Morris Technology Park

Announced

United States · 1 project · Last reported

Summary

Data center land developer Tract, through an affiliate, bought 343 acres of vacant farmland off Interstate 80 in Morris, Grundy County, Illinois, about 65 miles from downtown Chicago, for a planned 1 GW data center campus of roughly 2.9 million square feet. The project won city approval in 2025, the site is annexed and zoned for it, and it has a transmission security agreement with ComEd. Tract targets initial energization in June 2028 and a full 1 GW load by 2032. Tract's model is to entitle and service raw land and then offer it to large data center users or developers; no end user has been named for this site.

Source record as of 2026-01-27 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 41.38000, -88.42440 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Morris Technology Park

Announced last observed as of · Reported status

Location: Morris, Grundy County, Illinois, US. Wikipedia coordinates for Morris. Bisnow places the parcel off Interstate 80 in Morris but gives no address. Bisnow

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity1,000 MWPlanned · Campus · Unspecified2026-01-27Tract targets a full 1 GW load ramp by 2032.Bisnow
Land area343 acresAcquired · Campus2026-01-27Purchase from an affiliate of Clarius Partners for about USD 51.5 million, per public records cited by Bisnow; the article gives no closing date.Bisnow
Floor areaabout 2,900,000 sq_ftPlanned · Campus2026-01-27Bisnow

Companies and organizations

NameRoleNotesSources
TractDeveloperBought the site through an affiliate.Bisnow
ComEdUtilityParty to a transmission security agreement for the site.Bisnow
City of MorrisGovernmentGranted city approval for the project in 2025.Bisnow

Timeline

DateEventActual or plannedNotesSources
2025Zoning approvedActualCity approval reported without a month. The year is derived: Bisnow's January 2026 article says approval came last year.Bisnow
2028-06First operationalPlannedTarget for initial energization.Bisnow
2032Fully operationalPlannedTarget for reaching the full 1 GW load.Bisnow

Power supply

TypeDescriptionSources
GridComEd transmission service under a transmission security agreement.Bisnow
Sources for these details
Companies
  • Developer: Tract (unknown scope) evidence
  • Utility: ComEd (unknown scope) evidence
  • Government: City of Morris (unknown scope) evidence
Source and location review
Status source
Data Center Infrastructure Developer Takes 343-Acre Chicago-Area Swing evidence row
Bisnow · published 2026-01-27 · Trade publication
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 273 days before the data update on 2026-10-27

Location details
Coordinates
41.38000, -88.42440
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Wikipedia coordinates for Morris. Bisnow places the parcel off Interstate 80 in Morris but gives no address.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
448aa44d

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Morris Technology Park
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Data Center Infrastructure Developer Takes 343-Acre Chicago-Area Swing
Archived copy
Bisnow
Trade publication
Imported: Geometry, Imported: Record, Imported: Status, Metric: Floor Area, Metric: Land Area, Metric: Power Capacity, Milestone: First Operational, Milestone: Fully Operational, Milestone: Zoning Approved, Power Source: Grid, Role: Developer, Role: Government, Role: Utilitysource-terms-not-recordedBisnow57056a4b5235c7ece20163bdfeab0ce676097fd9f2885ad37d669aa85ba0cdf6
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Morris Technology Park [site vcc-site-6e1076932d6836b39df9]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6e1076932d6836b39df9/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction