Microsoft Mount Pleasant International Drive datacenter campus

Announced

United States · 1 project · Last reported

Summary

Planned six-building Microsoft datacenter campus along International Drive in Mount Pleasant, Wisconsin, on about 530 acres Microsoft says it bought in 2024. Village planning documents reported by WPR describe more than 3.5 million sq ft of development, including a 74,000 sq ft office and other buildings, with an estimated taxable value of more than USD 5.3 billion. The plan commission recommended the site plan with conditions including a traffic impact analysis and water-use compliance, and the village board approved it unanimously in January 2026. Microsoft called the plans preliminary and gave no construction timeline or energy estimate.

Source record as of 2026-01-27 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 42.71120, -87.93390 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Approximate site reference; the exact facility position is unverified.

Projects (1)

Microsoft Mount Pleasant International Drive datacenter campus

Announced last observed as of · Reported status

Location: Mount Pleasant, Racine County, Wisconsin, US. Nominatim point for International Drive in Mount Pleasant, the road the sources name for the campus; the parcel boundary is not published. Wisconsin Public Radio; Spectrum News 1

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Investmentmore than 5,300,000,000 USDReported · Campus2026-01-20The municipality's estimated taxable value for the development, from village planning documents reported by WPR; not a company investment figure.Wisconsin Public Radio
Buildings6 countPlanned · Campus2026-01-27Datacenter buildings only; an office and other buildings are additional.Wisconsin Public Radio; Spectrum News 1; Spectrum News 1
Floor areamore than 3,500,000 sq_ftPlanned · Campus2026-01-20Total development size from village planning documents reported by WPR; the office and other buildings are not broken out.Wisconsin Public Radio
Land areaabout 530 acresReported · Campus2026-01-21Wisconsin Public Radio; Wisconsin Public Radio

Companies and organizations

NameRoleNotesSources
MicrosoftDeveloperWisconsin Public Radio; Spectrum News 1
MicrosoftOwnerA Microsoft spokesperson said the land was bought in 2024; a village spokesperson said it came from the village or private owners.Wisconsin Public Radio; Wisconsin Public Radio
Village of Mount PleasantGovernmentThe plan commission recommended and the village board approved the site plan; the campus sits in a tax increment financing district.Wisconsin Public Radio; Wisconsin Public Radio; Spectrum News 1

Timeline

DateEventActual or plannedNotesSources
2024Site acquiredActualWisconsin Public Radio; Wisconsin Public Radio
2026-01-20AnnouncedActualSite plans became public ahead of the plan commission meeting; Microsoft called them preliminary.Wisconsin Public Radio; Spectrum News 1
2026-01-26Zoning approvedActualPlan commission recommended approval on 2026-01-21; the village board approved the site plan unanimously on 2026-01-26, allowing engineering plans and building permit applications to follow.Wisconsin Public Radio; Spectrum News 1

Approved together with the nine-building Durand Avenue campus; the two campuses' combined estimated taxable value was reported as more than USD 13 billion. Microsoft told WPR that an energy-use estimate was not available.

Related projects: microsoft fairwater mount pleasant, microsoft mount pleasant durand avenue

Sources for these details
Companies
  • Developer: Microsoft (unknown scope) evidence
  • Developer: Microsoft (unknown scope) evidence
  • Owner: Microsoft (unknown scope) evidence
  • Owner: Microsoft (unknown scope) evidence
  • Government: Village of Mount Pleasant (unknown scope) evidence
  • Government: Village of Mount Pleasant (unknown scope) evidence
  • Government: Village of Mount Pleasant (unknown scope) evidence
Source and location review
Status source
Mount Pleasant village board approves Microsoft data center expansion evidence row
Spectrum News 1 · published 2026-01-27 · News
Locator
Approximate site reference · Compiled location reference · approximate_site evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 273 days before the data update on 2026-10-27

Location details
Coordinates
42.71120, -87.93390
Geometry licence
source-terms-not-recorded
Use scope
Approximate site reference
Scope class
approximate_site
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Nominatim point for International Drive in Mount Pleasant, the road the sources name for the campus; the parcel boundary is not published.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
20fee728

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Microsoft Mount Pleasant International Drive datacenter campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Microsoft to expand data center in Mount Pleasant
Archived copy
Spectrum News 1
News
Imported: Geometry, Imported: Record, Metric: Buildings, Milestone: Announced, Role: Developersource-terms-not-recordedSpectrum News 1e09f839f30f4fb2fd9e8da293e03e7f9434cde0cc6bd75882015aefc5bdd0cf1
Factual source record; not the publisher page
Microsoft wants to build 15 more data centers in Mount Pleasant
Archived copy
Wisconsin Public Radio
News
Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Floor Area, Metric: Investment, Metric: Land Area, Milestone: Announced, Milestone: Site Acquired, Role: Developer, Role: Government, Owner claimsource-terms-not-recordedWisconsin Public Radiof5c07ee2d16d30d338ec6b0749836f4293ad6b42aa12d1c2039d40ab6aa1c402
Factual source record; not the publisher page
Mount Pleasant commission approves Microsoft's plans for data center expansion
Archived copy
Wisconsin Public Radio
News
Imported: Record, Metric: Land Area, Milestone: Site Acquired, Milestone: Zoning Approved, Role: Government, Owner claimsource-terms-not-recordedWisconsin Public Radiofefa01c1b78ce4247a1c0a885f4860edcd80d717b3d09e9492ac66d4f72e0a7a
Factual source record; not the publisher page
Mount Pleasant village board approves Microsoft data center expansion
Archived copy
Spectrum News 1
News
Imported: Record, Imported: Status, Metric: Buildings, Milestone: Zoning Approved, Role: Governmentsource-terms-not-recordedSpectrum News 1c9e5ab699903ee4f4c258c03a79ae4359110c1ceab118e746fe2682a669f7845
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Microsoft Mount Pleasant International Drive datacenter campus [site vcc-site-c5988379bc974f1f6240]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c5988379bc974f1f6240/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction