EdgeCore Digital Infrastructure plans a hyperscale data center campus on 697 acres it bought from Louisa County in the Shannon Hill Regional Business Park, about 40 miles northwest of Richmond, Virginia. Announced in June 2025, the campus is planned for more than 1.1 GW, which EdgeCore's campus page describes as critical IT load, with investment of more than USD 17 billion. Rappahannock Electric Cooperative is expected to provide power. EdgeCore's announcement cited 3.9 million square feet, while its current campus page lists 3.1 million square feet in at least six single-tenant buildings.
Source record as of 2026-10-09 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 37.99000, -77.96000 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
County or district reference only; the facility position is not established.
Projects (1)
EdgeCore Louisa County campus
Announced last observed as of · Reported status
Location: Louisa County, Virginia, US. Wikipedia coordinates for Louisa County, Virginia. EdgeCore places the campus in the Shannon Hill Regional Business Park, which no cited source locates precisely. EdgeCore Digital Infrastructure; Bisnow
Use: Ai training, Ai inference, Cloud
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | more than 1,100 MW | Planned · Campus · It load | 2025-06-25 | The announcement gives more than 1.1 GW without a scope; EdgeCore's campus page describes the figure as critical IT load at full build-out. | EdgeCore Digital Infrastructure; EdgeCore Digital Infrastructure |
| Investment | more than 17,000,000,000 USD | Announced · Campus | 2025-06-25 | Bisnow describes the investment as close to USD 17 billion. | EdgeCore Digital Infrastructure |
| Land area | 697 acres | Acquired · Campus | 2025-06-25 | Bisnow reports EdgeCore bought the site from the county for USD 42 million. | EdgeCore Digital Infrastructure; Bisnow |
| Floor area | 3,900,000 sq_ft | Planned · Campus | 2025-06-25 | Figure in the June 2025 announcement; Bisnow reported nearly 4 million square feet. | EdgeCore Digital Infrastructure |
| Floor area | 3,100,000 sq_ft | Planned · Campus | 2026-10-09 | Figure on EdgeCore's undated campus page as viewed on the access date; it is lower than the announcement's 3.9 million square feet. | EdgeCore Digital Infrastructure |
| Buildings | at least 6 count | Planned · Campus | 2026-10-09 | Single-tenant data centers, per the undated campus page as viewed on the access date. | EdgeCore Digital Infrastructure |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| EdgeCore Digital Infrastructure | Developer | EdgeCore Digital Infrastructure; Bisnow | |
| Partners Group | Investor | Investment firm backing EdgeCore; not described as investing in this campus specifically. | Bisnow |
| Rappahannock Electric Cooperative | Utility | EdgeCore Digital Infrastructure; Bisnow | |
| Louisa County | Government | Bought the business park land in 2018, rezoned it for technology uses and sold the site to EdgeCore. | Bisnow |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2019 | Other | Actual | Louisa County rezoned the business park land, bought in 2018, for technology uses. | Bisnow |
| 2025-06-25 | Announced | Actual | EdgeCore Digital Infrastructure; Bisnow |
Power supply
| Type | Description | Sources |
|---|---|---|
| Grid | Rappahannock Electric Cooperative expects to work with EdgeCore and the county to power the campus; the release also names Hyperscale Energy as the cooperative's affiliate without giving it a role. | EdgeCore Digital Infrastructure; Bisnow |
Status rests on EdgeCore's undated campus page, viewed on 2026-10-09, which still describes the campus in planning terms and gives no construction or delivery dates.
Sources for these details
- EdgeCore Digital Infrastructure Announces Plans to Invest $17B+ in Louisa County, VA through the Development of 1.1+ Gigawatt Data Center Campus — EdgeCore Digital Infrastructure; 2025-06-25 · Archived source
- Louisa County Data Centers — EdgeCore Digital Infrastructure; publication date not stated
- New $17B Project Continues Data Center Surge In Small Virginia County — Bisnow; 2025-06-25
- Companies
- Developer: EdgeCore Digital Infrastructure (unknown scope) evidence
- Developer: EdgeCore Digital Infrastructure (unknown scope) evidence
- Investor: Partners Group (unknown scope) evidence
- Utility: Rappahannock Electric Cooperative (unknown scope) evidence
- Utility: Rappahannock Electric Cooperative (unknown scope) evidence
- Government: Louisa County (unknown scope) evidence
Source and location review
- Status source
- Louisa County Data Centers evidence row
EdgeCore Digital Infrastructure · publication date not stated · Company disclosure - Locator
- County or district reference only · Compiled location reference · admin2 evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 18 days before the data update on 2026-10-27
Location details
- Coordinates
- 37.99000, -77.96000
- Geometry licence
- source-terms-not-recorded
- Use scope
- County or district reference only
- Scope class
- admin2
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- Wikipedia coordinates for Louisa County, Virginia. EdgeCore places the campus in the Shannon Hill Regional Business Park, which no cited source locates precisely.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- 6857f912
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| EdgeCore Digital Infrastructure Announces Plans to Invest $17B+ in Louisa County, VA through the Development of 1.1+ Gigawatt Data Center Campus Archived copy | EdgeCore Digital Infrastructure Company disclosure | Imported: Geometry, Imported: Record, Imported: Status, Metric: Floor Area, Metric: Investment, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Power Source: Grid, Role: Developer, Role: Utility | source-terms-not-recorded | EdgeCore Digital Infrastructure | e6805003901be934898af5ead35164bdaf72a44e37c8612b4ef5f8fbbb084a6dFactual source record; not the publisher page | ||
| Louisa County Data Centers Archived copy | EdgeCore Digital Infrastructure Company disclosure | Imported: Record, Imported: Status, Metric: Buildings, Metric: Floor Area, Metric: Power Capacity | not stated | source-terms-not-recorded | EdgeCore Digital Infrastructure | 2ab6bc89f31d3ec3e061baea298df5089db74806321575910da21fb002185116Factual source record; not the publisher page | |
| New $17B Project Continues Data Center Surge In Small Virginia County Archived copy | Bisnow Trade publication | Imported: Geometry, Imported: Record, Metric: Land Area, Milestone: Announced, Milestone: Other, Power Source: Grid, Role: Developer, Role: Government, Role: Investor, Role: Utility | source-terms-not-recorded | Bisnow | eac6f0202e09635efcdf0d74bbb6a20b1ae22ddb71b0e772ee7c0080cb37639eFactual source record; not the publisher page |
Cite this site
Kyars, K. (2026). EdgeCore Louisa County campus [site vcc-site-ebc20ddd515fd9367ea7]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ebc20ddd515fd9367ea7/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction