Applied Digital Delta Forge 2
Under construction
United States · 1 project · Last reported
Summary
Applied Digital's fifth AI factory campus, on about 160 acres of a nearly 1,300-acre site north of Brookwood Parkway in Brookwood, Tuscaloosa County, Alabama. In June 2026 the company announced a 15-year lease of 210 MW of critical IT load to an unnamed US high investment-grade hyperscaler, worth about USD 5.2 billion in base-term revenue, naming only a southern state. Applied Digital confirmed the Brookwood site in September 2026; local reports gave an initial capital investment of about USD 3.29 billion and about 1.26 million square feet of data center space. Construction was set to begin on 1 October 2026, with initial operations expected in Q1 2028.
Source record as of 2026-10-07 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 33.23970, -87.32780 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Town or locality reference only; the facility position is not established.
Projects (1)
Applied Digital Delta Forge 2
Under construction last observed as of · Reported status
Location: Brookwood, Tuscaloosa County, Alabama, US. Local reports place the campus north of the 17000 block of Brookwood Parkway. No geocoder was used; coordinates are the Brookwood city point from its Wikipedia article. ABC 33/40; FOX10 News; Wikipedia
Use: Ai training, Ai inference
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | 210 MW | Contracted · Campus · It load | 2026-06-08 | Critical IT load leased for 15 years to an unnamed US high investment-grade hyperscaler; the release puts base-term revenue at about USD 5.2 billion. | Applied Digital; Applied Digital via SEC EDGAR; ABC 33/40 |
| Investment | about 3,286,500,000 USD | Incentive agreement · Campus | 2026-09-24 | Initial capital investment figure reported with the local incentive package; reports also round it to more than USD 3.2 billion from Applied Digital and its tenant. | ABC 33/40; FOX10 News |
| Floor area | about 1,260,000 sq_ft | Planned · Campus | 2026-09-24 | An earlier state environmental permit application had described about 2 million square feet. | ABC 33/40; FOX10 News |
| Land area | about 160 acres | Planned · Campus | 2026-09-24 | Campus footprint within a site of nearly 1,300 acres. | ABC 33/40; FOX10 News |
| Jobs construction | more than 1,000 count | Planned · Campus | 2026-09-24 | Expected peak construction workforce. | ABC 33/40; FOX10 News |
| Jobs permanent | 101 count | Planned · Campus | 2026-09-24 | ABC 33/40 |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| Applied Digital | Developer | Applied Digital; Applied Digital via SEC EDGAR; ABC 33/40 | |
| Tuscaloosa County Economic Development Authority | Government | Signed off on the project in September 2026; Applied Digital committed USD 270 million in community benefit payments to the authority over 20 years. | ABC 33/40; FOX10 News |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2026-06-08 | Announced | Actual | Applied Digital announced the 210 MW lease at Delta Forge 2 in an unnamed southern state. | Applied Digital |
| 2026-07-20 | Permit approved | Actual | Alabama's Department of Environmental Management approved a permit application for a data center in Brookwood, later confirmed as this project. | FOX10 News |
| 2026-09-24 | Other | Actual | Applied Digital confirmed the Brookwood location and the county economic development authority approved the incentive package. | ABC 33/40; FOX10 News |
| 2026-10-01 | Construction started | Planned | Scheduled construction start reported with the incentive terms; the company's 7 October 2026 results list the campus as under construction. | ABC 33/40; Applied Digital via SEC EDGAR |
| 2028-Q1 | First operational | Planned | Anticipated start of initial operations; local reporting gives completion by the end of 2028. | Applied Digital; ABC 33/40 |
The tenant is not named; Applied Digital says it is the same US high investment-grade hyperscaler as two of its other leases. Renewal options could lift lease revenue to about USD 12.7 billion over a 30-year total term. The June 2026 release describes proprietary waterless cooling for the campus. No source opened names the utility or a dedicated power arrangement for the campus. Local reports put 20-year taxes and community payments at about USD 440.7 million, against about USD 314.5 million in tax abatements.
Sources for these details
- Applied Digital signs 210 MW lease at Delta Forge 2, expanding its AI factory franchise model to a fifth campus — Applied Digital; 2026-06-08 · Archived source
- Applied Digital reports fiscal first quarter 2027 results (Form 8-K exhibit) — Applied Digital via SEC EDGAR; 2026-10-07
- $3.2 billion AI data center campus announced in Brookwood — ABC 33/40; 2026-09-24 · Archived source
- Applied Digital confirms $3.2 billion data center campus in Brookwood — FOX10 News; 2026-09-24
- Brookwood, Alabama — Wikipedia; publication date not stated · Archived source
- Companies
- Developer: Applied Digital (unknown scope) evidence
- Developer: Applied Digital (unknown scope) evidence
- Developer: Applied Digital (unknown scope) evidence
- Government: Tuscaloosa County Economic Development Authority (unknown scope) evidence
- Government: Tuscaloosa County Economic Development Authority (unknown scope) evidence
Source and location review
- Status source
- Applied Digital reports fiscal first quarter 2027 results (Form 8-K exhibit) evidence row
Applied Digital via SEC EDGAR · published 2026-10-07 · Regulatory filing - Locator
- Locality reference only · Compiled location reference · locality evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 20 days before the data update on 2026-10-27
Location details
- Coordinates
- 33.23970, -87.32780
- Geometry licence
- source-terms-not-recorded
- Use scope
- Locality reference only
- Scope class
- locality
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- Local reports place the campus north of the 17000 block of Brookwood Parkway. No geocoder was used; coordinates are the Brookwood city point from its Wikipedia article.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- ab72ef7f
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| $3.2 billion AI data center campus announced in Brookwood Archived copy | ABC 33/40 News | Imported: Geometry, Imported: Record, Imported: Status, Metric: Floor Area, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Metric: Land Area, Metric: Power Capacity, Milestone: Construction Started, Milestone: First Operational, Milestone: Other, Role: Developer, Role: Government | source-terms-not-recorded | ABC 33/40 | aca9e4b00a18212e8c5a831d1e2ef3d2bfc29aa17273bae3670a5616460d2aa9Factual source record; not the publisher page | ||
| Applied Digital confirms $3.2 billion data center campus in Brookwood Archived copy | FOX10 News News | Imported: Geometry, Imported: Record, Metric: Floor Area, Metric: Investment, Metric: Jobs Construction, Metric: Land Area, Milestone: Other, Milestone: Permit Approved, Role: Government | source-terms-not-recorded | FOX10 News | f961ada363fe686f6f65897cece4baefd040a9678144482edfdea4ab554fc467Factual source record; not the publisher page | ||
| Applied Digital reports fiscal first quarter 2027 results (Form 8-K exhibit) Archived copy | Applied Digital via SEC EDGAR Regulatory filing | Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: Construction Started, Role: Developer | source-terms-not-recorded | Applied Digital via SEC EDGAR | d546853aade9209956bf39a588a30253049225e135e6a6cd6949ab3d55fb97e1Factual source record; not the publisher page | ||
| Applied Digital signs 210 MW lease at Delta Forge 2, expanding its AI factory franchise model to a fifth campus Archived copy | Applied Digital Company disclosure | Imported: Record, Metric: Power Capacity, Milestone: Announced, Milestone: First Operational, Role: Developer | source-terms-not-recorded | Applied Digital | 507ba393851f09e5546f1e9e61b9315765b9531f973fdf51620fafded15471aaFactual source record; not the publisher page | ||
| Brookwood, Alabama Archived copy | Wikipedia Other | Imported: Geometry, Imported: Record | not stated | source-terms-not-recorded | Wikipedia | 8f6d008c35c8cee50d375b4d15048758ac4f8594db452883274ee1b27e92ad4dFactual source record; not the publisher page |
Cite this site
Kyars, K. (2026). Applied Digital Delta Forge 2 [site vcc-site-8d354596ddb2508a0eda]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8d354596ddb2508a0eda/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction