Crusoe Abilene AI factory campus for Microsoft

Under construction

United States · 1 project · Last reported

Summary

Crusoe's second AI campus in Abilene, Texas, on Lancium-owned land adjacent to its first Abilene campus, announced in March 2026 to support large-scale AI workloads for Microsoft. The 900 MW site has two buildings, each designed for 336 MW of critical IT load, a 900 MW behind-the-meter on-site power plant paired with medium-voltage battery storage, and closed-loop, non-evaporative liquid cooling. Land clearing and site preparation were under way at announcement, Crusoe said in July 2026 that it was building the campus, and the first building is expected to be energized in mid-2027.

Source record as of 2026-07-15 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 32.45000, -99.75000 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Crusoe Abilene AI factory campus for Microsoft

Under construction last observed as of · Reported status

Location: Abilene, Texas, US. Crusoe places the campus in Abilene, adjacent to its existing campus, without an address. Coordinates are the Abilene city point from its Wikipedia article; the city spans Taylor and Jones counties, so no county is recorded. Crusoe; Crusoe; Wikipedia

Use: Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity900 MWPlanned · Campus · Unspecified2026-07-15Crusoe's headline size for the new site; it does not say whether this is IT or facility power.Crusoe; The Register; Crusoe
Power capacity336 MWPlanned · Phase · It load · Building 12026-03-27Each of the two buildings is designed to deliver 336 MW of critical IT load; the first is due to be energized in mid-2027.Crusoe; The Register
Power capacity336 MWPlanned · Phase · It load · Building 22026-03-27Crusoe; The Register
Power capacity900 MWPlanned · Campus · Onsite generation2026-03-27Behind-the-meter on-site power plant; Crusoe did not disclose the generation technology or fuel.Crusoe; The Register
Buildings2 countPlanned · Campus2026-03-27Crusoe; The Register

Companies and organizations

NameRoleNotesSources
CrusoeDeveloperCrusoe; Crusoe; Crusoe
MicrosoftTenantCrusoe says the campus will support large-scale AI workloads for Microsoft; lease terms were not disclosed.Crusoe; The Register
LanciumOwnerCrusoe describes the land as adjacent Lancium-owned land.Crusoe

Timeline

DateEventActual or plannedNotesSources
2026-03-27AnnouncedActualCrusoe; The Register
2026-03Construction startedActualLand clearing and site preparation were under way when the campus was announced.Crusoe; The Register
2027First operationalPlannedFirst building expected to be energized in mid-2027.Crusoe; The Register

Power supply

TypeDescriptionSources
OtherA 900 MW behind-the-meter on-site power plant that Crusoe says supports grid resilience; Crusoe has not said what fuel or technology it uses.Crusoe; The Register
Battery storageMedium-voltage battery energy storage paired with the on-site plant.Crusoe

This is a separate build from the eight-building Stargate Abilene campus (openai-stargate-abilene); Crusoe gives about 2.1 GW for its two Abilene campuses combined. The Register reports that Oracle and OpenAI had planned to lease this expansion before negotiations and financing fell through, and that Meta had been expected to take it before Microsoft; these are press reports, not company statements, and are not recorded as parties. In September 2026 Crusoe said it had two campuses under development in Abilene but gave no new status detail for this one.

Related projects: openai stargate abilene

Sources for these details
Companies
  • Developer: Crusoe (unknown scope) evidence
  • Developer: Crusoe (unknown scope) evidence
  • Developer: Crusoe (unknown scope) evidence
  • Tenant: Microsoft (unknown scope) evidence
  • Tenant: Microsoft (unknown scope) evidence
  • Owner: Lancium (unknown scope) evidence
Source and location review
Status source
Crusoe and Lancium announce 1.0 gigawatt AI data center campus in Childress, Texas evidence row
Crusoe · published 2026-07-15 · Company disclosure
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 104 days before the data update on 2026-10-27

Location details
Coordinates
32.45000, -99.75000
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Crusoe places the campus in Abilene, adjacent to its existing campus, without an address. Coordinates are the Abilene city point from its Wikipedia article; the city spans Taylor and Jones counties, so no county is recorded.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
2eb43ea9

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Crusoe Abilene AI factory campus for Microsoft
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Abilene, Texas
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia1335f68509546dc007e77b287c8242e9833f9fb1415bc3ed75f335b5379e5904
Factual source record; not the publisher page
Crusoe and Lancium announce 1.0 gigawatt AI data center campus in Childress, Texas
Archived copy
Crusoe
Company disclosure
Imported: Geometry, Imported: Record, Imported: Status, Metric: Power Capacity, Role: Developer, Owner claimsource-terms-not-recordedCrusoe4d1aa2f770404cff50c307a7b07185fe4be73407eca19a77941aec8127709429
Factual source record; not the publisher page
Crusoe announces new 900 MW AI factory campus in Abilene, Texas to support Microsoft AI infrastructure
Archived copy
Crusoe
Company disclosure
Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Power Capacity, Milestone: Announced, Milestone: Construction Started, Milestone: First Operational, Power Source: Battery Storage, Power Source: Other, Role: Developer, Tenant claimsource-terms-not-recordedCrusoe11a79aaa38ddd15a6c449a5c37e2c9bc641419f26c7bbab3796b8c41f10a0467
Factual source record; not the publisher page
Crusoe developing data center campus in Armstrong County, Texas
Archived copy
Crusoe
Company disclosure
Imported: Record, Role: Developersource-terms-not-recordedCrusoee93231e8761bf20586a525de9046cffd3bb8c90beaf61e9e3e5a0cb777210cdb
Factual source record; not the publisher page
Microsoft takes up residence next to OpenAI, Oracle at Crusoe's 900 MW Texas datacenter expansion
Archived copy
The Register
News
Imported: Record, Metric: Buildings, Metric: Power Capacity, Milestone: Announced, Milestone: Construction Started, Milestone: First Operational, Power Source: Other, Tenant claimsource-terms-not-recordedThe Register8cea85a73caee51bb46b84d70aa2c595a1e7c14ecebac42407121526e77691a3
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Crusoe Abilene AI factory campus for Microsoft [site vcc-site-9f7647940a58e048e38f]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9f7647940a58e048e38f/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction