 2026-05. The Portager's June report (s2) relays the land-contract detail from News 5. Bitdeer says it is not seeking tax abatements and put phase 1 property tax revenue at about USD 2.17 million a year. The first buildings would use closed-loop liquid cooling with about 350 gallons of water a day and no wells. The August 2026 Portager article is partly paywalled; only its opening could be read. Further planning commission, zoning commission and trustee meetings were scheduled for 14 to 20 October 2026.

Sources for these details
Companies
  • Developer: Bitdeer Technologies Group (unknown scope) evidence
  • Developer: Bitdeer Technologies Group (unknown scope) evidence
  • Developer: Bitdeer Technologies Group (unknown scope) evidence
  • Developer: Bitdeer Technologies Group (unknown scope) evidence
  • Developer: Bitdeer Technologies Group (unknown scope) evidence
  • Developer: Geis Development (unknown scope) evidence
  • Developer: Geis Development (unknown scope) evidence
  • Developer: Geis Development (unknown scope) evidence
  • Developer: Geis Development (unknown scope) evidence
  • Owner: Shalersville Holdings (Geis Companies) (unknown scope) evidence
  • Owner: Shalersville Holdings (Geis Companies) (unknown scope) evidence
  • Government: Shalersville Township (unknown scope) evidence
  • Government: Shalersville Township (unknown scope) evidence
Source and location review
Status source
Shalersville redefines industrial zoning, adding obstacles to data center proposal evidence row
The Portager · published 2026-10-07 · News
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 20 days before the data update on 2026-10-27

Location details
Coordinates
41.24560, -81.26030
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Sources place the site at the Turnpike Commerce Center just north of the Ohio Turnpike in Shalersville Township, without coordinates. The point is the township coordinate from its Wikipedia article, not the site.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
54ab57f7

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Bitdeer and Geis Shalersville AI data center campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Asian crypto mining company and Geis partner to bring data center to Shalersville
Archived copy
The Portager
News
Imported: Geometry, Imported: Record, Role: Developersource-terms-not-recordedThe Portager622bf74cbf8b07572fa40da7977914ef71d57b53a381a9821843a371c3a6e1e0
Factual source record; not the publisher page
Bitdeer's 750MW Ohio AI Data Center Plan Draws Local Scrutiny
Archived copy
TheEnergyMag
Trade publication
Imported: Record, Metric: Buildings, Metric: Floor Area, Metric: Jobs Construction, Metric: Jobs Permanent, Metric: Land Area, Metric: Power Capacity, Milestone: Other, Role: Developersource-terms-not-recordedTheEnergyMag11e50168cf3b5815005d046c1345b548907723567d5c5296fe0be55476755d6a
Factual source record; not the publisher page
Local developer, global tech firm plan major data center project in Portage County
Archived copy
News 5 Cleveland (WEWS)
News
Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Floor Area, Metric: Investment, Metric: Jobs Permanent, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Power Source: Grid, Role: Developer, Role: Governmentnot statedsource-terms-not-recordedNews 5 Cleveland (WEWS)f6a3007c4e4217b2d8d35811264b7c05f9b358e085af00559331abd26b4e175e
Factual source record; not the publisher page
Shalersville redefines industrial zoning, adding obstacles to data center proposal
Archived copy
The Portager
News
Imported: Geometry, Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: Other, Role: Developer, Role: Government, Owner claimsource-terms-not-recordedThe Portager77e7e7c853f69d8a5f7674dc27a30fa93ea57ca69f3b611e81044c48c9110ee2
Factual source record; not the publisher page
Shalersville Township, Portage County, Ohio
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipediaac4826ec0e58c80bbdfe10930640761e46515c58aa034b1b2a739a372c51bc8c
Factual source record; not the publisher page
Shalersville weighs zoning changes to block data center
Archived copy
The Portager
News
Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Land Area, Role: Developer, Owner claimsource-terms-not-recordedThe Portager2cfc54b347553b38748b377197ff8d9e9bf3b4599b80191e0e102d45f0e56560
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Bitdeer and Geis Shalersville AI data center campus [site vcc-site-43a4fd4202a0c1c9518f]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-43a4fd4202a0c1c9518f/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction