Summary
Hut 8 River Bend 245 MW Critical IT Current Build
The August 4 update identifies active construction at River Bend. Its project-specific progress includes vertical works and continued substation construction; first data-hall delivery remains a 2027 forecast. evidence
Hut 8 Corp. · published 2026-08-04
Hut 8 River Bend AI data center campus
AI data center campus under construction by Hut 8 in West Feliciana Parish, Louisiana. Phase I is leased to Fluidstack for 245 MW of critical IT load under a 15-year lease valued at $7.0 billion, with Google backstopping the lease obligations; Hut 8 announced a partnership with Anthropic and Fluidstack the same day, and news reports say the capacity is for Anthropic. Entergy Louisiana is to supply an initial 330 MW, with potential to scale to 1,000 MW. Phase I investment is up to $10 billion. Local reporting in October 2026 counted about 1,200 construction workers on site and said the facility will serve Anthropic's Claude.
Source record as of 2026-10-05 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 30.72789, -91.29951 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Campus reference; individual project footprints are not mapped.
Projects (2)
Hut 8 River Bend 245 MW Critical IT Current Build
Under construction last observed as of · Authoritative status update
Source and location review
- Status source
- Hut 8 August 4 River Bend physical construction update evidence row
Hut 8 Corp. · published 2026-08-04 · Company disclosure - Locator
- Campus locator · Official source · operator_published_campus_reference_point evidence
- Source checks
Not reviewed against imagery not_
reviewed_ for_ core_ preview
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 84 days before the data update on 2026-10-27
Hut 8 River Bend AI data center campus
Under construction last observed as of · Reported status
Location: West Feliciana Parish, Louisiana, US. Parish coordinates from Wikipedia; the sources name the parish but not a street address or town. Expansion Solutions Magazine; T&D World; WAFB; Wikipedia
Use: Ai training, Ai inference
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | 245 MW | Contracted · Phase · It load · Phase I (Fluidstack lease) | 2025-12-17 | Hut 8; T&D World | |
| Power capacity | 330 MW | Planned · Phase · Grid connection · Phase I | 2025-12-17 | Initial utility capacity from Entergy Louisiana. | Expansion Solutions Magazine; T&D World |
| Power capacity | up to 1,000 MW | Planned · Campus · Grid connection | 2025-12-17 | Announcement materials say the campus could scale to 1,000 MW of utility capacity; Hut 8's August 2026 results describe 1,000 MW of potential expansion capacity at River Bend subject to added power. | Expansion Solutions Magazine; T&D World; Hut 8 |
| Power capacity | up to 2,295 MW | Planned · Campus · Unspecified | 2025-12-17 | Motley Fool says Hut 8 and Fluidstack could deliver as much as 2,295 MW of AI data center infrastructure to Anthropic at River Bend. This exceeds the 1,000 MW utility scale-up cited by other sources, and Hut 8 material that could be read does not state it. | The Motley Fool (via Yahoo Finance) |
| Investment | up to 10,000,000,000 USD | Announced · Phase · Phase I | 2025-12-17 | Expansion Solutions Magazine; T&D World | |
| Jobs construction | about 1,000 count | Planned · Phase · Phase I peak | 2025-12-17 | Expansion Solutions Magazine; T&D World | |
| Jobs construction | 1,200 count | Reported · Campus | 2026-10-05 | Construction workers reported on site in October 2026. | WAFB |
| Jobs permanent | at least 75 count | Planned · Phase · Phase I | 2025-12-17 | Expansion Solutions Magazine; T&D World |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| Hut 8 | Developer | Hut 8; Expansion Solutions Magazine; T&D World | |
| Fluidstack | Tenant | Phase I tenant for 245 MW of critical IT load; holds a right of first offer on expansion capacity. | Expansion Solutions Magazine; T&D World; Hut 8 |
| Anthropic | Tenant | Reported end user of the capacity leased to Fluidstack: the Motley Fool says the infrastructure will be delivered to Anthropic and WAFB says the facility will serve Claude. Hut 8's release headline announces a partnership with Anthropic and Fluidstack, but its text could not be read, so Anthropic's role at River Bend is not confirmed by the companies in the sources reviewed. | Hut 8; The Motley Fool (via Yahoo Finance); WAFB |
| Entergy Louisiana | Utility | Expansion Solutions Magazine; T&D World | |
| Louisiana Economic Development | Government | Its secretary was quoted in the announcement and it estimated the indirect jobs; Hut 8 is expected to use the state sales and use tax rebate on data center equipment and the Quality Jobs program. | Expansion Solutions Magazine |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2025-12-17 | Announced | Actual | Hut 8; Expansion Solutions Magazine | |
| 2027-Q2 | First operational | Planned | Target at announcement; WAFB reported in October 2026 that the facility is expected to be operational by the end of 2027. | Expansion Solutions Magazine; T&D World; WAFB |
Power supply
| Type | Description | Sources |
|---|---|---|
| Grid | Entergy Louisiana is to supply an initial 330 MW, with possible growth to 1,000 MW; WAFB reports a new on-site substation being built with Entergy and funded by the company. | T&D World; WAFB |
Sources for these details
- Hut 8 Signs 15-Year, 245 MW AI Data Center Lease at River Bend Campus with Total Contract Value of $7.0 Billion — Hut 8; 2025-12-17
- Hut 8 Announces AI Infrastructure Partnership with Anthropic and Fluidstack — Hut 8; 2025-12-17
- Hut 8 Selects Southeast Louisiana for $10B AI Data Center Campus — Expansion Solutions Magazine; 2025-12-17
- Hut 8 Selects Entergy, Southeast Louisiana for $10 Billion Artificial Intelligence Data Center — T&D World; 2025-12-22 · Archived source
- Why Hut 8 Stock Popped Today — The Motley Fool (via Yahoo Finance); 2025-12-18
- Hut 8 Reports Second Quarter 2026 Results — Hut 8; 2026-08-04
- First Look: West Feliciana's data center — WAFB; 2026-10-05 · Archived source
- West Feliciana Parish, Louisiana — Wikipedia; publication date not stated
- Companies
- Developer: Hut 8 (unknown scope) evidence
- Developer: Hut 8 (unknown scope) evidence
- Developer: Hut 8 (unknown scope) evidence
- Tenant: Fluidstack (unknown scope) evidence
- Tenant: Fluidstack (unknown scope) evidence
- Tenant: Fluidstack (unknown scope) evidence
- Tenant: Anthropic (unknown scope) evidence
- Tenant: Anthropic (unknown scope) evidence
- Tenant: Anthropic (unknown scope) evidence
- Utility: Entergy Louisiana (unknown scope) evidence
- Utility: Entergy Louisiana (unknown scope) evidence
- Government: Louisiana Economic Development (unknown scope) evidence
Source and location review
- Status source
- First Look: West Feliciana's data center evidence row
WAFB · published 2026-10-05 · News - Locator
- County or district reference only · Compiled location reference · admin2 evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 22 days before the data update on 2026-10-27
Location details
- Coordinates
- 30.72789, -91.29951
- Geometry licence
- IETF-Trust-Legal-Provisions, all-rights-reserved
- Use scope
- Campus locator
- Scope class
- operator_published_campus_reference_point
- Authority
- Official source
- Source entity
- Campus
- Method
- operator_published_mapbox_campus_marker
- Derivation
- Match direct campus page to the platform's same title and slug; dereference explicit geolocation fields; reproduce the site's six-decimal marker rounding; emit longitude then latitude.
- Precision scope
- Exact operator-rendered named campus marker, not a survey, campus boundary, building centroid, construction footprint, or phase-specific location.
- Horizontal uncertainty
Not reported
Publisher reports no bounded horizontal positional accuracy; decimal places and deterministic rounding do not establish site accuracy.
- Geometry evidence
- 111e4ef0 649edbaf 688470de 873a0c1d ebef4446
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| First Look: West Feliciana's data center Archived copy | WAFB News | Imported: Geometry, Imported: Record, Imported: Status, Metric: Jobs Construction, Milestone: First Operational, Power Source: Grid, Tenant claim | source-terms-not-recorded | WAFB | 860502fddd7fbb6b04e926d3d4b788aaa41448bbf993dc2704e2c56391ce28b7Factual source record; not the publisher page | ||
| Hut 8 Announces AI Infrastructure Partnership with Anthropic and Fluidstack Archived copy | Hut 8 Company disclosure | Imported: Record, Tenant claim | source-terms-not-recorded | Hut 8 | b5a571ab567ec918bff617162e7b2326965e984e087aac30082ba2e951345fd0Factual source record; not the publisher page | ||
| Hut 8 August 4 River Bend physical construction update Archived copy | Hut 8 Corp. Company disclosure | Geometry identity context, Site distinctness context, Physical status | all-rights-reserved | Hut 8 Corp. | 5dd5a6ba19bde75372b8a39ab725d97fbd8429e8369a7f1d14ad47942c3e1b58Retained source material; see source provenance | ||
| Hut 8 frontend named marker derivation Archived copy | Hut 8 Corp. Company disclosure | Site distinctness context, Geometry | not stated | all-rights-reserved | Hut 8 Corp. | 832b2a3b34eb077b91faeb7bd5d3575f884ab65d1544dfa8d741bd78f29a4d8eRetained source material; see source provenance | |
| Hut 8 platform list binds named campuses to map locations Archived copy | Hut 8 Corp. Company disclosure | Geometry identity context, Site distinctness context, Geometry | not stated | all-rights-reserved | Hut 8 Corp. | 90ed067c4fb5f3998d9528e70a84ab1b6c24414084a00c42abfa432c855a3a19Retained source material; see source provenance | |
| Hut 8 Reports Second Quarter 2026 Results Archived copy | Hut 8 Company disclosure | Imported: Record, Metric: Power Capacity, Tenant claim | source-terms-not-recorded | Hut 8 | f45ef6f66258b70bf676285c3dec2478a1ae555c5ea3dac72d705a5a6e64eb22Factual source record; not the publisher page | ||
| Hut 8 Selects Entergy, Southeast Louisiana for $10 Billion Artificial Intelligence Data Center Archived copy | T&D World Trade publication | Imported: Geometry, Imported: Record, Imported: Status, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Metric: Power Capacity, Milestone: First Operational, Power Source: Grid, Role: Developer, Tenant claim, Role: Utility | source-terms-not-recorded | T&D World | 168304e37d4bc5305e06d8a1df08da956015d4bd54d6f0f25c5c398966d37b49Factual source record; not the publisher page | ||
| Hut 8 Selects Southeast Louisiana for $10B AI Data Center Campus Archived copy | Expansion Solutions Magazine Trade publication | Imported: Geometry, Imported: Record, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Metric: Power Capacity, Milestone: Announced, Milestone: First Operational, Role: Developer, Role: Government, Tenant claim, Role: Utility | source-terms-not-recorded | Expansion Solutions Magazine | 927e7678142ee9936dd846b6ddb4354aec385f4c71719b285d0e53e646b95f4fFactual source record; not the publisher page | ||
| Hut 8 Signs 15-Year, 245 MW AI Data Center Lease at River Bend Campus with Total Contract Value of $7.0 Billion Archived copy | Hut 8 Company disclosure | Imported: Record, Metric: Power Capacity, Milestone: Announced, Role: Developer | source-terms-not-recorded | Hut 8 | c876fc1fb02d7cc5c17fa5313806a921e77c266c13bcd9c851b0afca221bb7fcFactual source record; not the publisher page | ||
| Hut 8 website rights notice Archived copy | Hut 8 Corp. Company disclosure | Geometry identity context, Site distinctness context | not stated | all-rights-reserved | Hut 8 Corp. | baa8e25485074c69867e1eb23cff4111b0c36a3908b332ae1134644331b03549Retained source material; see source provenance | |
| Mapbox LngLat geographic coordinate contract Archived copy | Mapbox Company disclosure | Site distinctness context, Geometry | not stated | all-rights-reserved | Mapbox | 65696f2eadafcb1d2e7fc7e9f7c85bb923c0a3f428fb204047e0912890312cc0Retained source material; see source provenance | |
| RFC 7946 GeoJSON coordinate reference system Archived copy | IETF Trust Company disclosure | Site distinctness context, Geometry | not stated | IETF-Trust-Legal-Provisions | IETF Trust | bcaa061faa3f2f3eec2a5846b01e6986a6aacf7fa64c2e88f74fb02d260a1adfRetained source material; see source provenance | |
| River Bend named operator record and coordinate Archived copy | Hut 8 Corp. Company disclosure | Geometry identity context, Site distinctness context, Geometry | not stated | all-rights-reserved | Hut 8 Corp. | 7ad7e581a19a08906a59e4d784587bd390cd0a620dc3d0566ddd0c5f905a529fRetained source material; see source provenance | |
| West Feliciana Parish, Louisiana Archived copy | Wikipedia Other | Imported: Geometry, Imported: Record | not stated | source-terms-not-recorded | Wikipedia | f577e81859fca1b74f4e8ffd78f372da57af97313de6adc41e28acc45487d443Factual source record; not the publisher page | |
| Why Hut 8 Stock Popped Today Archived copy | The Motley Fool (via Yahoo Finance) News | Imported: Record, Metric: Power Capacity, Tenant claim | source-terms-not-recorded | The Motley Fool (via Yahoo Finance) | f18e6994df4c9dd95659076a2175ab6f68e68bc2930f1fcc8d668baa435c3e7fFactual source record; not the publisher page |
Cite this site
Kyars, K. (2026). Hut 8 River Bend AI Data Center Campus [site vcc-site-1f215e81ecc04c69b5d6]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1f215e81ecc04c69b5d6/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction