Cipher Digital Black Pearl Wink Data Center Campus

Partially operational Under construction

United States · 2 projects · Last reported

Summary

Cipher Black Pearl data center

Cipher Digital (formerly Cipher Mining) facility on about 75 company-owned acres near Wink, Texas, with 300 MW of approved ERCOT interconnection. Cipher began bitcoin mining there in June 2025, signed a 15-year lease with Amazon Web Services for about 300 gross MW of turnkey data center capacity, which it valued at about USD 5.5 billion, and stopped mining in February 2026. Cipher said it delivered the first data center capacity and rent began in August 2026, two months ahead of the original schedule, while the remaining phase I halls were in fit-out and phase II was still being built.

Source record as of 2026-08-04 · Details and sources

Cipher Digital Black Pearl Phase II Current Build

Cipher reports Black Pearl Phase II concrete foundations, building steel and underground electrical in progress while remaining Phase I halls undergo fit-out. evidence

Cipher Digital Inc. · published 2026-08-04T11:00:00Z

Location

The interactive map needs JavaScript. Display anchor: 31.69132, -103.06700 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (2)

Cipher Black Pearl data center

Partially operational last observed as of · Reported status

Location: Wink, Winkler County, Texas, US. Filings place the facility in or near Wink but give no street address. Coordinates are the Wink town point from its Wikipedia article, which also gives the county. Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR; Cipher Mining Inc. via SEC EDGAR; Wikipedia

Use: Ai unspecified, Hpc, Crypto mining

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacityabout 300 MWContracted · Campus · Unspecified2026-02-24Gross turnkey data center capacity leased to AWS, per the 10-K; the November 2025 release gives 300 MW. Cipher does not separate IT and facility load.Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR; Cipher Mining Inc. via SEC EDGAR
Power capacity300 MWPermitted · Campus · Grid connection2026-02-24Approved interconnection capacity on the ERCOT grid.Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR
Power capacity150 MWOperational · Phase · Unspecified · Former bitcoin mining operation (2025 to February 2026)2025-09Mining capacity reached by September 2025; mining stopped in February 2026 for the AWS conversion.Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR
Land areaabout 75 acresAcquired · Campus2026-02-24Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR

Companies and organizations

NameRoleNotesSources
Cipher Digital (formerly Cipher Mining)DeveloperFormerly Cipher Mining; develops the site through wholly owned subsidiaries Cipher Black Pearl LLC and Black Pearl Compute LLC.Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR; Cipher Digital Inc. via SEC EDGAR; Cipher Mining Inc. via SEC EDGAR
Cipher Digital (formerly Cipher Mining)OwnerThe land is owned by a wholly owned Cipher subsidiary and the facility is described as wholly owned.Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR
Amazon Web ServicesTenantNamed as the Black Pearl lessee only in the 10-K (s1), which dates the 15-year lease of about 300 gross MW to both October and November 2025. The November 2025 release (s2) announces the AWS lease without naming the site, and the August 2026 updates refer to an unnamed investment-grade hyperscale tenant.Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR; Cipher Mining Inc. via SEC EDGAR
Quanta ServicesBuilderCipher names Quanta as an engineering, construction and procurement partner for sites such as Black Pearl.Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR

Timeline

DateEventActual or plannedNotesSources
2025-06First operationalActualBitcoin mining began at the site; this predates the AI/HPC conversion.Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR
2025Construction startedActualRetrofit and development of the 300 MW data center began in 2025.Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR
2025-11-03AnnouncedActualCipher announced the 15-year, roughly USD 5.5 billion AWS lease for 300 MW, without naming the site in the release.Cipher Mining Inc. via SEC EDGAR
2026-02OtherActualBitcoin mining at the site ceased, and the USD 2.0 billion Black Pearl notes offering closed on 2026-02-11.Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR; Cipher Mining Inc. via SEC EDGAR
2026-08OtherActualFirst data center capacity delivered to the tenant and rent began, about two months ahead of the original schedule after a lease amendment.Cipher Digital Inc. via SEC EDGAR; Cipher Digital Inc. via SEC EDGAR
2027-Q1Fully operationalPlannedRent was expected to fully ramp by Q1 2027 when the final subphase is complete.Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR

Power supply

TypeDescriptionSources
GridApproved for 300 MW of interconnection and set up to take part in the ERCOT market.Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR

The 10-K is the only source opened that names AWS as the Black Pearl lessee; the August 2026 releases refer to an unnamed investment-grade hyperscale tenant. Delivery moved forward: the 10-K targeted first rent by Q4 2026, and an amended lease brought first delivery to August 2026. In February 2026 subsidiary Black Pearl Compute LLC issued USD 2.0 billion of senior secured notes to fund the remaining facility cost, repay about USD 232.5 million of Cipher equity and fund reserves and fees; this is debt financing, not a disclosed project cost. The crypto_mining tag reflects the former 2025 mining use only.

Sources for these details
Companies
  • Developer: Cipher Digital (formerly Cipher Mining) (unknown scope) evidence
  • Developer: Cipher Digital (formerly Cipher Mining) (unknown scope) evidence
  • Developer: Cipher Digital (formerly Cipher Mining) (unknown scope) evidence
  • Owner: Cipher Digital (formerly Cipher Mining) (unknown scope) evidence
  • Tenant: Amazon Web Services (unknown scope) evidence
  • Tenant: Amazon Web Services (unknown scope) evidence
  • Builder: Quanta Services (unknown scope) evidence
Source and location review
Status source
Cipher Digital Provides Second Quarter 2026 Business Update (Form 8-K Exhibit 99.1) evidence row
Cipher Digital Inc. via SEC EDGAR · published 2026-08-04 · Regulatory filing
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 84 days before the data update on 2026-10-27

Cipher Digital Black Pearl Phase II Current Build

Under construction last observed as of · Authoritative status update

Source and location review
Status source
Cipher August 4 business update: Black Pearl Phase II foundations, steel and underground electrical in progress evidence row
Cipher Digital Inc. · published 2026-08-04T11:00:00Z · Company disclosure
Locator
Campus locator · Official source · official_address_point_for_campus_site_address evidence
Source checks

Not reviewed against imagery not_reviewed_for_core_preview
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 84 days before the data update on 2026-10-27

Location details
Coordinates
31.69132, -103.06700
Geometry licence
public-use-as-is
Use scope
Campus locator
Scope class
official_address_point_for_campus_site_address
Authority
Official source
Source entity
Campus
Method
TxGIO_StratMap_address_point_query_by_full_addr_and_county_outSR4326_round7
Derivation
official_9_1_1_address_point_for_exact_primary_site_address
Precision scope
The official statewide 9-1-1 address point for the exact site address named by primary identity sources. It locates the campus address, not a data hall, phase, parcel boundary, footprint or current work extent. Source value rounded to seven decimals.
Horizontal uncertainty
Not reported

TxGIO states that each authoritative 9-1-1 source applies its own point-placement guideline and policy (rooftop, parcel centroid or street centreline are not fixed) and publishes no positional accuracy for individual points.

Geometry evidence
322acf52 eb0bee76

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Cipher Digital Black Pearl Wink Data Center Campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Cipher annual report on Form 10-K for fiscal year 2025
Archived copy
Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR
Regulatory filing
Imported: Geometry, Imported: Record, Metric: Land Area, Metric: Power Capacity, Milestone: Construction Started, Milestone: First Operational, Milestone: Fully Operational, Milestone: Other, Power Source: Grid, Role: Builder, Role: Developer, Owner claim, Tenant claimsource-terms-not-recordedCipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR3345385ab5f43f3ec15a4408533e1a594fce548ad159cc17f243022c7faf2a05
Factual source record; not the publisher page
Cipher August 4 business update: Black Pearl Phase II foundations, steel and underground electrical in progress
Archived copy
Cipher Digital Inc.
Company disclosure
Geometry identity context, Site distinctness context, Physical statusall-rights-reservedCipher Digital Inc., via GlobeNewswiree11b4a4092c3d7844d87a421aa1129dd1b18fd4fec50590a8630205a730a05bc
Retained source material; see source provenance
Cipher Digital business update presentation (Form 8-K Exhibit 99.2)
Archived copy
Cipher Digital Inc. via SEC EDGAR
Regulatory filing
Imported: Record, Imported: Status, Milestone: Othersource-terms-not-recordedCipher Digital Inc. via SEC EDGARabbad20274aa08e0352963462e6c43b2b7a483e2120b7f170f4fcef87547c777
Factual source record; not the publisher page
Cipher Digital Provides Second Quarter 2026 Business Update (Form 8-K Exhibit 99.1)
Archived copy
Cipher Digital Inc. via SEC EDGAR
Regulatory filing
Imported: Record, Imported: Status, Milestone: Other, Role: Developersource-terms-not-recordedCipher Digital Inc. via SEC EDGAR91ff60239ad8e44807502249ceaaf6ce63c03c60f913cdd5636dc35746a60dd8
Factual source record; not the publisher page
Cipher Mining Form 8-K: Black Pearl Compute LLC 6.125% senior secured notes due 2031
Archived copy
Cipher Mining Inc. via SEC EDGAR
Regulatory filing
Imported: Geometry, Imported: Record, Milestone: Other, Role: Developersource-terms-not-recordedCipher Mining Inc. via SEC EDGAR8983fc0ad42d0de8cc430ca5b4ead85f2187236dfc2b93645e3ba0c1e6818bb6
Factual source record; not the publisher page
Cipher Mining provides third quarter 2025 business update (Form 8-K, Exhibit 99.1)
Archived copy
Cipher Mining Inc. via SEC EDGAR
Regulatory filing
Imported: Record, Metric: Power Capacity, Milestone: Announced, Tenant claimsource-terms-not-recordedCipher Mining Inc. via SEC EDGAR5426b595657fc8b3440d8e0bfb2007b4f2e4e8463c42ac4a6802a78391f3cfce
Factual source record; not the publisher page
Cipher Q2 2026 Form 10-Q: 300 MW Black Pearl Facility in Wink, Texas
Archived copy
Cipher Digital Inc.
Company disclosure
Geometry identity context, Site distinctness contextnot statedpublic-sec-filingCipher Digital Inc. Form 10-Q, as mirrored on its investor-relations site41fc2a034a9ac18d2f8602d47d9aacf811de4ff99ebfdb8fa5aab34a7383a24d
Retained source material; see source provenance
TCEQ Central Registry RN112175997 'BLACK PEARL DATA CENTER' at 11786 CR 209, Wink
Archived copy
Texas Commission on Environmental Quality
Government record
Geometry identity context, Site distinctness contextnot statedpublic-record-as-isTexas Commission on Environmental Quality6a51d87ad394c48377b1911ad3b17f7d53b2503a08f2b308b83b444ba16e302f
Retained source material; see source provenance
TxGIO StratMap 9-1-1 address point: 11786 COUNTY ROAD 209, Winkler County
Archived copy
Texas Geographic Information Office (TxGIO), Texas Water Development Board
Government record
Site distinctness context, Geometrynot statedpublic-use-as-isTexas Geographic Information Office, StratMap Address Points; 9-1-1 source authority CSEC4553fd4858e5e6662a252e22433323fc2af68368201a5afb9eeca32d81dcd2ba
Retained source material; see source provenance
TxGIO StratMap address point in native Web Mercator: 11786 COUNTY ROAD 209
Archived copy
Texas Geographic Information Office (TxGIO), Texas Water Development Board
Government record
Site distinctness context, Geometrynot statedpublic-use-as-isTexas Geographic Information Office, StratMap Address Points; 9-1-1 source authority CSEC9d4af87af48e3fe87275465e74ba89d2b2f062086f756823805ce3f7861c34be
Retained source material; see source provenance
Wink, Texas
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipediafa3852848b65ffbf7f7b0414cffe0ecfac86cc762e76bc12f27233278f948413
Factual source record; not the publisher page