AWS Vicksburg data center campus

Announced

United States · 1 project · Last reported

Summary

Amazon announced in November 2025 that it would spend at least $3 billion on a new data center campus in Vicksburg, Warren County, with at least 200 full-time jobs. Officials said construction would start in 2026 and the local mayor expected a five-to-seven-year build-out. Amazon said the campus will support AI and cloud computing. Entergy Mississippi agreed to meet its long-term power needs and is building a gas plant at the former Baxter Wilson site to serve the campus and other industrial projects. The April 2026 statewide update still listed it as planned.

Source record as of 2026-04-09 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 32.35250, -90.87750 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

AWS Vicksburg data center campus

Announced last observed as of · Reported status

Location: Vicksburg, Warren County, Mississippi, US. No site, parcel or road has been published; coordinates are the Vicksburg city point from its Wikipedia article (Nominatim was unavailable). Office of Governor Tate Reeves; Mississippi Public Broadcasting

Use: Ai unspecified, Cloud

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Investmentat least 3,000,000,000 USDAnnounced · Campus2025-11-20Office of Governor Tate Reeves; Amazon
Jobs permanentat least 200 countPlanned · Campus2025-11-20Officials also project more than 300 additional positions in the wider county.Office of Governor Tate Reeves; Mississippi Public Broadcasting; Mississippi Free Press

Companies and organizations

NameRoleNotesSources
Amazon Web ServicesDeveloperOffice of Governor Tate Reeves; Amazon
Entergy MississippiUtilityOffice of Governor Tate Reeves; Mississippi Public Broadcasting
Warren CountyGovernmentThe county is contributing to the project; state incentives passed for the Madison County campuses also apply.Office of Governor Tate Reeves

Timeline

DateEventActual or plannedNotesSources
2025-11-20AnnouncedActualOffice of Governor Tate Reeves; Mississippi Free Press
2026Construction startedPlannedTarget year given at announcement; no source opened confirms that work has begun.Office of Governor Tate Reeves; Mississippi Public Broadcasting

Power supply

TypeDescriptionSources
GridEntergy Mississippi committed to the campus's long-term power needs and is building a roughly $1.2 billion gas-fired station at the retired Baxter Wilson plant site to serve this and other industrial load.Office of Governor Tate Reeves; Mississippi Public Broadcasting

The Vicksburg mayor described a five-to-seven-year build-out at the November 2025 announcement (Mississippi Public Broadcasting). The governor's release gives $3 billion while Amazon says at least $3 billion.

Sources for these details
Companies
  • Developer: Amazon Web Services (unknown scope) evidence
  • Developer: Amazon Web Services (unknown scope) evidence
  • Utility: Entergy Mississippi (unknown scope) evidence
  • Utility: Entergy Mississippi (unknown scope) evidence
  • Government: Warren County (unknown scope) evidence
Source and location review
Status source
Governor Tate Reeves announces Amazon plans to invest $3 billion in Vicksburg evidence row
Office of Governor Tate Reeves · published 2025-11-20 · Government record
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 201 days before the data update on 2026-10-27

Location details
Coordinates
32.35250, -90.87750
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
No site, parcel or road has been published; coordinates are the Vicksburg city point from its Wikipedia article (Nominatim was unavailable).
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
6323bbc2

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for AWS Vicksburg data center campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Amazon continues Mississippi expansion, announcing plans to invest a total of $25 billion across the Magnolia State
Archived copy
Office of Governor Tate Reeves
Government record
Imported: Record, Imported: Statussource-terms-not-recordedOffice of Governor Tate Reeves25e59dbb760c81e0c500b28f67a0bbf2e9c46d216b53125c390f9cfc9beea230
Factual source record; not the publisher page
Amazon plans to invest at least $3 billion in Warren County, Mississippi, for next-generation data center campus
Archived copy
Amazon
Company disclosure
Imported: Record, Metric: Investment, Role: Developernot statedsource-terms-not-recordedAmazon6bb54315180690e568dded3f483386d4fec05b4f1f65bce3e154b72dae800c21
Factual source record; not the publisher page
Amazon to build $3 billion data center in Warren County, expanding tech footprint in Mississippi
Archived copy
Mississippi Public Broadcasting
News
Imported: Geometry, Imported: Record, Metric: Jobs Permanent, Milestone: Construction Started, Power Source: Grid, Role: Utilitysource-terms-not-recordedMississippi Public Broadcasting64bb3bff3fbc6e49a0438dfb04f123b1d26256dd3613f16ca96be2bbeeaae6d9
Factual source record; not the publisher page
Amazon to Build $3B AI Data Center in Vicksburg, as Gov. Reeves Proclaims Arrival of the 'Digital Delta'
Archived copy
Mississippi Free Press
News
Imported: Record, Metric: Jobs Permanent, Milestone: Announcedsource-terms-not-recordedMississippi Free Press293ca8c6048dd8d8d6d8718932846bbf7c6cb99bd5f72d2f44165323ecaff686
Factual source record; not the publisher page
Governor Tate Reeves announces Amazon plans to invest $3 billion in Vicksburg
Archived copy
Office of Governor Tate Reeves
Government record
Imported: Geometry, Imported: Record, Imported: Status, Metric: Investment, Metric: Jobs Permanent, Milestone: Announced, Milestone: Construction Started, Power Source: Grid, Role: Developer, Role: Government, Role: Utilitysource-terms-not-recordedOffice of Governor Tate Reevesf954f67de9aa3047474b974568d8da996e3a1f119ddaa48fb3d1810a803d18fc
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). AWS Vicksburg data center campus [site vcc-site-ab1cba1760d42b280cd1]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ab1cba1760d42b280cd1/