Cipher Digital Black Pearl Wink Data Center Campus
Partially operational Under construction
United States · 2 projects · Last reported
Summary
Cipher Black Pearl data center
Cipher Digital (formerly Cipher Mining) facility on about 75 company-owned acres near Wink, Texas, with 300 MW of approved ERCOT interconnection. Cipher began bitcoin mining there in June 2025, signed a 15-year lease with Amazon Web Services for about 300 gross MW of turnkey data center capacity, which it valued at about USD 5.5 billion, and stopped mining in February 2026. Cipher said it delivered the first data center capacity and rent began in August 2026, two months ahead of the original schedule, while the remaining phase I halls were in fit-out and phase II was still being built.
Source record as of 2026-08-04 · Details and sources
Cipher Digital Black Pearl Phase II Current Build
Cipher reports Black Pearl Phase II concrete foundations, building steel and underground electrical in progress while remaining Phase I halls undergo fit-out. evidence
Cipher Digital Inc. · published 2026-08-04T11:00:00Z
Location
The interactive map needs JavaScript. Display anchor: 31.69132, -103.06700 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Campus reference; individual project footprints are not mapped.
Projects (2)
Cipher Black Pearl data center
Partially operational last observed as of · Reported status
Location: Wink, Winkler County, Texas, US. Filings place the facility in or near Wink but give no street address. Coordinates are the Wink town point from its Wikipedia article, which also gives the county. Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR; Cipher Mining Inc. via SEC EDGAR; Wikipedia
Use: Ai unspecified, Hpc, Crypto mining
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | about 300 MW | Contracted · Campus · Unspecified | 2026-02-24 | Gross turnkey data center capacity leased to AWS, per the 10-K; the November 2025 release gives 300 MW. Cipher does not separate IT and facility load. | Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR; Cipher Mining Inc. via SEC EDGAR |
| Power capacity | 300 MW | Permitted · Campus · Grid connection | 2026-02-24 | Approved interconnection capacity on the ERCOT grid. | Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR |
| Power capacity | 150 MW | Operational · Phase · Unspecified · Former bitcoin mining operation (2025 to February 2026) | 2025-09 | Mining capacity reached by September 2025; mining stopped in February 2026 for the AWS conversion. | Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR |
| Land area | about 75 acres | Acquired · Campus | 2026-02-24 | Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| Cipher Digital (formerly Cipher Mining) | Developer | Formerly Cipher Mining; develops the site through wholly owned subsidiaries Cipher Black Pearl LLC and Black Pearl Compute LLC. | Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR; Cipher Digital Inc. via SEC EDGAR; Cipher Mining Inc. via SEC EDGAR |
| Cipher Digital (formerly Cipher Mining) | Owner | The land is owned by a wholly owned Cipher subsidiary and the facility is described as wholly owned. | Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR |
| Amazon Web Services | Tenant | Named as the Black Pearl lessee only in the 10-K (s1), which dates the 15-year lease of about 300 gross MW to both October and November 2025. The November 2025 release (s2) announces the AWS lease without naming the site, and the August 2026 updates refer to an unnamed investment-grade hyperscale tenant. | Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR; Cipher Mining Inc. via SEC EDGAR |
| Quanta Services | Builder | Cipher names Quanta as an engineering, construction and procurement partner for sites such as Black Pearl. | Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2025-06 | First operational | Actual | Bitcoin mining began at the site; this predates the AI/HPC conversion. | Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR |
| 2025 | Construction started | Actual | Retrofit and development of the 300 MW data center began in 2025. | Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR |
| 2025-11-03 | Announced | Actual | Cipher announced the 15-year, roughly USD 5.5 billion AWS lease for 300 MW, without naming the site in the release. | Cipher Mining Inc. via SEC EDGAR |
| 2026-02 | Other | Actual | Bitcoin mining at the site ceased, and the USD 2.0 billion Black Pearl notes offering closed on 2026-02-11. | Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR; Cipher Mining Inc. via SEC EDGAR |
| 2026-08 | Other | Actual | First data center capacity delivered to the tenant and rent began, about two months ahead of the original schedule after a lease amendment. | Cipher Digital Inc. via SEC EDGAR; Cipher Digital Inc. via SEC EDGAR |
| 2027-Q1 | Fully operational | Planned | Rent was expected to fully ramp by Q1 2027 when the final subphase is complete. | Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR |
Power supply
| Type | Description | Sources |
|---|---|---|
| Grid | Approved for 300 MW of interconnection and set up to take part in the ERCOT market. | Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR |
The 10-K is the only source opened that names AWS as the Black Pearl lessee; the August 2026 releases refer to an unnamed investment-grade hyperscale tenant. Delivery moved forward: the 10-K targeted first rent by Q4 2026, and an amended lease brought first delivery to August 2026. In February 2026 subsidiary Black Pearl Compute LLC issued USD 2.0 billion of senior secured notes to fund the remaining facility cost, repay about USD 232.5 million of Cipher equity and fund reserves and fees; this is debt financing, not a disclosed project cost. The crypto_mining tag reflects the former 2025 mining use only.
Sources for these details
- Cipher annual report on Form 10-K for fiscal year 2025 — Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR; 2026-02-24 · Archived source
- Cipher Mining provides third quarter 2025 business update (Form 8-K, Exhibit 99.1) — Cipher Mining Inc. via SEC EDGAR; 2025-11-03
- Cipher Digital Provides Second Quarter 2026 Business Update (Form 8-K Exhibit 99.1) — Cipher Digital Inc. via SEC EDGAR; 2026-08-04
- Cipher Digital business update presentation (Form 8-K Exhibit 99.2) — Cipher Digital Inc. via SEC EDGAR; 2026-08-04 · Archived source
- Cipher Mining Form 8-K: Black Pearl Compute LLC 6.125% senior secured notes due 2031 — Cipher Mining Inc. via SEC EDGAR; 2026-02-11 · Archived source
- Wink, Texas — Wikipedia; publication date not stated
- Companies
- Developer: Cipher Digital (formerly Cipher Mining) (unknown scope) evidence
- Developer: Cipher Digital (formerly Cipher Mining) (unknown scope) evidence
- Developer: Cipher Digital (formerly Cipher Mining) (unknown scope) evidence
- Owner: Cipher Digital (formerly Cipher Mining) (unknown scope) evidence
- Tenant: Amazon Web Services (unknown scope) evidence
- Tenant: Amazon Web Services (unknown scope) evidence
- Builder: Quanta Services (unknown scope) evidence
Source and location review
- Status source
- Cipher Digital Provides Second Quarter 2026 Business Update (Form 8-K Exhibit 99.1) evidence row
Cipher Digital Inc. via SEC EDGAR · published 2026-08-04 · Regulatory filing - Locator
- Locality reference only · Compiled location reference · locality evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 84 days before the data update on 2026-10-27
Cipher Digital Black Pearl Phase II Current Build
Under construction last observed as of · Authoritative status update
Source and location review
- Status source
- Cipher August 4 business update: Black Pearl Phase II foundations, steel and underground electrical in progress evidence row
Cipher Digital Inc. · published 2026-08-04T11:00:00Z · Company disclosure - Locator
- Campus locator · Official source · official_address_point_for_campus_site_address evidence
- Source checks
Not reviewed against imagery not_
reviewed_ for_ core_ preview
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 84 days before the data update on 2026-10-27
Location details
- Coordinates
- 31.69132, -103.06700
- Geometry licence
- public-use-as-is
- Use scope
- Campus locator
- Scope class
- official_address_point_for_campus_site_address
- Authority
- Official source
- Source entity
- Campus
- Method
- TxGIO_StratMap_address_point_query_by_full_addr_and_county_outSR4326_round7
- Derivation
- official_9_1_1_address_point_for_exact_primary_site_address
- Precision scope
- The official statewide 9-1-1 address point for the exact site address named by primary identity sources. It locates the campus address, not a data hall, phase, parcel boundary, footprint or current work extent. Source value rounded to seven decimals.
- Horizontal uncertainty
Not reported
TxGIO states that each authoritative 9-1-1 source applies its own point-placement guideline and policy (rooftop, parcel centroid or street centreline are not fixed) and publishes no positional accuracy for individual points.
- Geometry evidence
- 322acf52 eb0bee76
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Cipher annual report on Form 10-K for fiscal year 2025 Archived copy | Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR Regulatory filing | Imported: Geometry, Imported: Record, Metric: Land Area, Metric: Power Capacity, Milestone: Construction Started, Milestone: First Operational, Milestone: Fully Operational, Milestone: Other, Power Source: Grid, Role: Builder, Role: Developer, Owner claim, Tenant claim | source-terms-not-recorded | Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR | 3345385ab5f43f3ec15a4408533e1a594fce548ad159cc17f243022c7faf2a05Factual source record; not the publisher page | ||
| Cipher August 4 business update: Black Pearl Phase II foundations, steel and underground electrical in progress Archived copy | Cipher Digital Inc. Company disclosure | Geometry identity context, Site distinctness context, Physical status | all-rights-reserved | Cipher Digital Inc., via GlobeNewswire | e11b4a4092c3d7844d87a421aa1129dd1b18fd4fec50590a8630205a730a05bcRetained source material; see source provenance | ||
| Cipher Digital business update presentation (Form 8-K Exhibit 99.2) Archived copy | Cipher Digital Inc. via SEC EDGAR Regulatory filing | Imported: Record, Imported: Status, Milestone: Other | source-terms-not-recorded | Cipher Digital Inc. via SEC EDGAR | abbad20274aa08e0352963462e6c43b2b7a483e2120b7f170f4fcef87547c777Factual source record; not the publisher page | ||
| Cipher Digital Provides Second Quarter 2026 Business Update (Form 8-K Exhibit 99.1) Archived copy | Cipher Digital Inc. via SEC EDGAR Regulatory filing | Imported: Record, Imported: Status, Milestone: Other, Role: Developer | source-terms-not-recorded | Cipher Digital Inc. via SEC EDGAR | 91ff60239ad8e44807502249ceaaf6ce63c03c60f913cdd5636dc35746a60dd8Factual source record; not the publisher page | ||
| Cipher Mining Form 8-K: Black Pearl Compute LLC 6.125% senior secured notes due 2031 Archived copy | Cipher Mining Inc. via SEC EDGAR Regulatory filing | Imported: Geometry, Imported: Record, Milestone: Other, Role: Developer | source-terms-not-recorded | Cipher Mining Inc. via SEC EDGAR | 8983fc0ad42d0de8cc430ca5b4ead85f2187236dfc2b93645e3ba0c1e6818bb6Factual source record; not the publisher page | ||
| Cipher Mining provides third quarter 2025 business update (Form 8-K, Exhibit 99.1) Archived copy | Cipher Mining Inc. via SEC EDGAR Regulatory filing | Imported: Record, Metric: Power Capacity, Milestone: Announced, Tenant claim | source-terms-not-recorded | Cipher Mining Inc. via SEC EDGAR | 5426b595657fc8b3440d8e0bfb2007b4f2e4e8463c42ac4a6802a78391f3cfceFactual source record; not the publisher page | ||
| Cipher Q2 2026 Form 10-Q: 300 MW Black Pearl Facility in Wink, Texas Archived copy | Cipher Digital Inc. Company disclosure | Geometry identity context, Site distinctness context | not stated | public-sec-filing | Cipher Digital Inc. Form 10-Q, as mirrored on its investor-relations site | 41fc2a034a9ac18d2f8602d47d9aacf811de4ff99ebfdb8fa5aab34a7383a24dRetained source material; see source provenance | |
| TCEQ Central Registry RN112175997 'BLACK PEARL DATA CENTER' at 11786 CR 209, Wink Archived copy | Texas Commission on Environmental Quality Government record | Geometry identity context, Site distinctness context | not stated | public-record-as-is | Texas Commission on Environmental Quality | 6a51d87ad394c48377b1911ad3b17f7d53b2503a08f2b308b83b444ba16e302fRetained source material; see source provenance | |
| TxGIO StratMap 9-1-1 address point: 11786 COUNTY ROAD 209, Winkler County Archived copy | Texas Geographic Information Office (TxGIO), Texas Water Development Board Government record | Site distinctness context, Geometry | not stated | public-use-as-is | Texas Geographic Information Office, StratMap Address Points; 9-1-1 source authority CSEC | 4553fd4858e5e6662a252e22433323fc2af68368201a5afb9eeca32d81dcd2baRetained source material; see source provenance | |
| TxGIO StratMap address point in native Web Mercator: 11786 COUNTY ROAD 209 Archived copy | Texas Geographic Information Office (TxGIO), Texas Water Development Board Government record | Site distinctness context, Geometry | not stated | public-use-as-is | Texas Geographic Information Office, StratMap Address Points; 9-1-1 source authority CSEC | 9d4af87af48e3fe87275465e74ba89d2b2f062086f756823805ce3f7861c34beRetained source material; see source provenance | |
| Wink, Texas Archived copy | Wikipedia Other | Imported: Geometry, Imported: Record | not stated | source-terms-not-recorded | Wikipedia | fa3852848b65ffbf7f7b0414cffe0ecfac86cc762e76bc12f27233278f948413Factual source record; not the publisher page |
Cite this site
Kyars, K. (2026). Cipher Digital Black Pearl Wink Data Center Campus [site vcc-site-6bedc032f2f6fb914715]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6bedc032f2f6fb914715/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction