Meta data center on a 393-acre site off NW H K Dodgen Loop and Industrial Boulevard in Temple, Texas. Announced in March 2022 as a USD 800 million, roughly 900,000 sq ft hyperscale campus expected to be finished in 2024, it broke ground in 2022, was redesigned with construction restarting in 2023, and opened in July 2026 as an AI data center of two buildings and more than 760,000 sq ft. Meta now gives its investment as USD 1.2 billion. Meta describes it as its second data center in Texas.

Source record as of 2026-07-22 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 31.10560, -97.42080 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Meta Temple Data Center

Operational last observed as of · Reported status

Location: Temple, Bell County, Texas, US. Coordinates are the Temple city coordinates from its Wikipedia page. Sources place the site off NW H K Dodgen Loop and Industrial Boulevard but give no parcel coordinates, so the campus itself is not pinpointed. KWTX; KWTX; Wikipedia

Use: Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Investment800,000,000 USDAnnounced · Campus2022-03-31KWTX; Daily Commercial News (ConstructConnect)
Investment1,200,000,000 USDAnnounced · Campus2026-07-22Meta's fact sheet gives USD 1.2 billion; KWTX describes the investment as more than USD 1.2 billion once completed.Meta Platforms; KWTX
Land area393 acresReported · Campus2022-03-31KWTX
Floor areaabout 900,000 sq_ftPlanned · Campus2022-03-31Original 2022 plan.KWTX; Daily Commercial News (ConstructConnect)
Floor areamore than 760,000 sq_ftOperational · Campus2026-07-22Size of the facility as opened in July 2026.KWTX
Buildings2 countOperational · Campus2026-07-22KWTX describes the opened facility as two buildings; it does not say whether both are already in service.KWTX
Jobs constructionmore than 1,200 countReported · Campus2026-07-22Skilled trade workers on site at peak construction; Meta's fact sheet gives 1,200, KWTX more than 1,200, and a 2022 trade report about 1,250 over two years.Meta Platforms; KWTX; Daily Commercial News (ConstructConnect); KWTX
Jobs permanentabout 100 countPlanned · Campus2026-07-22Meta Platforms; KWTX; KWTX

Companies and organizations

NameRoleNotesSources
Meta PlatformsDeveloperMeta Platforms; KWTX
Meta PlatformsOperatorKWTX
Temple Economic Development CorporationGovernmentIssued the announcement and, with the City of Temple, granted a partial 10-year property tax abatement.KWTX; Daily Commercial News (ConstructConnect)
City of TempleGovernmentGranted a partial property tax abatement; Meta says it pays the full cost of the city's water and wastewater service to the site.Meta Platforms; Daily Commercial News (ConstructConnect)

Timeline

DateEventActual or plannedNotesSources
2022-03-31AnnouncedActualKWTX
2022Construction startedActualWork was expected to begin in spring 2022.Meta Platforms; KWTX; KWTX
2023OtherActualConstruction restarted after the project was redesigned.KWTX
2026-07First operationalActualKWTX reported the facility open and operational in July 2026; a 2022 trade report had expected completion in 2024.Daily Commercial News (ConstructConnect); KWTX

KWTX reported the opening in July 2026 without saying whether both buildings are in service. Meta's fact sheet (s1) shows no publication date; its embedded file creation date is 2026-09-02. The investment figure rose from USD 800 million at announcement to USD 1.2 billion; sources do not explain the increase beyond the redesign.

Sources for these details
Companies
  • Developer: Meta Platforms (unknown scope) evidence
  • Developer: Meta Platforms (unknown scope) evidence
  • Operator: Meta Platforms (unknown scope) evidence
  • Government: Temple Economic Development Corporation (unknown scope) evidence
  • Government: Temple Economic Development Corporation (unknown scope) evidence
  • Government: City of Temple (unknown scope) evidence
  • Government: City of Temple (unknown scope) evidence
Source and location review
Status source
Meta goes live in Temple with $1.2 billion AI data center evidence row
KWTX · published 2026-07-22 · News
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 97 days before the data update on 2026-10-27

Location details
Coordinates
31.10560, -97.42080
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Coordinates are the Temple city coordinates from its Wikipedia page. Sources place the site off NW H K Dodgen Loop and Industrial Boulevard but give no parcel coordinates, so the campus itself is not pinpointed.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
24883aba

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Meta Temple Data Center
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Facebook parent company to invest $800 million in Central Texas
Archived copy
KWTX
News
Imported: Geometry, Imported: Record, Metric: Floor Area, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Metric: Land Area, Milestone: Announced, Milestone: Construction Started, Role: Developer, Role: Governmentsource-terms-not-recordedKWTX5c5e9e263727239e2efb8e18cd27874eaa4c3c35b3f3414f6679fdf294a5dc21
Factual source record; not the publisher page
Meta goes live in Temple with $1.2 billion AI data center
Archived copy
KWTX
News
Imported: Geometry, Imported: Record, Imported: Status, Metric: Buildings, Metric: Floor Area, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Milestone: Construction Started, Milestone: First Operational, Milestone: Other, Operator claimsource-terms-not-recordedKWTXe895651fa6d5cb6c3be87ecf4fa86d5a5c7e149a701e3f1ffa4075fa3698f6fa
Factual source record; not the publisher page
Meta Temple Data Center fact sheet
Archived copy
Meta Platforms
Company disclosure
Imported: Record, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Milestone: Construction Started, Role: Developer, Role: Governmentnot statedsource-terms-not-recordedMeta Platformsc167b2399b799d1717b56fe1bdb09b1cd3e2327ff491d516d251a23c37c5bead
Factual source record; not the publisher page
Meta's data centre in Temple is part of Texas' growth trend
Archived copy
Daily Commercial News (ConstructConnect)
Trade publication
Imported: Record, Metric: Floor Area, Metric: Investment, Metric: Jobs Construction, Milestone: First Operational, Role: Governmentsource-terms-not-recordedDaily Commercial News (ConstructConnect)f7109d203775b2a88711511e44473a51bd97bcffb27c5496cd4bdddc3ead67de
Factual source record; not the publisher page
Temple, Texas
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipediae88b2936907a3f6e1388a3455de8579c2ba2b27eb095d2fd349144f07faa8789
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Meta Temple Data Center [site vcc-site-6afd5a936ac72410543b]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6afd5a936ac72410543b/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction