Morris Technology Park
Announced
United States · 1 project · Last reported
Summary
Data center land developer Tract, through an affiliate, bought 343 acres of vacant farmland off Interstate 80 in Morris, Grundy County, Illinois, about 65 miles from downtown Chicago, for a planned 1 GW data center campus of roughly 2.9 million square feet. The project won city approval in 2025, the site is annexed and zoned for it, and it has a transmission security agreement with ComEd. Tract targets initial energization in June 2028 and a full 1 GW load by 2032. Tract's model is to entitle and service raw land and then offer it to large data center users or developers; no end user has been named for this site.
Source record as of 2026-01-27 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 41.38000, -88.42440 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Town or locality reference only; the facility position is not established.
Projects (1)
Morris Technology Park
Announced last observed as of · Reported status
Location: Morris, Grundy County, Illinois, US. Wikipedia coordinates for Morris. Bisnow places the parcel off Interstate 80 in Morris but gives no address. Bisnow
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | 1,000 MW | Planned · Campus · Unspecified | 2026-01-27 | Tract targets a full 1 GW load ramp by 2032. | Bisnow |
| Land area | 343 acres | Acquired · Campus | 2026-01-27 | Purchase from an affiliate of Clarius Partners for about USD 51.5 million, per public records cited by Bisnow; the article gives no closing date. | Bisnow |
| Floor area | about 2,900,000 sq_ft | Planned · Campus | 2026-01-27 | Bisnow |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| Tract | Developer | Bought the site through an affiliate. | Bisnow |
| ComEd | Utility | Party to a transmission security agreement for the site. | Bisnow |
| City of Morris | Government | Granted city approval for the project in 2025. | Bisnow |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2025 | Zoning approved | Actual | City approval reported without a month. The year is derived: Bisnow's January 2026 article says approval came last year. | Bisnow |
| 2028-06 | First operational | Planned | Target for initial energization. | Bisnow |
| 2032 | Fully operational | Planned | Target for reaching the full 1 GW load. | Bisnow |
Power supply
| Type | Description | Sources |
|---|---|---|
| Grid | ComEd transmission service under a transmission security agreement. | Bisnow |
Sources for these details
- Data Center Infrastructure Developer Takes 343-Acre Chicago-Area Swing — Bisnow; 2026-01-27
- Companies
Source and location review
- Status source
- Data Center Infrastructure Developer Takes 343-Acre Chicago-Area Swing evidence row
Bisnow · published 2026-01-27 · Trade publication - Locator
- Locality reference only · Compiled location reference · locality evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 273 days before the data update on 2026-10-27
Location details
- Coordinates
- 41.38000, -88.42440
- Geometry licence
- source-terms-not-recorded
- Use scope
- Locality reference only
- Scope class
- locality
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- Wikipedia coordinates for Morris. Bisnow places the parcel off Interstate 80 in Morris but gives no address.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- 448aa44d
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Data Center Infrastructure Developer Takes 343-Acre Chicago-Area Swing Archived copy | Bisnow Trade publication | Imported: Geometry, Imported: Record, Imported: Status, Metric: Floor Area, Metric: Land Area, Metric: Power Capacity, Milestone: First Operational, Milestone: Fully Operational, Milestone: Zoning Approved, Power Source: Grid, Role: Developer, Role: Government, Role: Utility | source-terms-not-recorded | Bisnow | 57056a4b5235c7ece20163bdfeab0ce676097fd9f2885ad37d669aa85ba0cdf6Factual source record; not the publisher page |