The Barn Stargate Data Center Campus

Under construction

United States · 1 project · Last reported

Summary

Related Digital is building The Barn, a 250-acre campus of three single-story buildings in Saline Township, Michigan, exclusively for Oracle, serving OpenAI under the Oracle-OpenAI Stargate expansion. Announced in October 2025 at more than 1 GW, it is described in later coverage as 1.4 GW. DTE Energy is to supply all power, alongside new battery storage paid for by the project. State regulators approved DTE's contracts for the campus in December 2025. In June 2026 the partners marked construction with all buildings under way and the first nearing completion. Walbridge is general contractor; financing mixes Related Digital and Blackstone-affiliated equity with PIMCO-anchored debt.

Source record as of 2026-08-02 · Details and sources

Oracle reports more than2000 skilled tradespeople currently building The Barn and one million craft hours reached recently. Precise anniversary/milestone day is unspecified; current construction statement is datedSeptember28. evidence

Oracle · published 2026-09-28

Location

The interactive map needs JavaScript. Display anchor: 42.12393, -83.88209 (Polygon locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (1)

The Barn Stargate Current Data Center Build

Under construction last observed as of · Authoritative status update

This record reports under construction as of 2026-08-02. Oracle, Related Digital, Blackstone, OpenAI and Walbridge (via WebWire); Spectrum News

Location: Saline Township, Washtenaw County, Michigan, US. Sources place the site entrance off Michigan Avenue, and news photos show the campus from West Michigan Avenue and from Braun Road on its back side. The point lies on West Michigan Avenue in Saline Township near the line of Braun Road, derived from OpenStreetMap Nominatim road geometry; the county is named in the June 2026 release. It is not a surveyed parcel location. Related Companies; Oracle, Related Digital, Blackstone, OpenAI and Walbridge (via WebWire); Spectrum News

Use: Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacitymore than 1,000 MWPlanned · Campus · Unspecified2025-10-30Figure given at announcement.Related Companies
Power capacity1,400 MWPlanned · Campus · Unspecified2026-08-02Figure used in news coverage of the DTE contract approval and later construction; the articles do not say whether it is IT load or total demand.Spectrum News; Spectrum News
Power capacityabout 1,400 MWPlanned · Campus · Facility2026-04-17Analyst estimate, not a company disclosure: Epoch AI's projection of total facility power.Epoch AI
Investmentmore than 5,000,000,000 USDAnnounced · Campus2026-06-01Planned site construction spending cited by the project team; the overall project is described only as multi-billion-dollar.Oracle, Related Digital, Blackstone, OpenAI and Walbridge (via WebWire)
Investmentmore than 43,000,000,000 USDReported · Campus2026-08-02Spectrum News reported that an original $4.8 billion cost estimate had risen and the project was now valued at more than $43 billion; the article does not attribute the figure to a named source, and no company source opened here confirms it.Spectrum News
Land areaabout 250 acresPlanned · Campus2025-10-30Related Digital also plans to preserve more than 750 adjacent acres as open space, farmland and wetlands.Related Companies; Oracle, Related Digital, Blackstone, OpenAI and Walbridge (via WebWire)
Buildings3 countUnder construction · Campus2026-06-01Related Companies; Oracle, Related Digital, Blackstone, OpenAI and Walbridge (via WebWire)
Floor areaabout 550,000 sq_ftUnder construction · Phase · Each of the three buildings2026-06-01Related Companies; Oracle, Related Digital, Blackstone, OpenAI and Walbridge (via WebWire)
Jobs constructionmore than 2,500 countPlanned · Campus2025-10-30Union construction jobs; more than 700 Michigan tradespeople were on site in June 2026.Related Companies; Oracle, Related Digital, Blackstone, OpenAI and Walbridge (via WebWire)
Jobs permanentmore than 450 countPlanned · Campus2025-10-30On-site jobs; the developers also project more than 1,500 county-wide jobs.Related Companies; Oracle, Related Digital, Blackstone, OpenAI and Walbridge (via WebWire)

Companies and organizations

NameRoleNotesSources
Related DigitalDeveloperRelated Companies; Oracle, Related Digital, Blackstone, OpenAI and Walbridge (via WebWire)
Related DigitalInvestorProvides equity alongside Blackstone-affiliated funds.Oracle, Related Digital, Blackstone, OpenAI and Walbridge (via WebWire)
OracleTenantThe campus is being developed exclusively for Oracle, and the first buildings are slated for delivery to Oracle.Related Companies; Oracle, Related Digital, Blackstone, OpenAI and Walbridge (via WebWire)
OpenAITenantOracle's Stargate partner; the campus is described as purpose-built for Oracle and OpenAI.Oracle, Related Digital, Blackstone, OpenAI and Walbridge (via WebWire)
WalbridgeBuilderGeneral contractor.Related Companies; Oracle, Related Digital, Blackstone, OpenAI and Walbridge (via WebWire)
BlackstoneInvestorEquity through affiliated funds.Oracle, Related Digital, Blackstone, OpenAI and Walbridge (via WebWire)
PIMCOInvestorPIMCO-managed funds and accounts anchor the fixed-rate, long-term debt financing.Oracle, Related Digital, Blackstone, OpenAI and Walbridge (via WebWire)
DTE EnergyUtilityRelated Companies; Spectrum News
Michigan Public Service CommissionGovernmentApproved DTE's energy contracts to serve the campus.Spectrum News

Timeline

DateEventActual or plannedNotesSources
2025-10-30AnnouncedActualRelated Companies
2025-12-18OtherActualThe Michigan Public Service Commission unanimously approved DTE's energy contracts to serve the campus, reviewing them on an ex parte basis.Spectrum News
2025-Q4Construction startedActualAnalyst estimate from imagery by Epoch AI, not a company disclosure; the developer had said construction would begin in early 2026 after regulatory approval.Related Companies; Epoch AI
2026-06-01OtherActualConstruction celebration with the governor; all buildings under construction and the first nearing completion.Oracle, Related Digital, Blackstone, OpenAI and Walbridge (via WebWire)
2028-Q4Fully operationalPlannedAnalyst estimate by Epoch AI, not a company date.Epoch AI

Power supply

TypeDescriptionSources
GridDTE Energy is to supply all of the campus's electricity from existing resources under long-term contracts approved by state regulators.Related Companies; Spectrum News; Oracle, Related Digital, Blackstone, OpenAI and Walbridge (via WebWire)
Battery storageNew battery storage financed entirely by the project supplements DTE's supply.Related Companies; Oracle, Related Digital, Blackstone, OpenAI and Walbridge (via WebWire)

Local residents have continued to oppose the project at township and state regulator meetings. Cost figures in the record differ widely and may reflect different scopes. Epoch AI figures and dates are analyst estimates, not company disclosures.

Sources for these details
Companies
  • Customer: OpenAI (intended) evidence
  • Customer: Oracle (intended) evidence
  • Developer: Related Digital (unknown scope) evidence
  • Developer: Related Digital (unknown scope) evidence
  • Investor: Related Digital (unknown scope) evidence
  • Tenant: Oracle (unknown scope) evidence
  • Tenant: Oracle (unknown scope) evidence
  • Tenant: OpenAI (unknown scope) evidence
  • Builder: Walbridge (unknown scope) evidence
  • Builder: Walbridge (unknown scope) evidence
  • Investor: Blackstone (unknown scope) evidence
  • Investor: PIMCO (unknown scope) evidence
  • Utility: DTE Energy (unknown scope) evidence
  • Utility: DTE Energy (unknown scope) evidence
  • Government: Michigan Public Service Commission (unknown scope) evidence
Workloads
  • AI (unspecified) (intended; company disclosure, as of 2026-06-01) evidence
Source and location review
Status source
Oracle: current construction at The Barn, September28,2026 evidence row
Oracle · published 2026-09-28 · Company disclosure
Locator
Campus locator · Community mapped · reviewed_openstreetmap_named_website_tagged_barn_construction_site_polygon evidence
Source checks

Imagery review: visible change, follow-up only tracked_identity_bound_visible_change_followup_only_no_construction_claim
An imagery review bound to this project saw visible change. It is kept for follow-up only and is not used as evidence of construction. No construction, completion or progress claim is made from imagery. · no independent imagery verification

Status age at review: 29 days before the data update on 2026-10-27

Location details
Coordinates
42.12393, -83.88209
Geometry licence
ODbL-1.0
Use scope
Campus locator
Scope class
reviewed_openstreetmap_named_website_tagged_barn_construction_site_polygon
Authority
Community mapped
Source entity
Campus
Method
openstreetmap_named_website_tagged_construction_site_polygon_as_campus_locator
Derivation
cross_source_overlay
Precision scope
The frozen global-open-v3 Polygon is a contributor-mapped construction-site locator for the named Barn data-center campus, inherited by the current-build project through the explicit v14 project_targets relationship. It is not an official, cadastral, or survey boundary; a verified complete 250-acre campus extent; a building or project footprint; a construction extent; or a source of lifecycle, capacity, energy, operating-status, or imagery claims.
Horizontal uncertainty
Not reported

OpenStreetMap does not state horizontal positional accuracy; community-mapped geometry is not a cadastral or survey product.

Geometry evidence
2c1a0857

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for The Barn Stargate Data Center Campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Michigan Public Service Commission approves DTE contracts for proposed Saline Township data center
Archived copy
Spectrum News
News
Imported: Record, Metric: Power Capacity, Milestone: Other, Power Source: Grid, Role: Government, Role: Utilitysource-terms-not-recordedSpectrum News3ac20b743ccc1b3056cea1256b9b82da9a09f14967dfb690678837a79786be9b
Factual source record; not the publisher page
OpenAI Stargate: where the US sites stand
Archived copy
Epoch AI
Analyst report
Imported: Record, Metric: Power Capacity, Milestone: Construction Started, Milestone: Fully Operationalsource-terms-not-recordedEpoch AIcf36d5202ce72167b03d124b9e519142b5925e48ae4571f0a9f0a14298189445
Factual source record; not the publisher page
OpenAI, Oracle and Related Digital announce Stargate data center site in Michigan
Archived copy
Related Companies
Company disclosure
Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Floor Area, Metric: Jobs Construction, Metric: Jobs Permanent, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Milestone: Construction Started, Power Source: Battery Storage, Power Source: Grid, Role: Builder, Role: Developer, Tenant claim, Role: Utilitysource-terms-not-recordedRelated Companies2b355251b9b0808782bbfddf549391ee64205b47cccb6166e033ae721f6e28a0
Factual source record; not the publisher page
OpenStreetMap way 1528327802: The Barn Data Center
Archived copy
OpenStreetMap contributors
OpenStreetMap
GeometryODbL-1.0© OpenStreetMap contributors04f03a496617fcc7159f1762127d29f861002822d76203c2cceda97689a309e7
Retained source material; see source provenance
Oracle, Related Digital, Blackstone, OpenAI, Walbridge and Governor Whitmer Celebrate Construction of Stargate Campus in Saline Township
Archived copy
Oracle, Related Digital, Blackstone, OpenAI and Walbridge (via WebWire)
Company disclosure
Imported: Geometry, Imported: Record, Imported: Status, Metric: Buildings, Metric: Floor Area, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Metric: Land Area, Milestone: Other, Power Source: Battery Storage, Power Source: Grid, Role: Builder, Role: Developer, Role: Investor, Tenant claimsource-terms-not-recordedOracle, Related Digital, Blackstone, OpenAI and Walbridge (via WebWire)a2b265531a1b33e2cb7523d4f172cffb4969de5ec4dbaaa708748dcffd918cdf
Factual source record; not the publisher page
Oracle: current construction at The Barn, September28,2026
Archived copy
Oracle
Company disclosure
Physical statusall-rights-reservedOracleb8b074eef24186566d2fdb50c7fff36d211ff0f0ada123157fc1cf4c474e262b
Retained source material; see source provenance
PHOTOS: Construction continues on Related Digital's Saline Township data center
Archived copy
Spectrum News
News
Imported: Geometry, Imported: Record, Imported: Status, Metric: Investment, Metric: Power Capacitysource-terms-not-recordedSpectrum News3161c6b160e251c938240be8b48c27ffd0ace84e40abadda8ae9e0ac4e0a2524
Factual source record; not the publisher page
Related Digital, Blackstone, Oracle, OpenAI, Walbridge and Governor Whitmer celebrate construction of Stargate campus in Saline Township
Archived copy
Related Digital
Company disclosure
Physical status, Customer claim, Workload, Intended workloadall-rights-reservedRelated Digitala887982bd207937237fb61986c2343680ff963c9826660a5ca37e649347b2bda
Retained source material; see source provenance
Cite this site

Kyars, K. (2026). The Barn Stargate Data Center Campus [site vcc-site-249f52c31025c0aa2ef2]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-249f52c31025c0aa2ef2/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction