CoreWeave/Chirisa Lancaster Greenfield Road Campus

Under construction

United States · 1 project · Last reported

Summary

AI data center development in Lancaster, Pennsylvania, on former LSC Communications printing plant sites, co-developed by Chirisa Technology Parks and Machine Investment Group with CoreWeave as tenant. In July 2025 CoreWeave said it intended to commit about 6 billion US dollars to equip an initial 100 MW facility expandable to 300 MW. Phase one reuses the plant at 216 Greenfield Road and was under construction by October 2025, targeting summer 2027. A new-build phase two of about 735,000 sq ft needed city land development approval; a site at 1375 Harrisburg Pike is also planned. A 4 billion US dollar joint venture with Blue Owl funds the campus.

Source record as of 2025-10-19 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 40.04869, -76.25609 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (1)

CoreWeave/Chirisa Lancaster Greenfield Phase 1 Adaptive-Reuse Project

Under construction last observed as of · Authoritative status update

This record reports under construction as of 2025-10-19. WITF (LNP | LancasterOnline)

Location: Lancaster, Lancaster County, Pennsylvania, US. City centroid from Wikipedia (s5). Sources give addresses at 216 Greenfield Road and 1375 Harrisburg Pike, but these were not geocoded, so the point is the city centroid rather than either site. CoreWeave; Government Technology (LNP via Tribune Content Agency); WITF (LNP | LancasterOnline); Wikipedia

Use: Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Investmentmore than 6,000,000,000 USDAnnounced · Campus2025-07-15CoreWeave's intent to commit funds to equip the data center, as worded in its newsroom copy of the announcement.CoreWeave
Investmentup to 6,000,000,000 USDAnnounced · Campus2025-07-15The investor-relations copy of the same July 15, 2025 announcement words the commitment as up to 6 billion US dollars rather than more than 6 billion.CoreWeave
Investment4,000,000,000 USDReported · Campus2025-09-16Joint venture funding from Blue Owl-managed funds and affiliates of Chirisa Technology Parks and Machine Investment Group.Holland & Knight
Investment10,000,000,000 USDReported · Campus2025-10-19Total cost of the Lancaster AI Hub across the Greenfield Road and Harrisburg Pike sites as reported by LNP.WITF (LNP | LancasterOnline)
Investmentup to 2,500,000,000 USDReported · Phase · Phase two2025-10-19Cost to build and equip, including computer equipment.WITF (LNP | LancasterOnline)
Power capacity100 MWPlanned · Phase · Unspecified · Initial capacity2025-07-15CoreWeave
Power capacityup to 300 MWPlanned · Campus · Unspecified2025-07-15Potential expansion.CoreWeave
Floor area450,000 sq_ftPlanned · Phase · Phase one (216 Greenfield Road)2025-08-08Government Technology (LNP via Tribune Content Agency)
Floor area735,128 sq_ftPlanned · Phase · Phase two2025-10-19Two-story new building.WITF (LNP | LancasterOnline)
Jobs constructionabout 600 countPlanned · Campus2025-07-15CoreWeave
Jobs permanentabout 175 countPlanned · Campus2025-07-15About 70 at launch, growing to about 175 over time.CoreWeave

Companies and organizations

NameRoleNotesSources
Chirisa Technology ParksDeveloperCoreWeave; Holland & Knight; WITF (LNP | LancasterOnline)
Machine Investment GroupDeveloperNamed as co-developer in CoreWeave's announcement.CoreWeave; WITF (LNP | LancasterOnline)
Machine Investment GroupInvestorJoint venture partner in the 4 billion US dollar funding.Holland & Knight
Blue Owl CapitalInvestorFunds managed by Blue Owl are joint venture partners.Holland & Knight
CoreWeaveTenantCoreWeave; Holland & Knight; WITF (LNP | LancasterOnline)
CoreWeaveInvestorDescribed as having invested in the campus.Holland & Knight
PPLUtilityA new PPL substation and switchyard are proposed next to the phase two building.WITF (LNP | LancasterOnline)

Timeline

DateEventActual or plannedNotesSources
2025-07-15AnnouncedActualAnnounced at the Pennsylvania Energy and Innovation Summit in Pittsburgh.CoreWeave
2025Construction startedActualDemolition at the Greenfield Road phase one site was underway by early August 2025, and phase one was described as under construction in October 2025; it needed no land development plan because it reuses an existing building footprint.Government Technology (LNP via Tribune Content Agency); WITF (LNP | LancasterOnline)
2025-09-16OtherActual4 billion US dollar joint venture with Blue Owl-managed funds announced.Holland & Knight
2027First operationalPlannedPhase one completion targeted for summer 2027.Government Technology (LNP via Tribune Content Agency)
2027OtherPlannedDeveloper said phase two could be online by mid to late 2027, pending city planning commission land development approval.WITF (LNP | LancasterOnline)

Power supply

TypeDescriptionSources
GridGrid supply from PPL with a proposed new substation and switchyard; the developer says it is spending 200 million US dollars on grid upgrades.WITF (LNP | LancasterOnline)
OtherBackup generators for power outages, located mainly between the two Greenfield Road buildings; the fuel is not stated.WITF (LNP | LancasterOnline)

CoreWeave's two published copies of its July 15, 2025 announcement differ: the newsroom copy says more than 6 billion US dollars and the investor-relations copy says up to 6 billion; both are recorded. LNP puts the whole Lancaster AI Hub at 10 billion US dollars, a figure that may include equipment and both sites.

Sources for these details
Source and location review
Status source
Chirisa Technology Parks data center locations evidence row
Chirisa Technology Parks · publication date not stated · Company disclosure
Locator
Campus locator · Official source · official_census_address_locator_point evidence
Source checks

Not reviewed against imagery not_reviewed_for_core_preview
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 97 days before the data update on 2026-10-27

Location details
Coordinates
40.04869, -76.25609
Geometry licence
public-domain-us-government
Use scope
Campus locator
Scope class
official_census_address_locator_point
Authority
Official source
Source entity
Campus
Method
census_public_ar_current_street_range_interpolation
Derivation
official_address_geocode
Precision scope
Official Census Public_AR_Current address-match point used only to locate the source-linked parent campus. Street-range interpolation can differ from a parcel, building, entrance, or surveyed position. The address identifies the adaptive-reuse property, but the Census point is not the existing shell or Phase 1 footprint.
Horizontal uncertainty
Not reported

The captured Census match supplies no bounded horizontal-accuracy value, and a street-range interpolation point is not asserted to fall within the campus, parcel, building, or project extent.

Geometry evidence
6600dddb

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for CoreWeave/Chirisa Lancaster Greenfield Road Campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Chirisa Technology Parks data center locations
Archived copy
Chirisa Technology Parks
Company disclosure
Campus address context, Physical statusnot statedall-rights-reservedChirisa Technology Parks6217db82caf16b110532ddd7ef4a4888f1803a8d590d4920289394b29392cdf3
Retained source material; see source provenance
CoreWeave Announces Multi-Billion Dollar Commitment to AI Infrastructure in Pennsylvania
Archived copy
CoreWeave
Company disclosure
Context: Multi Site Program, Imported: Record, Metric: Investmentsource-terms-not-recordedCoreWeave193bd3bbbc77a9e72fafc48c2bd628cf4de8e3fcf39ffd47700de7e67b743ca6
Factual source record; not the publisher page
CoreWeave Announces Multi-Billion Dollar Commitment to AI Infrastructure in Pennsylvania
Archived copy
CoreWeave
Company disclosure
Context: Multi Site Program, Imported: Geometry, Imported: Record, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Metric: Power Capacity, Milestone: Announced, Role: Developer, Tenant claimsource-terms-not-recordedCoreWeave3be2df33a24bd0edd66b48c068023e3c3d894e8f35b6d4fb76b41e7b722fb0d7
Factual source record; not the publisher page
Data center's second phase expected to cost up to $2.5 billion in Lancaster County
Archived copy
WITF (LNP | LancasterOnline)
News
Context: Multi Site Program, Imported: Geometry, Imported: Record, Imported: Status, Metric: Floor Area, Metric: Investment, Milestone: Construction Started, Milestone: Other, Power Source: Grid, Power Source: Other, Role: Developer, Tenant claim, Role: Utilitysource-terms-not-recordedWITF (LNP | LancasterOnline)ec2509437e139b284b0e32f312afdddfeefe5ab9157ec4183b0855eca61a934b
Factual source record; not the publisher page
Holland & Knight Advises Chirisa Technology Parks in $4 Billion Joint Venture Partnership for Lancaster Campus
Archived copy
Holland & Knight
Other
Context: Multi Site Program, Imported: Record, Metric: Investment, Milestone: Other, Role: Developer, Role: Investor, Tenant claimsource-terms-not-recordedHolland & Knight3f23f922af1ddd43e8578478c38a82e21d1e8800c2394f09a28408a26f626e3a
Factual source record; not the publisher page
Lancaster, Pa., Hearing to Revisit Data Center Zoning Decision
Archived copy
Government Technology (LNP via Tribune Content Agency)
News
Context: Multi Site Program, Imported: Geometry, Imported: Record, Metric: Floor Area, Milestone: Construction Started, Milestone: First Operationalsource-terms-not-recordedGovernment Technology (LNP via Tribune Content Agency)90562201b5441202e32685e3943eb976100b20781a9526eb39f7e73d597ed864
Factual source record; not the publisher page
Lancaster, Pennsylvania
Archived copy
Wikipedia
Other
Context: Multi Site Program, Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipediac53ac8935dc3976dd5177444586e9e41adf4aaafb9d688c41b861d785b3e40fc
Factual source record; not the publisher page
United States Census Geocoder Public_AR_Current exact-address matches for the v0.12 locator batch
Archived copy
United States Census Bureau
Government record
Geometrynot statedpublic-domain-us-governmentUnited States Census Bureaudb625d4738dc9a0eed46bd54216090509b1882f16c8b57578f43ac0fa76b0905
Retained source material; see source provenance
Cite this site

Kyars, K. (2026). CoreWeave/Chirisa Lancaster Greenfield Road Campus [site vcc-site-9b9b5ef71cedda52fd47]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9b9b5ef71cedda52fd47/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction