Applied Digital Polaris Forge 2 Campus

Under construction

United States · 2 projects · Last reported

Summary

Applied Digital Polaris Forge 2

Applied Digital AI data center campus near Harwood in Cass County, North Dakota, on more than 900 acres. Announced in August 2025 as a 3 billion US dollar, 280 MW project, it was later described as a 1 GW campus. An unnamed US investment-grade hyperscaler leased the first 200 MW of critical IT load in two buildings for about 15 years and holds a right of first refusal on 800 MW more. Construction is funded partly by 2.15 billion US dollars of senior secured notes issued in March 2026; the company expects initial operations by the end of 2026 and the full 200 MW in 2027.

Source record as of 2026-10-07 · Details and sources

Polaris Forge 2 Current Construction

Applied Digital's 7 October 2026 results release states that Polaris Forge 2 is in various stages of construction and that the company expects initial operations at Polaris Forge 2 in Harwood by the end of calendar 2026. The expected operations date is a forecast; no completion or operation is established. evidence

Applied Digital Corporation · published 2026-10-07

Location

The interactive map needs JavaScript. Display anchor: 46.96694, -96.86849 (Polygon locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (2)

Applied Digital Polaris Forge 2

Under construction last observed as of · Reported status

Location: Harwood, Cass County, North Dakota, US. Town centroid of Harwood from its Wikipedia coordinates (s6), which also places Harwood in Cass County; company sources say only that the campus is near Harwood and give no parcel. Applied Digital; Applied Digital via GlobeNewswire (FinancialContent); Applied Digital; Wikipedia

Use: Ai unspecified, Hpc

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Investment3,000,000,000 USDAnnounced · Campus2025-08-18Figure given with the original 280 MW plan.Applied Digital
Power capacity280 MWPlanned · Campus · Unspecified2025-08-18Initial size at announcement; the release said the campus could scale beyond this.Applied Digital
Power capacity200 MWContracted · Phase · It load · Initial two buildings2025-10-22Critical IT load leased to an unnamed hyperscaler for an estimated 15 years, about 5 billion US dollars of contracted revenue.Applied Digital via GlobeNewswire (FinancialContent); Applied Digital
Power capacity1,000 MWPlanned · Campus · Unspecified2025-10-22Described as a 1 GW campus; the tenant holds a right of first refusal on a further 800 MW of critical IT load representing the full expansion.Applied Digital via GlobeNewswire (FinancialContent)
Land areamore than 900 acresReported · Campus2025-08-18Land the company says it has contracted.Applied Digital; Applied Digital via GlobeNewswire (FinancialContent)
Buildings2 countPlanned · Phase · Initial two buildings2025-10-22Applied Digital; Applied Digital via GlobeNewswire (FinancialContent)
Jobs permanentmore than 200 countPlanned · Campus2025-08-18Full-time employees expected at full operation, plus long-term contractors.Applied Digital

Companies and organizations

NameRoleNotesSources
Applied DigitalDeveloperApplied Digital; Applied Digital via GlobeNewswire (FinancialContent)
Cass County Electric CooperativeUtilityNamed as the power provider; in August 2025 the cooperative said it was finalizing an agreement.Applied Digital; Valley News Live
OracleTenantReported by Valley News Live in March 2026 without attribution; Applied Digital describes the tenant only as an unnamed US investment-grade hyperscaler, so this is not confirmed by the companies.Valley News Live

Timeline

DateEventActual or plannedNotesSources
2025-08-18AnnouncedActualApplied Digital
2025-09Construction startedPlannedGroundbreaking target given at announcement; by October 2025 the company described the campus as under construction.Applied Digital; Applied Digital via GlobeNewswire (FinancialContent)
2025-10-22OtherActualLease of 200 MW of critical IT load to an unnamed US investment-grade hyperscaler announced.Applied Digital via GlobeNewswire (FinancialContent)
2026-03-10OtherActualClosing of 2.15 billion US dollars of 6.75 percent senior secured notes due 2031 to fund the 200 MW build.Valley News Live; Applied Digital
2026First operationalPlannedIn October 2026 the company said initial operations here would bring its delivered North Dakota capacity to 300 MW by the end of calendar 2026.Applied Digital via GlobeNewswire (FinancialContent); U.S. Securities and Exchange Commission (Applied Digital filing)
2027Fully operationalPlannedTarget for reaching the full initial 200 MW.Applied Digital via GlobeNewswire (FinancialContent)

Power supply

TypeDescriptionSources
GridPower secured through Cass County Electric Cooperative, with Minnkota Power Cooperative also working toward a final agreement as of August 2025.Applied Digital

Related projects: applied digital polaris forge 1, applied digital polaris forge 3

Sources for these details
Companies
  • Developer: Applied Digital (unknown scope) evidence
  • Developer: Applied Digital (unknown scope) evidence
  • Utility: Cass County Electric Cooperative (unknown scope) evidence
  • Utility: Cass County Electric Cooperative (unknown scope) evidence
  • Tenant: Oracle (unknown scope) evidence
Source and location review
Status source
Applied Digital Reports Fiscal Fourth Quarter and Full Year 2026 Results evidence row
Applied Digital · published 2026-07-27 · Company disclosure
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 20 days before the data update on 2026-10-27

Polaris Forge 2 Current Construction

Under construction last observed as of · Authoritative status update

Source and location review
Status source
Applied Digital Reports Fiscal First Quarter 2027 Results evidence row
Applied Digital Corporation · published 2026-10-07 · Company disclosure
Locator
Campus locator · Official source · official_constituent_tax_parcel evidence
Source checks

Not reviewed against imagery not_reviewed_for_core_preview
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 20 days before the data update on 2026-10-27

Location details
Coordinates
46.96694, -96.86849
Geometry licence
public-domain-per-Cass-County-item-policy
Use scope
Campus locator
Scope class
official_constituent_tax_parcel
Authority
Official source
Source entity
Campus
Method
Cass_GISPIN75000000120020_native_EPSG3857_to_EPSG4326_server_independently_checked
Derivation
official_constituent_tax_parcel
Precision scope
Official corporate tax parcel at the exact NDDEQ data-center-associated generator address; one campus locator, not the complete PF2 campus boundary or the construction footprint of both buildings. WGS84 returned ring independently agrees with native Web Mercator conversion within 1.43e-14 degrees. No parcel survey accuracy is published.
Horizontal uncertainty
Not reported

No source-specific numeric accuracy is supplied. Coordinate decimals and transformation agreement are not source positional accuracy.

Geometry evidence
1e7d82eb 6946a0b0 a15f97b3 d07a6f63

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Applied Digital Polaris Forge 2 Campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Applied Digital Announces $5 Billion AI Factory Lease with U.S. Based Investment Grade Hyperscaler at Polaris Forge 2 ND Campus
Archived copy
Applied Digital via GlobeNewswire (FinancialContent)
Company disclosure
Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Land Area, Metric: Power Capacity, Milestone: Construction Started, Milestone: First Operational, Milestone: Fully Operational, Milestone: Other, Role: Developersource-terms-not-recordedApplied Digital via GlobeNewswire (FinancialContent)1efd0285feabd1d8ea442c76f3f5f3c97916ab21107bfa3912727111cafdfe39
Factual source record; not the publisher page
Applied Digital closes $2.15B deal to build out Harwood AI campus
Archived copy
Valley News Live
News
Imported: Record, Milestone: Other, Tenant claim, Role: Utilitysource-terms-not-recordedValley News Livedd05e8c83771a205e5b9609969b4af5832539137cd20037fa8ad2adc77f8d3ed
Factual source record; not the publisher page
Applied Digital fiscal fourth-quarter 2026 operational update - Polaris Forge 2
Archived copy
Applied Digital Corporation
Company disclosure
Geometry identity context, Site distinctness context, Physical statusno-open-redistribution-license-assertedApplied Digital Corporation4595c173b9adad5bf1f4e071a8181301058cca4afb318f9e9b081122643b2db8
Retained source material; see source provenance
Applied Digital Reports Fiscal First Quarter 2027 Results
Archived copy
Applied Digital Corporation
Company disclosure
Physical statusall-rights-reservedApplied Digital Corporation800f8b057f347d0ebf3990e1e78e30d5d4969135f172932b7c7439a91bce393e
Retained source material; see source provenance
Applied Digital Reports Fiscal First Quarter 2027 Results (Form 8-K exhibit)
Archived copy
U.S. Securities and Exchange Commission (Applied Digital filing)
Regulatory filing
Imported: Record, Imported: Status, Milestone: First Operationalsource-terms-not-recordedU.S. Securities and Exchange Commission (Applied Digital filing)637a3322bf4319ccf49f2cb613ff0047bbcbd768cf2b900b4d8ab7dd3297ed92
Factual source record; not the publisher page
Applied Digital Reports Fiscal Fourth Quarter and Full Year 2026 Results
Archived copy
Applied Digital
Company disclosure
Imported: Geometry, Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: Othersource-terms-not-recordedApplied Digitald60985ea9f3f3173cd51bfb25bd992fc7f899c7955da9a0f76f4cfb12d3be17d
Factual source record; not the publisher page
Applied Digital to Break Ground on $3 Billion Polaris Forge 2 Campus in September 2025
Archived copy
Applied Digital
Company disclosure
Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Investment, Metric: Jobs Permanent, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Milestone: Construction Started, Power Source: Grid, Role: Developer, Role: Utilitysource-terms-not-recordedApplied Digitalaaa9641b76e94d7f23e7bfe59b3b2d49c344c9f1b195d7b2b0cda67820307503
Factual source record; not the publisher page
Cass County parcel layer schema
Archived copy
Cass County North Dakota
Government record
Site distinctness context, Geometrynot statedpublic-domain-per-Cass-County-item-policyCass County North Dakotae9302b63de5d2bf4b789538f8bf891e29f6427083cf1bf66ae90159656825dbb
Retained source material; see source provenance
Cass County tax parcel item and reuse policy
Archived copy
Cass County North Dakota
Government record
Site distinctness context, Geometrynot statedpublic-domain-per-Cass-County-item-policyCass County North Dakotabea40a044cc8dfdee365e9b35d5a4c80598abed542d4bd202fb274d02a10e876
Retained source material; see source provenance
Exact Cass County APLD FAR-01 parcel
Archived copy
Cass County North Dakota
Government record
Site distinctness context, Geometrynot statedpublic-domain-per-Cass-County-item-policyCass County North Dakota14aa4e3e568e41c7457aa744301e11a0002f23d2ef4256ff6989d64eb330de4f
Retained source material; see source provenance
Exact Cass County APLD FAR-01 parcel native-coordinate cross-check
Archived copy
Cass County North Dakota
Government record
Site distinctness context, Geometrynot statedpublic-domain-per-Cass-County-item-policyCass County North Dakotacf87f41e67a768d3b120a4ae87b47f2a5a0a6e5fa7604e8d8519193a50ec851c
Retained source material; see source provenance
Harwood, North Dakota
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia246d346ed598debe54050a2aebeba77a53ff9f4fa16b8d55d2556311f662c736
Factual source record; not the publisher page
NDDEQ Applied Digital FAR campus address and data-center association
Archived copy
North Dakota Department of Environmental Quality
Government record
Geometry identity context, Site distinctness contextno-open-redistribution-license-assertedNorth Dakota Department of Environmental Qualitya971451d4d089ec762f248eda0b194c33a31f4b64747f005bc00a18f57c537de
Retained source material; see source provenance
Cite this site

Kyars, K. (2026). Applied Digital Polaris Forge 2 Campus [site vcc-site-847f0ddc67e6e40ce38a]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-847f0ddc67e6e40ce38a/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction