Lambda Kansas City AI factory
Announced
United States · 1 project · Last reported
Summary
Lambda announced in October 2025 that it would redevelop a vacant facility built in 2009 in the Northland area of Kansas City, Missouri, into an AI factory, as developer, operator and sole tenant. The site was to launch in early 2026 with 24 MW and more than 10,000 NVIDIA Blackwell Ultra GPUs serving one unnamed customer under a multi-year contract for AI training and inference, with potential to grow beyond 100 MW. No investment figure or street address was disclosed, and no later update on the site's opening was found.
Source record as of 2025-10-28 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 39.09970, -94.57830 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Town or locality reference only; the facility position is not established.
Projects (1)
Lambda Kansas City AI factory
Announced last observed as of · Reported status
Location: Kansas City, Missouri, US. City centroid from Wikipedia (s2). The announcement places the facility in the Northland part of Kansas City but gives no address, so the point is not at the site. Lambda; Wikipedia
Use: Ai training, Ai inference
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | 24 MW | Planned · Phase · Unspecified · Initial launch | 2025-10-28 | Lambda | |
| Power capacity | more than 100 MW | Planned · Campus · Unspecified | 2025-10-28 | Described as potential future scale. | Lambda |
| Accelerators | more than 10,000 count | Planned · Phase · Initial launch | 2025-10-28 | The footprint was expected to double over time. | Lambda |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| Lambda | Developer | Lambda | |
| Lambda | Operator | Lambda | |
| Lambda | Tenant | Described as the sole tenant; the capacity serves one unnamed Lambda customer. | Lambda |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2025-10-28 | Announced | Actual | Lambda | |
| 2026 | First operational | Planned | Launch was expected in early 2026; no confirmation of opening was found. | Lambda |
Sources for these details
- Lambda Doubles Down on Midwest Expansion, To Build AI Factory in Kansas City, MO — Lambda; 2025-10-28
- Kansas City, Missouri — Wikipedia; publication date not stated · Archived source
- Companies
Source and location review
- Status source
- Lambda Doubles Down on Midwest Expansion, To Build AI Factory in Kansas City, MO evidence row
Lambda · published 2025-10-28 · Company disclosure - Locator
- Locality reference only · Compiled location reference · locality evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 364 days before the data update on 2026-10-27
Location details
- Coordinates
- 39.09970, -94.57830
- Geometry licence
- source-terms-not-recorded
- Use scope
- Locality reference only
- Scope class
- locality
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- City centroid from Wikipedia (s2). The announcement places the facility in the Northland part of Kansas City but gives no address, so the point is not at the site.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- 6846ad0f
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Kansas City, Missouri Archived copy | Wikipedia Other | Imported: Geometry, Imported: Record | not stated | source-terms-not-recorded | Wikipedia | 0be267d63abfe787f09af8f04b84571a3b0163dabe7fe14c5aab41dfb4f688cbFactual source record; not the publisher page | |
| Lambda Doubles Down on Midwest Expansion, To Build AI Factory in Kansas City, MO Archived copy | Lambda Company disclosure | Imported: Geometry, Imported: Record, Imported: Status, Metric: Accelerators, Metric: Power Capacity, Milestone: Announced, Milestone: First Operational, Role: Developer, Operator claim, Tenant claim | source-terms-not-recorded | Lambda | b946fd7accfe27e7ed5139cc3a4a71bc59ed7452589d27180bb7b8dd306f120bFactual source record; not the publisher page |
Cite this site
Kyars, K. (2026). Lambda Kansas City AI factory [site vcc-site-e305b394a907f57f2639]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e305b394a907f57f2639/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction