New Era Energy & Digital, Inc. (Nasdaq: NUAI) announced on 21 September 2026 that its subsidiary TCDC PowerCo LLC had signed a 20-year power purchase agreement with Luminant ET Services Company LLC, a Vistra affiliate, for a minimum of 200 MW and up to 207 MW for Phase 1 of its Texas Critical Data Center (TCDC) project, supplied from Vistra's 1,180 MW gas-fired generating facility in Odessa, which the release says is immediately adjacent to the TCDC site; power is expected in Q3 2027 (a forecast). The release describes TCDC as a 493-acre Permian Basin site planned to scale to 1.4 GW and says the land is secured and construction permits are in hand. This records the named Phase 1 project as announced on 21 September 2026. The county permits are not identified by number, date or approved scope, so permitted status is not asserted; no site grading, building construction, tenant, completion or operation is established, and the PPA megawatts are contracted power supply, not IT load. evidence

New Era Energy & Digital, Inc. · published 2026-09-21

Location

The interactive map needs JavaScript. Display anchor: 31.83504, -102.30498 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (1)

Texas Critical Data Centers (TCDC) Phase 1 — planned AI data-centre phase of about 200 MW (20-year Vistra PPA)

Announced last observed as of · Project announcement

Release datelined Midland, Texas, 14 August 2026: construction permits for Texas Critical Data Centers LLC ('TCDC') are 'now in hand'. Listed highlights: received Development Structure and Drive Approach Permits from Ector County; submitted the Phase 1 plat to Ector County and the City of Odessa; received approval of a Notice of Intent with the TCEQ to commence grading and 'intend to begin site grading in the coming weeks'; closed the 54-acre corridor acquisition, so the campus 'now stands at 493 acres'; removed 22 abandoned pipelines across 12 rights-of-way; a final surface waiver is pending from one leasehold operator. A Thunderhead Energy Solutions subsidiary (Phase 2 power partner) filed a TCEQ standard air permit application that would support about 550 MW of Phase 2 capacity (about 757 MW gross for Phases 1 and 2 together); end-tenant negotiations and joint-venture discussions with Stream Data Centers are ongoing. evidence

New Era Energy & Digital, Inc. · published 2026-08-14

New Era's location page for Texas Critical Data Centers ('Permian Basin Flagship', nearest hub Midland, TX) gives a 493-acre site designed for phased development to 1.4+ GW, 'located adjacent to existing generation sources', with Phase 1 (200 MW), Phase 2 (+450 MW) and Phase 3 (+750 MW) and a full-campus target of 1.4+ GW; primary power firm natural gas, backup diesel and battery. evidence

New Era Energy & Digital, Inc. · publication date not stated

One tile of this fragment's Ector County owner sweep (identify without geometry, 420 results): it independently lists the same three parcels owned by TEXAS CRITICAL DATA CENTERS LLC (47010.00020.00000, 46960.00010.00000, 42030.00040.00000). A sweep of 0.05-degree tiles (each tile that reached the 2,000-result limit subdivided into sixteen 0.0125-degree tiles, none of which reached it) across Ector County from -102.85 to -102.15 and 31.60 to 32.15 found no other parcel owned by Texas Critical Data Centers, New Era or Sharon AI entities (a 0.141-acre Midland residential lot owned by 'New Era Land Services LLC' is unrelated). evidence

Texas Geographic Information Office (TxGIO) · publication date not stated

The TABS search for Ector County (LocationCounty 2068) registrations dated 1 August to 26 October 2026 returns 19 projects (retail, clinics, offices, road and school work); none is a data-centre building and none names Texas Critical Data Centers, TCDC or New Era. evidence

Texas Department of Licensing and Regulation · publication date not stated

The 2026 press-release list (25 items, newest first) runs from 16 January to 21 September 2026; the newest item is the 21 September Vistra PPA release, and no later release reports site grading, construction start, a tenant, completion or operation at TCDC. Earlier items include the 16 January closing of New Era's acquisition of the remaining 50% of TCDC from Sharon AI and the 1 April partnership with Stream Data Centers. evidence

New Era Energy & Digital, Inc. · publication date not stated

Companies
  • Owner: Texas Critical Data Centers LLC (current) evidence
  • Owner: New Era Energy & Digital, Inc. (current) evidence
Source and location review
Status source
New Era Energy & Digital Secures 20-Year, 207 MW PPA with Vistra (press release, 21 September 2026; New Era investor-relations press-release feed) evidence row
New Era Energy & Digital, Inc. · published 2026-09-21 · Company disclosure
Locator
Campus locator · Official source · official_tax_parcel_union_centroid evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 36 days before the data update on 2026-10-27

Location details
Coordinates
31.83504, -102.30498
Geometry licence
public-use-as-is
Use scope
Campus locator
Scope class
official_tax_parcel_union_centroid
Authority
Official source
Source entity
Campus
Method
official_statewide_parcel_service_parcel_union_centroid_epsg3083
Derivation
direct_geometry
Precision scope
Centroid of the union of the three contiguous Ector County parcels owned by Texas Critical Data Centers LLC in the TxGIO StratMap parcel service (Ector Appraisal District, tax year 2026): 47010.00020.00000 (235-acre tract), 46960.00010.00000 (two account records sharing one polygon, legal areas 80 and 205.13 acres) and 42030.00040.00000 (54.456-acre corridor). The union is 403.922 geodesic acres, about 1.99 km east-west by 1.61 km north-south, and the centroid lies inside it. It locates the TCDC landholding (campus), not the Phase 1 buildings, a footprint or a construction extent; the company's stated 493 acres may extend beyond the mapped parcels, which is not asserted.
Horizontal uncertainty
Not reported

Appraisal-district parcels carry no published positional accuracy; the centroid represents a 404-acre landholding whose vertices lie up to 1.18 km away, and the positions of the Phase 1 buildings are not published.

Geometry evidence
1aa391a1

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Texas Critical Data Centers (TCDC) campus, Ector County (Odessa)
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
New Era Energy & Digital Files Q2 2026 Form 10-Q and Announces TCDC Construction Permits (press release, 14 August 2026; New Era investor-relations press-release feed)
Archived copy
New Era Energy & Digital, Inc.
Company disclosure
Site and project identityall-rights-reservedNew Era Energy & Digital, Inc.1467daaae9169fbe48b18d9fb5d516df2b1d99bf8463c553fb7a1a3f51808d5c
Retained source material; see source provenance
New Era Energy & Digital investor-relations press-release feed: 2026 headlines
Archived copy
New Era Energy & Digital, Inc.
Company disclosure
Site and project identitynot statedall-rights-reservedNew Era Energy & Digital, Inc.623e9deb34cfe45943caca5c6ebe62fc05c1070ec4de6c526f98479e78872f49
Retained source material; see source provenance
New Era Energy & Digital Secures 20-Year, 207 MW PPA with Vistra (press release, 21 September 2026; New Era investor-relations press-release feed)
Archived copy
New Era Energy & Digital, Inc.
Company disclosure
Project announcement, Owner claimall-rights-reservedNew Era Energy & Digital, Inc.634840d24a5606b93e107756976f19055c4ea8fcf1f6ba5706cc86d76ce76b3a
Retained source material; see source provenance
TDLR TABS project search: Ector County registrations, 1 August to 26 October 2026
Archived copy
Texas Department of Licensing and Regulation
Regulatory filing
Site and project identitynot statedpublic-record-source-termsTexas Department of Licensing and Regulationd9001b4fe09ca4da5cf069fdcf60545beb93b782d85f87786e84f385e47001d7
Retained source material; see source provenance
Texas Critical Data Centers (New Era location page)
Archived copy
New Era Energy & Digital, Inc.
Operator website
Site and project identitynot statedall-rights-reservedNew Era Energy & Digital, Inc.741c71d111c7cf5ad588fa12bc34e54efdd2bed72b5fbe42c154279ef6712f38
Retained source material; see source provenance
TxGIO StratMap Land Parcels: Ector County parcels 47010.00020.00000, 46960.00010.00000 and 42030.00040.00000 (owner Texas Critical Data Centers LLC), southeast Odessa
Archived copy
Texas Geographic Information Office (TxGIO)
Government record
Geometry, Owner claimnot statedpublic-use-as-isTexas Geographic Information Office, StratMap Land Parcels (Ector Appraisal District data)f3acce6445a7273d961a9fde2c87c045873670f3f54ec77994aaf892f609ce8a
Retained source material; see source provenance
TxGIO StratMap Land Parcels: identify sweep tile -102.30..-102.25, 31.80..31.85 (Ector County)
Archived copy
Texas Geographic Information Office (TxGIO)
Government record
Site and project identitynot statedpublic-use-as-isTexas Geographic Information Office, StratMap Land Parcels (Ector Appraisal District data)7cefe6cf28be1dfabc67da0d91b200ac2fbc592f3eddc4d5c31ec17c16fe2be8
Retained source material; see source provenance
Cite this site

Kyars, K. (2026). Texas Critical Data Centers (TCDC) campus, Ector County (Odessa) [site vcc-site-49244be6634ceff5f4e2]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-49244be6634ceff5f4e2/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction