PowerHouse Grand Prairie campus (PowerHouse and Provident)

Announced

United States · 1 project · Last reported

Summary

Hyperscale data center campus planned by a PowerHouse Data Centers and Provident Data Centers joint venture on 768 to 810 acres just outside Grand Prairie in northern Ellis County, Texas. The partners plan an on-site 1.8 GW switchyard, with a first 500 MW tranche approved through ERCOT, and 24 buildings in three phases at announcement. A state accessibility filing registered in April 2026 covers Data Center Building 1, a two-story 224,152 sq ft core and shell at 881 Miller Road with an estimated cost of about USD 72.6 million and a scheduled April 2026 to April 2028 build window.

Source record as of 2026-04-02 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 32.50690, -97.00690 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

PowerHouse Grand Prairie campus (PowerHouse and Provident)

Announced last observed as of · Reported status

Location: Midlothian, Ellis County, Texas, US. Coordinates are the Wikipedia centroid of Midlothian (s5), the mailing city in the state filing for Building 1 at 881 Miller Road (s4). The developers describe the site as just outside Grand Prairie in northern Ellis County. The street address was not geocoded. PowerHouse Data Centers; Texas Department of Licensing and Regulation; Wikipedia

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity1,800 MWPlanned · Campus · Grid connection2025-02-25Planned on-site switchyard capacity; the campus page calls it the maximum utility power.PowerHouse Data Centers; Dallas Innovates; PowerHouse Data Centers
Power capacity500 MWPlanned · Phase · Grid connection · First power tranche2025-02-25Described as already approved through ERCOT at announcement.PowerHouse Data Centers; Dallas Innovates
Land area768 acresReported · Campus2025-02-25PowerHouse Data Centers; Dallas Innovates
Land area810 acresReported · Campus2026-10-09Figure on PowerHouse's undated campus page, which is larger than the 768 acres announced in 2025.PowerHouse Data Centers
Buildings24 countPlanned · Campus2025-02-25Planned across three phases at announcement. The later campus page instead lists four building phases (10 buildings in each of the first two, 4 in each of the last two).PowerHouse Data Centers; Dallas Innovates
Floor areaabout 8,500,000 sq_ftPlanned · Campus2026-10-09Developable area stated on the undated campus page.PowerHouse Data Centers
Floor area224,152 sq_ftPlanned · Phase · Data Center Building 12026-04-02Texas Department of Licensing and Regulation
Investment72,590,278 USDReported · Phase · Data Center Building 12026-04-02Estimated construction cost of the core and shell in a Texas Department of Licensing and Regulation accessibility registration; excludes fit-out and IT equipment.Texas Department of Licensing and Regulation

Companies and organizations

NameRoleNotesSources
PowerHouse Data CentersDeveloperA division of American Real Estate Partners (AREP).PowerHouse Data Centers; Dallas Innovates; PowerHouse Data Centers
Provident Data CentersDeveloperDallas-based joint venture partner; this was the first project of the partnership.PowerHouse Data Centers; Dallas Innovates
Prairie Ridge Phase 1 Owner LPOwnerOwner entity named in the April 2026 state filing for Data Center Building 1.Texas Department of Licensing and Regulation

Timeline

DateEventActual or plannedNotesSources
2025-02-25AnnouncedActualThe developers said the site had been rezoned and that all required approvals and permits were in hand.PowerHouse Data Centers; Dallas Innovates
2026-04-01Construction startedPlannedScheduled start of Building 1 in the state filing, with completion scheduled for 1 April 2028. No report confirming work under way was found.Texas Department of Licensing and Regulation
2026-05First operationalPlannedOriginal target for energizing the first building, given at announcement.PowerHouse Data Centers
2027-Q1First operationalPlannedLater target on the campus page, which lists delivery in Q1 2027 alongside power delivery and construction delivery in Q4 2026.PowerHouse Data Centers

Power supply

TypeDescriptionSources
GridPlanned on-site 1.8 GW switchyard on the ERCOT grid, with a first 500 MW tranche approved through ERCOT.PowerHouse Data Centers; Dallas Innovates

Status is kept at announced because the only 2026 evidence is a state registration with scheduled dates; no report of construction under way, energization or a tenant was found. The campus page is undated (its footer and image file names point to 2025), so its figures carry the access date. Acreage and building counts differ between the 2025 announcement and the campus page.

Sources for these details
Companies
  • Developer: PowerHouse Data Centers (unknown scope) evidence
  • Developer: PowerHouse Data Centers (unknown scope) evidence
  • Developer: PowerHouse Data Centers (unknown scope) evidence
  • Developer: Provident Data Centers (unknown scope) evidence
  • Developer: Provident Data Centers (unknown scope) evidence
  • Owner: Prairie Ridge Phase 1 Owner LP (unknown scope) evidence
Source and location review
Status source
TABS2026016734: AREP Power House Grand Prairie, Data Center Building 1 evidence row
Texas Department of Licensing and Regulation · published 2026-04-02 · Regulatory filing
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 208 days before the data update on 2026-10-27

Location details
Coordinates
32.50690, -97.00690
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Coordinates are the Wikipedia centroid of Midlothian (s5), the mailing city in the state filing for Building 1 at 881 Miller Road (s4). The developers describe the site as just outside Grand Prairie in northern Ellis County. The street address was not geocoded.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
8199ea4f

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for PowerHouse Grand Prairie campus (PowerHouse and Provident)
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Dallas' Provident Data Centers, Virginia's PowerHouse Partner on 'Hyperscale' North Texas Campus
Archived copy
Dallas Innovates
News
Imported: Record, Metric: Buildings, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Power Source: Grid, Role: Developersource-terms-not-recordedDallas Innovates7fa1f957c83711c2859e4157bf8cd9a5e2328392f3ab5ac1e70e609773e5a450
Factual source record; not the publisher page
Midlothian, Texas
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia262784da66f9ba25764017cb0fcbbdee5cb3613641c9f7420ecc2c8117d49520
Factual source record; not the publisher page
PowerHouse and Provident Rewrite the Data Center Playbook with New Texas Hyperscale Campus
Archived copy
PowerHouse Data Centers
Company disclosure
Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Milestone: First Operational, Power Source: Grid, Role: Developersource-terms-not-recordedPowerHouse Data Centersaa1a77f917f36199b41d608882f9f5dbc147b53e8baf90e0414832a50b99e398
Factual source record; not the publisher page
PowerHouse Grand Prairie
Archived copy
PowerHouse Data Centers
Company disclosure
Imported: Record, Metric: Floor Area, Metric: Land Area, Metric: Power Capacity, Milestone: First Operational, Role: Developernot statedsource-terms-not-recordedPowerHouse Data Centers0fc1eca981eb87512f58620690ada1010a4aeb3725d1cbb44426b45e78e97de6
Factual source record; not the publisher page
TABS2026016734: AREP Power House Grand Prairie, Data Center Building 1
Archived copy
Texas Department of Licensing and Regulation
Regulatory filing
Imported: Geometry, Imported: Record, Imported: Status, Metric: Floor Area, Metric: Investment, Milestone: Construction Started, Owner claimsource-terms-not-recordedTexas Department of Licensing and Regulation28a939c1aff8fa36fd1e0e71d902fead1f3611751ed9184628aaa3e5437102fe
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). PowerHouse Grand Prairie campus (PowerHouse and Provident) [site vcc-site-910b8939869a2f993425]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-910b8939869a2f993425/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction