Hut 8 River Bend AI Data Center Campus

Under construction

United States · 2 projects · Last reported

Summary

Hut 8 River Bend 245 MW Critical IT Current Build

The August 4 update identifies active construction at River Bend. Its project-specific progress includes vertical works and continued substation construction; first data-hall delivery remains a 2027 forecast. evidence

Hut 8 Corp. · published 2026-08-04

Hut 8 River Bend AI data center campus

AI data center campus under construction by Hut 8 in West Feliciana Parish, Louisiana. Phase I is leased to Fluidstack for 245 MW of critical IT load under a 15-year lease valued at $7.0 billion, with Google backstopping the lease obligations; Hut 8 announced a partnership with Anthropic and Fluidstack the same day, and news reports say the capacity is for Anthropic. Entergy Louisiana is to supply an initial 330 MW, with potential to scale to 1,000 MW. Phase I investment is up to $10 billion. Local reporting in October 2026 counted about 1,200 construction workers on site and said the facility will serve Anthropic's Claude.

Source record as of 2026-10-05 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 30.72789, -91.29951 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (2)

Hut 8 River Bend 245 MW Critical IT Current Build

Under construction last observed as of · Authoritative status update

Source and location review
Status source
Hut 8 August 4 River Bend physical construction update evidence row
Hut 8 Corp. · published 2026-08-04 · Company disclosure
Locator
Campus locator · Official source · operator_published_campus_reference_point evidence
Source checks

Not reviewed against imagery not_reviewed_for_core_preview
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 84 days before the data update on 2026-10-27

Hut 8 River Bend AI data center campus

Under construction last observed as of · Reported status

Location: West Feliciana Parish, Louisiana, US. Parish coordinates from Wikipedia; the sources name the parish but not a street address or town. Expansion Solutions Magazine; T&D World; WAFB; Wikipedia

Use: Ai training, Ai inference

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity245 MWContracted · Phase · It load · Phase I (Fluidstack lease)2025-12-17Hut 8; T&D World
Power capacity330 MWPlanned · Phase · Grid connection · Phase I2025-12-17Initial utility capacity from Entergy Louisiana.Expansion Solutions Magazine; T&D World
Power capacityup to 1,000 MWPlanned · Campus · Grid connection2025-12-17Announcement materials say the campus could scale to 1,000 MW of utility capacity; Hut 8's August 2026 results describe 1,000 MW of potential expansion capacity at River Bend subject to added power.Expansion Solutions Magazine; T&D World; Hut 8
Power capacityup to 2,295 MWPlanned · Campus · Unspecified2025-12-17Motley Fool says Hut 8 and Fluidstack could deliver as much as 2,295 MW of AI data center infrastructure to Anthropic at River Bend. This exceeds the 1,000 MW utility scale-up cited by other sources, and Hut 8 material that could be read does not state it.The Motley Fool (via Yahoo Finance)
Investmentup to 10,000,000,000 USDAnnounced · Phase · Phase I2025-12-17Expansion Solutions Magazine; T&D World
Jobs constructionabout 1,000 countPlanned · Phase · Phase I peak2025-12-17Expansion Solutions Magazine; T&D World
Jobs construction1,200 countReported · Campus2026-10-05Construction workers reported on site in October 2026.WAFB
Jobs permanentat least 75 countPlanned · Phase · Phase I2025-12-17Expansion Solutions Magazine; T&D World

Companies and organizations

NameRoleNotesSources
Hut 8DeveloperHut 8; Expansion Solutions Magazine; T&D World
FluidstackTenantPhase I tenant for 245 MW of critical IT load; holds a right of first offer on expansion capacity.Expansion Solutions Magazine; T&D World; Hut 8
AnthropicTenantReported end user of the capacity leased to Fluidstack: the Motley Fool says the infrastructure will be delivered to Anthropic and WAFB says the facility will serve Claude. Hut 8's release headline announces a partnership with Anthropic and Fluidstack, but its text could not be read, so Anthropic's role at River Bend is not confirmed by the companies in the sources reviewed.Hut 8; The Motley Fool (via Yahoo Finance); WAFB
Entergy LouisianaUtilityExpansion Solutions Magazine; T&D World
Louisiana Economic DevelopmentGovernmentIts secretary was quoted in the announcement and it estimated the indirect jobs; Hut 8 is expected to use the state sales and use tax rebate on data center equipment and the Quality Jobs program.Expansion Solutions Magazine

Timeline

DateEventActual or plannedNotesSources
2025-12-17AnnouncedActualHut 8; Expansion Solutions Magazine
2027-Q2First operationalPlannedTarget at announcement; WAFB reported in October 2026 that the facility is expected to be operational by the end of 2027.Expansion Solutions Magazine; T&D World; WAFB

Power supply

TypeDescriptionSources
GridEntergy Louisiana is to supply an initial 330 MW, with possible growth to 1,000 MW; WAFB reports a new on-site substation being built with Entergy and funded by the company.T&D World; WAFB
Sources for these details
Companies
  • Developer: Hut 8 (unknown scope) evidence
  • Developer: Hut 8 (unknown scope) evidence
  • Developer: Hut 8 (unknown scope) evidence
  • Tenant: Fluidstack (unknown scope) evidence
  • Tenant: Fluidstack (unknown scope) evidence
  • Tenant: Fluidstack (unknown scope) evidence
  • Tenant: Anthropic (unknown scope) evidence
  • Tenant: Anthropic (unknown scope) evidence
  • Tenant: Anthropic (unknown scope) evidence
  • Utility: Entergy Louisiana (unknown scope) evidence
  • Utility: Entergy Louisiana (unknown scope) evidence
  • Government: Louisiana Economic Development (unknown scope) evidence
Source and location review
Status source
First Look: West Feliciana's data center evidence row
WAFB · published 2026-10-05 · News
Locator
County or district reference only · Compiled location reference · admin2 evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 22 days before the data update on 2026-10-27

Location details
Coordinates
30.72789, -91.29951
Geometry licence
IETF-Trust-Legal-Provisions, all-rights-reserved
Use scope
Campus locator
Scope class
operator_published_campus_reference_point
Authority
Official source
Source entity
Campus
Method
operator_published_mapbox_campus_marker
Derivation
Match direct campus page to the platform's same title and slug; dereference explicit geolocation fields; reproduce the site's six-decimal marker rounding; emit longitude then latitude.
Precision scope
Exact operator-rendered named campus marker, not a survey, campus boundary, building centroid, construction footprint, or phase-specific location.
Horizontal uncertainty
Not reported

Publisher reports no bounded horizontal positional accuracy; decimal places and deterministic rounding do not establish site accuracy.

Geometry evidence
111e4ef0 649edbaf 688470de 873a0c1d ebef4446

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Hut 8 River Bend AI Data Center Campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
First Look: West Feliciana's data center
Archived copy
WAFB
News
Imported: Geometry, Imported: Record, Imported: Status, Metric: Jobs Construction, Milestone: First Operational, Power Source: Grid, Tenant claimsource-terms-not-recordedWAFB860502fddd7fbb6b04e926d3d4b788aaa41448bbf993dc2704e2c56391ce28b7
Factual source record; not the publisher page
Hut 8 Announces AI Infrastructure Partnership with Anthropic and Fluidstack
Archived copy
Hut 8
Company disclosure
Imported: Record, Tenant claimsource-terms-not-recordedHut 8b5a571ab567ec918bff617162e7b2326965e984e087aac30082ba2e951345fd0
Factual source record; not the publisher page
Hut 8 August 4 River Bend physical construction update
Archived copy
Hut 8 Corp.
Company disclosure
Geometry identity context, Site distinctness context, Physical statusall-rights-reservedHut 8 Corp.5dd5a6ba19bde75372b8a39ab725d97fbd8429e8369a7f1d14ad47942c3e1b58
Retained source material; see source provenance
Hut 8 frontend named marker derivation
Archived copy
Hut 8 Corp.
Company disclosure
Site distinctness context, Geometrynot statedall-rights-reservedHut 8 Corp.832b2a3b34eb077b91faeb7bd5d3575f884ab65d1544dfa8d741bd78f29a4d8e
Retained source material; see source provenance
Hut 8 platform list binds named campuses to map locations
Archived copy
Hut 8 Corp.
Company disclosure
Geometry identity context, Site distinctness context, Geometrynot statedall-rights-reservedHut 8 Corp.90ed067c4fb5f3998d9528e70a84ab1b6c24414084a00c42abfa432c855a3a19
Retained source material; see source provenance
Hut 8 Reports Second Quarter 2026 Results
Archived copy
Hut 8
Company disclosure
Imported: Record, Metric: Power Capacity, Tenant claimsource-terms-not-recordedHut 8f45ef6f66258b70bf676285c3dec2478a1ae555c5ea3dac72d705a5a6e64eb22
Factual source record; not the publisher page
Hut 8 Selects Entergy, Southeast Louisiana for $10 Billion Artificial Intelligence Data Center
Archived copy
T&D World
Trade publication
Imported: Geometry, Imported: Record, Imported: Status, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Metric: Power Capacity, Milestone: First Operational, Power Source: Grid, Role: Developer, Tenant claim, Role: Utilitysource-terms-not-recordedT&D World168304e37d4bc5305e06d8a1df08da956015d4bd54d6f0f25c5c398966d37b49
Factual source record; not the publisher page
Hut 8 Selects Southeast Louisiana for $10B AI Data Center Campus
Archived copy
Expansion Solutions Magazine
Trade publication
Imported: Geometry, Imported: Record, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Metric: Power Capacity, Milestone: Announced, Milestone: First Operational, Role: Developer, Role: Government, Tenant claim, Role: Utilitysource-terms-not-recordedExpansion Solutions Magazine927e7678142ee9936dd846b6ddb4354aec385f4c71719b285d0e53e646b95f4f
Factual source record; not the publisher page
Hut 8 Signs 15-Year, 245 MW AI Data Center Lease at River Bend Campus with Total Contract Value of $7.0 Billion
Archived copy
Hut 8
Company disclosure
Imported: Record, Metric: Power Capacity, Milestone: Announced, Role: Developersource-terms-not-recordedHut 8c876fc1fb02d7cc5c17fa5313806a921e77c266c13bcd9c851b0afca221bb7fc
Factual source record; not the publisher page
Hut 8 website rights notice
Archived copy
Hut 8 Corp.
Company disclosure
Geometry identity context, Site distinctness contextnot statedall-rights-reservedHut 8 Corp.baa8e25485074c69867e1eb23cff4111b0c36a3908b332ae1134644331b03549
Retained source material; see source provenance
Mapbox LngLat geographic coordinate contract
Archived copy
Mapbox
Company disclosure
Site distinctness context, Geometrynot statedall-rights-reservedMapbox65696f2eadafcb1d2e7fc7e9f7c85bb923c0a3f428fb204047e0912890312cc0
Retained source material; see source provenance
RFC 7946 GeoJSON coordinate reference system
Archived copy
IETF Trust
Company disclosure
Site distinctness context, Geometrynot statedIETF-Trust-Legal-ProvisionsIETF Trustbcaa061faa3f2f3eec2a5846b01e6986a6aacf7fa64c2e88f74fb02d260a1adf
Retained source material; see source provenance
River Bend named operator record and coordinate
Archived copy
Hut 8 Corp.
Company disclosure
Geometry identity context, Site distinctness context, Geometrynot statedall-rights-reservedHut 8 Corp.7ad7e581a19a08906a59e4d784587bd390cd0a620dc3d0566ddd0c5f905a529f
Retained source material; see source provenance
West Feliciana Parish, Louisiana
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipediaf577e81859fca1b74f4e8ffd78f372da57af97313de6adc41e28acc45487d443
Factual source record; not the publisher page
Why Hut 8 Stock Popped Today
Archived copy
The Motley Fool (via Yahoo Finance)
News
Imported: Record, Metric: Power Capacity, Tenant claimsource-terms-not-recordedThe Motley Fool (via Yahoo Finance)f18e6994df4c9dd95659076a2175ab6f68e68bc2930f1fcc8d668baa435c3e7f
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Hut 8 River Bend AI Data Center Campus [site vcc-site-1f215e81ecc04c69b5d6]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1f215e81ecc04c69b5d6/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction