Google West Memphis data center campus

Under construction

United States · 1 project · Last reported

Summary

Google's first Arkansas data center campus, under construction at the south end of Bollinger Road in West Memphis, Crittenden County, on a property reported at 1,000 to 1,200 acres. Google announced it in October 2025 as part of a $4 billion Arkansas commitment running through 2027. The developer of record, Groot LLC, filed plans with the US Army Corps of Engineers in late 2024; earlier reporting described a proposed $10 billion campus with five data center buildings and a substation. Construction began in October 2025 on an 18-24 month schedule. Entergy Arkansas is supplying power under a contract with Google, which is paying part of the cost of a new Entergy solar and storage project.

Source record as of 2026-02-26 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 35.11630, -90.21150 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Approximate site reference; the exact facility position is unverified.

Projects (1)

Google West Memphis data center campus

Under construction last observed as of · Reported status

Location: West Memphis, Crittenden County, Arkansas, US. OpenStreetMap geometry of the southern end of Bollinger Road in West Memphis; sources place the campus at the south end of Bollinger Road. One source also gives 1500 South Loop Drive, which could not be resolved to a point. The campus parcel itself is not mapped here. The Daily Memphian; Action News 5 (WMC); Action News 5 (WMC)

Use: Cloud, Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Investment10,000,000,000 USDReported · Campus2025-05-30Proposed campus cost reported before Google confirmed its involvement; it differs from the other reported figures.Construction Briefing
Investment1,000,000,000 USDReported · Campus2025-09-05Local reporting described the data center as a $1 billion project at the time Google confirmed it; no phase breakdown or source for the figure was given, and it differs from the $10 billion reported earlier.The Daily Memphian
Floor area900,000 sq_ftPlanned · Campus2025-09-05Size given for the data center in local reporting at the time Google confirmed it; no phase breakdown was given.The Daily Memphian
Land areaabout 1,100 acresReported · Campus2026-02-26Sources differ on the property size: about 1,000, 1,100, 1,178 and almost 1,200 acres have all been reported.POWER Magazine; Action News 5 (WMC)
Land area1,178 acresReported · Campus2025-05-30Construction Briefing
Land areaabout 1,000 acresReported · Campus2025-10-02Talk Business & Politics
Land areaabout 1,200 acresReported · Campus2026-09-02Described as almost 1,200 acres.Action News 5 (WMC)
Buildings5 countPlanned · Campus2026-09-02Construction Briefing; Action News 5 (WMC)
Jobs permanentabout 300 countPlanned · Campus2026-02-26Reported as about 300 positions expected, with Google hiring electrical engineers and facilities technicians.Action News 5 (WMC)

Companies and organizations

NameRoleNotesSources
GoogleDeveloperGoogle; Talk Business & Politics; The Daily Memphian
Groot LLCDeveloperNamed as the developer of record in local filings. Before Google confirmed the project in September 2025, reports described Groot as widely believed to be backed by Google.The Daily Memphian; Construction Briefing
Entergy ArkansasPower supplierHolds the power contract with Google for the project and partnered with Google on the announcement. Trade press notes that West Memphis Utilities, not Entergy Arkansas, is the local utility serving the city.Talk Business & Politics; POWER Magazine; The Daily Memphian
Turner ConstructionBuilderReported in May 2025 as a lead contractor based on site signage.Construction Briefing
Yates ConstructionBuilderReported in May 2025 as a lead contractor based on site signage.Construction Briefing

Timeline

DateEventActual or plannedNotesSources
2024-12OtherActualGroot LLC submitted site plans to the US Army Corps of Engineers Memphis office for water-mitigation review.The Daily Memphian
2025-09-05OtherActualGoogle and Entergy Arkansas confirmed the project in a joint statement.The Daily Memphian
2025-10-02AnnouncedActualGoogle; Talk Business & Politics
2025-10Construction startedActualReported schedule of 18 to 24 months to complete.Action News 5 (WMC)
2026-09-02OtherActualReleased records showed Google paying Entergy $526 million upfront toward a $1.6 billion solar project tied to the data center, with the remainder recovered from ratepayers; a federal judge declined Entergy's request to force newspapers to remove stories on the deal.Action News 5 (WMC)

Power supply

TypeDescriptionSources
GridEntergy Arkansas is to supply power under its contract with Google, using solar and existing generation; earlier reports said Entergy was considering a 500/230 kV substation. Google says it will cover the facility's energy costs and reduce its workload during peak demand.Talk Business & Politics; POWER Magazine
SolarThe Google-Entergy contract includes investment in Cypress Solar, a 600 MW solar facility near Pine Bluff in Jefferson County; unlike Google's earlier solar PPAs, the money supports construction directly.Google; POWER Magazine
Battery storageThe Cypress Solar project includes a 350 MW battery energy storage facility to be built by Entergy Arkansas.POWER Magazine

Google's $4 billion figure is an Arkansas-wide commitment through 2027 that includes the West Memphis data center along with other cloud and AI infrastructure and local programs, so it is not recorded as a campus investment, although some news reports describe it as the cost of the West Memphis project. Reported campus cost and size figures conflict and are kept as separate statements.

Sources for these details

Entergy Arkansas announced 'a second phase of its service to support Google's presence in West Memphis'. The release says 'The project will fulfill Google's plan for data center buildings on the site and accelerate the ramp-up of the original announced project', and that the planned system upgrades, about $600 million of investment plus a power purchase agreement, all covered by Google, include a 1,000 MWh battery storage system at Driver Solar near Osceola and a 400 MWh system near Hot Springs (both expected online in 2028), a 440 MW (ac) solar purchase agreement from the Big Island solar facility under construction in Mississippi County, and 'Expansion of the Galet substation near West Memphis and construction of two new 230 kV transmission lines to serve the expanded data center campus'. Entergy Arkansas's chief executive says Google 'is increasing its investment in West Memphis and building on the significant success of its first phase'. The expansion contract will be submitted to the Arkansas Public Service Commission and, pending approval, has an expected in-service date in 2028. evidence

Entergy Corporation (Entergy Arkansas, LLC) · published 2026-10-19

Google's post of 19 October 2026 refers to its announced plans 'to build in West Memphis, Arkansas', distributes the first $1.25 million of its $25 million West Memphis Energy Impact Fund to ten local organisations, and says Google is 'continuing our partnership with Entergy Arkansas by investing in new energy and grid infrastructure that will strengthen the power system for all of its customers'. evidence

Google LLC · published 2026-10-19

Companies
  • Developer: Google (unknown scope) evidence
  • Developer: Google (unknown scope) evidence
  • Developer: Google (unknown scope) evidence
  • Developer: Groot LLC (unknown scope) evidence
  • Developer: Groot LLC (unknown scope) evidence
  • Power Supplier: Entergy Arkansas (unknown scope) evidence
  • Power Supplier: Entergy Arkansas (unknown scope) evidence
  • Power Supplier: Entergy Arkansas (unknown scope) evidence
  • Builder: Turner Construction (unknown scope) evidence
  • Builder: Yates Construction (unknown scope) evidence
Source and location review
Status source
Google hiring for new West Memphis data center evidence row
Action News 5 (WMC) · published 2026-02-26 · News
Locator
Approximate site reference · Compiled location reference · approximate_site evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 243 days before the data update on 2026-10-27

Location details
Coordinates
35.11630, -90.21150
Geometry licence
source-terms-not-recorded
Use scope
Approximate site reference
Scope class
approximate_site
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
OpenStreetMap geometry of the southern end of Bollinger Road in West Memphis; sources place the campus at the south end of Bollinger Road. One source also gives 1500 South Loop Drive, which could not be resolved to a point. The campus parcel itself is not mapped here.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
2a51650c

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Google West Memphis data center campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Docs reveal plans for $6 utility rate hike to help fund Google's data center project in West Memphis
Archived copy
Action News 5 (WMC)
News
Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Land Area, Milestone: Othersource-terms-not-recordedAction News 5 (WMC)f4770d14670c2941e86dadd12a6f0e1583fa2dce76254a8d4d7d6623aed829f8
Factual source record; not the publisher page
Entergy Arkansas: Entergy Arkansas announces enhanced partnership at Google West Memphis campus, delivering at least $500M in new savings for all customers (news release, 19 October 2026)
Archived copy
Entergy Corporation (Entergy Arkansas, LLC)
Utility record
Grid connection contextall-rights-reservedEntergyc15f5b89a4b3e24f54147e3577ee9ba86bd6ac7f1ba7ab410bbb627da1473f7c
Retained source material; see source provenance
Entergy Will Power $4-Billion Google Data Center in Arkansas
Archived copy
POWER Magazine
Trade publication
Imported: Record, Metric: Land Area, Power Source: Battery Storage, Power Source: Grid, Power Source: Solar, Role: Power Suppliersource-terms-not-recordedPOWER Magazinef5cb15a8afcdd89192afccae99f6648481d4c92569fc4e67fd81f48792ccee86
Factual source record; not the publisher page
Google announces new $4 billion investment in Arkansas
Archived copy
Google
Company disclosure
Imported: Record, Milestone: Announced, Power Source: Solar, Role: Developersource-terms-not-recordedGoogle63fab01b47ff32593042c8547f85fd792a691d652e9832ea3d3433e0c30ffd10
Factual source record; not the publisher page
Google announces plan to build $4 billion data center in West Memphis
Archived copy
Talk Business & Politics
News
Imported: Record, Metric: Land Area, Milestone: Announced, Power Source: Grid, Role: Developer, Role: Power Suppliersource-terms-not-recordedTalk Business & Politics183d60e83fb7ce0302162ac18b40f0488a4f4632ee46de49e6f08fada8f49217
Factual source record; not the publisher page
Google confirms West Memphis data center
Archived copy
The Daily Memphian
News
Imported: Geometry, Imported: Record, Metric: Floor Area, Metric: Investment, Milestone: Other, Role: Developer, Role: Power Suppliersource-terms-not-recordedThe Daily Memphian3e84462ee169684176df0c9de0cacf8861688276ff06cd02832f75e0b69dab60
Factual source record; not the publisher page
Google hiring for new West Memphis data center
Archived copy
Action News 5 (WMC)
News
Imported: Geometry, Imported: Record, Imported: Status, Metric: Jobs Permanent, Metric: Land Area, Milestone: Construction Startedsource-terms-not-recordedAction News 5 (WMC)0d2fbb198fd2bd12a21f2773cbff62c097f3776eaae2ad311c1a587e9336ec91
Factual source record; not the publisher page
Google linked to US$10bn data centre campus in US
Archived copy
Construction Briefing
Trade publication
Imported: Record, Metric: Buildings, Metric: Investment, Metric: Land Area, Role: Builder, Role: Developersource-terms-not-recordedConstruction Briefingb92722a345400782dfe2e83f3f72df01b0fb4de06024acfc42edd226bcd8d76e
Factual source record; not the publisher page
Google: 'Partnering to strengthen the grid and support local communities in Arkansas' (The Keyword, 19 October 2026)
Archived copy
Google LLC
Company disclosure
Grid connection contextall-rights-reservedGoogle22b6843e3efe7ccd59f4d6b8cbcc243174f9c81123131e40a72b765fc6acaa13
Retained source material; see source provenance
Cite this site

Kyars, K. (2026). Google West Memphis data center campus [site vcc-site-1c393b2e71d64f0ffd69]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1c393b2e71d64f0ffd69/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction