Applied Digital Delta Forge 2

Under construction

United States · 1 project · Last reported

Summary

Applied Digital's fifth AI factory campus, on about 160 acres of a nearly 1,300-acre site north of Brookwood Parkway in Brookwood, Tuscaloosa County, Alabama. In June 2026 the company announced a 15-year lease of 210 MW of critical IT load to an unnamed US high investment-grade hyperscaler, worth about USD 5.2 billion in base-term revenue, naming only a southern state. Applied Digital confirmed the Brookwood site in September 2026; local reports gave an initial capital investment of about USD 3.29 billion and about 1.26 million square feet of data center space. Construction was set to begin on 1 October 2026, with initial operations expected in Q1 2028.

Source record as of 2026-10-07 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 33.23970, -87.32780 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Applied Digital Delta Forge 2

Under construction last observed as of · Reported status

Location: Brookwood, Tuscaloosa County, Alabama, US. Local reports place the campus north of the 17000 block of Brookwood Parkway. No geocoder was used; coordinates are the Brookwood city point from its Wikipedia article. ABC 33/40; FOX10 News; Wikipedia

Use: Ai training, Ai inference

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity210 MWContracted · Campus · It load2026-06-08Critical IT load leased for 15 years to an unnamed US high investment-grade hyperscaler; the release puts base-term revenue at about USD 5.2 billion.Applied Digital; Applied Digital via SEC EDGAR; ABC 33/40
Investmentabout 3,286,500,000 USDIncentive agreement · Campus2026-09-24Initial capital investment figure reported with the local incentive package; reports also round it to more than USD 3.2 billion from Applied Digital and its tenant.ABC 33/40; FOX10 News
Floor areaabout 1,260,000 sq_ftPlanned · Campus2026-09-24An earlier state environmental permit application had described about 2 million square feet.ABC 33/40; FOX10 News
Land areaabout 160 acresPlanned · Campus2026-09-24Campus footprint within a site of nearly 1,300 acres.ABC 33/40; FOX10 News
Jobs constructionmore than 1,000 countPlanned · Campus2026-09-24Expected peak construction workforce.ABC 33/40; FOX10 News
Jobs permanent101 countPlanned · Campus2026-09-24ABC 33/40

Companies and organizations

NameRoleNotesSources
Applied DigitalDeveloperApplied Digital; Applied Digital via SEC EDGAR; ABC 33/40
Tuscaloosa County Economic Development AuthorityGovernmentSigned off on the project in September 2026; Applied Digital committed USD 270 million in community benefit payments to the authority over 20 years.ABC 33/40; FOX10 News

Timeline

DateEventActual or plannedNotesSources
2026-06-08AnnouncedActualApplied Digital announced the 210 MW lease at Delta Forge 2 in an unnamed southern state.Applied Digital
2026-07-20Permit approvedActualAlabama's Department of Environmental Management approved a permit application for a data center in Brookwood, later confirmed as this project.FOX10 News
2026-09-24OtherActualApplied Digital confirmed the Brookwood location and the county economic development authority approved the incentive package.ABC 33/40; FOX10 News
2026-10-01Construction startedPlannedScheduled construction start reported with the incentive terms; the company's 7 October 2026 results list the campus as under construction.ABC 33/40; Applied Digital via SEC EDGAR
2028-Q1First operationalPlannedAnticipated start of initial operations; local reporting gives completion by the end of 2028.Applied Digital; ABC 33/40

The tenant is not named; Applied Digital says it is the same US high investment-grade hyperscaler as two of its other leases. Renewal options could lift lease revenue to about USD 12.7 billion over a 30-year total term. The June 2026 release describes proprietary waterless cooling for the campus. No source opened names the utility or a dedicated power arrangement for the campus. Local reports put 20-year taxes and community payments at about USD 440.7 million, against about USD 314.5 million in tax abatements.

Sources for these details
Companies
  • Developer: Applied Digital (unknown scope) evidence
  • Developer: Applied Digital (unknown scope) evidence
  • Developer: Applied Digital (unknown scope) evidence
  • Government: Tuscaloosa County Economic Development Authority (unknown scope) evidence
  • Government: Tuscaloosa County Economic Development Authority (unknown scope) evidence
Source and location review
Status source
Applied Digital reports fiscal first quarter 2027 results (Form 8-K exhibit) evidence row
Applied Digital via SEC EDGAR · published 2026-10-07 · Regulatory filing
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 20 days before the data update on 2026-10-27

Location details
Coordinates
33.23970, -87.32780
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Local reports place the campus north of the 17000 block of Brookwood Parkway. No geocoder was used; coordinates are the Brookwood city point from its Wikipedia article.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
ab72ef7f

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Applied Digital Delta Forge 2
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
$3.2 billion AI data center campus announced in Brookwood
Archived copy
ABC 33/40
News
Imported: Geometry, Imported: Record, Imported: Status, Metric: Floor Area, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Metric: Land Area, Metric: Power Capacity, Milestone: Construction Started, Milestone: First Operational, Milestone: Other, Role: Developer, Role: Governmentsource-terms-not-recordedABC 33/40aca9e4b00a18212e8c5a831d1e2ef3d2bfc29aa17273bae3670a5616460d2aa9
Factual source record; not the publisher page
Applied Digital confirms $3.2 billion data center campus in Brookwood
Archived copy
FOX10 News
News
Imported: Geometry, Imported: Record, Metric: Floor Area, Metric: Investment, Metric: Jobs Construction, Metric: Land Area, Milestone: Other, Milestone: Permit Approved, Role: Governmentsource-terms-not-recordedFOX10 Newsf961ada363fe686f6f65897cece4baefd040a9678144482edfdea4ab554fc467
Factual source record; not the publisher page
Applied Digital reports fiscal first quarter 2027 results (Form 8-K exhibit)
Archived copy
Applied Digital via SEC EDGAR
Regulatory filing
Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: Construction Started, Role: Developersource-terms-not-recordedApplied Digital via SEC EDGARd546853aade9209956bf39a588a30253049225e135e6a6cd6949ab3d55fb97e1
Factual source record; not the publisher page
Applied Digital signs 210 MW lease at Delta Forge 2, expanding its AI factory franchise model to a fifth campus
Archived copy
Applied Digital
Company disclosure
Imported: Record, Metric: Power Capacity, Milestone: Announced, Milestone: First Operational, Role: Developersource-terms-not-recordedApplied Digital507ba393851f09e5546f1e9e61b9315765b9531f973fdf51620fafded15471aa
Factual source record; not the publisher page
Brookwood, Alabama
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia8f6d008c35c8cee50d375b4d15048758ac4f8594db452883274ee1b27e92ad4d
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Applied Digital Delta Forge 2 [site vcc-site-8d354596ddb2508a0eda]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8d354596ddb2508a0eda/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction