TeraWulf Muskie Data Campus
Announced
United States · 1 project · Last reported
Summary
TeraWulf AI and HPC campus in the EastPark Industrial Park in northeast Kentucky, near Ashland on the Boyd and Greenup county line, bought from Industrial Equity Partners in May 2026 with about 285 acres owned or controlled (308 acres per its August release). Kentucky Power, an AEP company, is building a 765/345 kV substation to serve it. In October 2026 TeraWulf raised contracted power to 1 GW under an amended service agreement: the first 500 MW is due to start ramping in 2028 and the second 500 MW was pulled forward to 2029, subject to state regulatory approval. TeraWulf is studying up to 2 GW; no tenant has been named.
Source record as of 2026-10-05 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 38.36000, -82.69000 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
County or district reference only; the facility position is not established.
Projects (1)
TeraWulf Muskie Data Campus
Announced last observed as of · Reported status
Location: Boyd County, Kentucky, US. Local media place the site in EastPark near Ashland and Interstate 64, spanning the Boyd and Greenup county line; TeraWulf's Q2 2026 release describes it as Grayson, Eastern Kentucky. Coordinates are the Boyd County point from its Wikipedia article, not the site. TeraWulf; WEKU; WSAZ; WEKU; Wikipedia
Use: Ai unspecified, Hpc
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | 1,000 MW | Contracted · Campus · Grid connection | 2026-10-05 | Contracted electric service with Kentucky Power. The October 2026 release says an amended agreement raised it from 500 MW to 1 GW, with the second 500 MW still needing Kentucky Public Service Commission approval; the August 2026 release already described agreements providing for up to 1 GW. | TeraWulf; TeraWulf |
| Power capacity | 500 MW | Planned · Phase · Unspecified · Phase 1 | 2026-10-05 | Initial phase, targeted to begin ramping in the second half of 2028. | TeraWulf; TeraWulf |
| Power capacity | up to 2,000 MW | Planned · Campus · Unspecified | 2026-10-05 | Long-term potential TeraWulf is evaluating, subject to further utility planning and agreements; not a commitment. | TeraWulf; WEKU |
| Land area | about 285 acres | Acquired · Campus | 2026-05-26 | Owned or controlled within the roughly 1,000-acre EastPark Industrial Park, with optional adjacent land for expansion; local reports describe nearly 300 acres. | TeraWulf |
| Land area | about 308 acres | Acquired · Campus | 2026-08-05 | Size given in TeraWulf's Q2 2026 release; the May 2026 release gave about 285 acres. | TeraWulf |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| TeraWulf | Developer | TeraWulf; TeraWulf; TeraWulf | |
| TeraWulf | Owner | Acquired the campus in May 2026; owns or controls about 285 acres. | TeraWulf; TeraWulf |
| Kentucky Power | Utility | AEP subsidiary; signed transmission and electric service agreements and is building the serving substation. | TeraWulf; TeraWulf |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2026-05-26 | Site acquired | Actual | TeraWulf announced the acquisition from Industrial Equity Partners together with signed transmission and energy service agreements; the site was already zoned and permitting was under way. | TeraWulf; TeraWulf |
| 2026-10-05 | Expansion announced | Actual | Contracted power raised from 500 MW to 1 GW and the second phase moved up from 2030 to 2029. | TeraWulf |
| 2028-H2 | First operational | Planned | First 500 MW to start ramping; the Q2 2026 release gives initial service in Q4 2028. | TeraWulf; TeraWulf; TeraWulf |
| 2029 | Other | Planned | Target for the second 500 MW, subject to Kentucky PSC approval and Kentucky Power's construction schedule. | TeraWulf |
Power supply
| Type | Description | Sources |
|---|---|---|
| Grid | Kentucky Power is building a 765/345 kV substation tied to the existing 765 kV transmission network to serve the campus under large-load tariff agreements. | TeraWulf; TeraWulf |
The campus straddles Boyd and Greenup counties, so admin2 records Boyd County only as the reference point used for coordinates. Boyd County's judge-executive told a June 2026 town hall that the site would use a closed-loop water system and that the company would pay for on-site power upgrades.
Sources for these details
- TeraWulf expands infrastructure platform with acquisition of 1+ GW Eastern Kentucky HPC campus — TeraWulf; 2026-05-26 · Archived source
- TeraWulf reports second quarter 2026 results — TeraWulf; 2026-08-05 · Archived source
- TeraWulf expands contracted power capacity at its Muskie Data Campus to 1 GW — TeraWulf; 2026-10-05 · Archived source
- New data center project announced in northeastern Kentucky — WEKU; 2026-05-26
- Neighbors ask questions and address concerns in data center town hall — WSAZ; 2026-06-01 · Archived source
- TeraWulf tells investors it could double the size of one of its Kentucky data center projects — WEKU; 2026-08-06
- Boyd County, Kentucky — Wikipedia; publication date not stated · Archived source
- Companies
- Developer: TeraWulf (unknown scope) evidence
- Developer: TeraWulf (unknown scope) evidence
- Developer: TeraWulf (unknown scope) evidence
- Owner: TeraWulf (unknown scope) evidence
- Owner: TeraWulf (unknown scope) evidence
- Utility: Kentucky Power (unknown scope) evidence
- Utility: Kentucky Power (unknown scope) evidence
Source and location review
- Status source
- TeraWulf expands contracted power capacity at its Muskie Data Campus to 1 GW evidence row
TeraWulf · published 2026-10-05 · Company disclosure - Locator
- County or district reference only · Compiled location reference · admin2 evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 22 days before the data update on 2026-10-27
Location details
- Coordinates
- 38.36000, -82.69000
- Geometry licence
- source-terms-not-recorded
- Use scope
- County or district reference only
- Scope class
- admin2
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- Local media place the site in EastPark near Ashland and Interstate 64, spanning the Boyd and Greenup county line; TeraWulf's Q2 2026 release describes it as Grayson, Eastern Kentucky. Coordinates are the Boyd County point from its Wikipedia article, not the site.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- f8fe5488
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Boyd County, Kentucky Archived copy | Wikipedia Other | Imported: Geometry, Imported: Record | not stated | source-terms-not-recorded | Wikipedia | 4f8eb9abb0691e3a98cd44612b6e685e22ee0fd00bb8d4060814d926f29a8fd4Factual source record; not the publisher page | |
| Neighbors ask questions and address concerns in data center town hall Archived copy | WSAZ News | Imported: Geometry, Imported: Record | source-terms-not-recorded | WSAZ | a3dcd4e65159a15405a6d246a7fe4433b6c419da11ee41420f0cf904193dcf4dFactual source record; not the publisher page | ||
| New data center project announced in northeastern Kentucky Archived copy | WEKU News | Imported: Geometry, Imported: Record | source-terms-not-recorded | WEKU | 3ccc2d58a14dcf02c0b9ed39f4e0cf09e1aecda396bfb944285e403d225ac2e5Factual source record; not the publisher page | ||
| TeraWulf expands contracted power capacity at its Muskie Data Campus to 1 GW Archived copy | TeraWulf Company disclosure | Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: Expansion Announced, Milestone: First Operational, Milestone: Other, Power Source: Grid, Role: Developer, Owner claim, Role: Utility | source-terms-not-recorded | TeraWulf | 53bd85268fb2d158eacc22fd2e69edb4d6714f797fcb0b17f6be3027579fcac1Factual source record; not the publisher page | ||
| TeraWulf expands infrastructure platform with acquisition of 1+ GW Eastern Kentucky HPC campus Archived copy | TeraWulf Company disclosure | Imported: Geometry, Imported: Record, Metric: Land Area, Metric: Power Capacity, Milestone: First Operational, Milestone: Site Acquired, Power Source: Grid, Role: Developer, Owner claim, Role: Utility | source-terms-not-recorded | TeraWulf | bd2c28514a0111fb64762e734a75bc4d6eb68ca91c45c5743ab4fc58a1ea1fafFactual source record; not the publisher page | ||
| TeraWulf reports second quarter 2026 results Archived copy | TeraWulf Company disclosure | Imported: Record, Metric: Land Area, Metric: Power Capacity, Milestone: First Operational, Milestone: Site Acquired, Role: Developer | source-terms-not-recorded | TeraWulf | 8ccfd714dc335603ac223a0bcafa6dfae95dc2f6084506686760a5153cbe48a6Factual source record; not the publisher page | ||
| TeraWulf tells investors it could double the size of one of its Kentucky data center projects Archived copy | WEKU News | Imported: Geometry, Imported: Record, Metric: Power Capacity | source-terms-not-recorded | WEKU | 16253694bd4ac833c8502bf049b990f7a54c60d9a605606fbda4ced6cc93e4ecFactual source record; not the publisher page |