Google's second Iowa data center campus, under construction at Alliant Energy's Big Cedar Industrial Center in Cedar Rapids, Linn County, where QTS has also announced a data center. Google confirmed the campus in May 2025 alongside a $7 billion two-year Iowa investment that also funds expansion in Council Bluffs; Google has not said how much goes to Cedar Rapids. Trade reporting said the first building would be finished in 2026, with four more planned and over 1,200 construction workers. Epoch AI, using satellite imagery and permit data, projects three buildings with about 261 MW of IT power and a capital cost near $9.9 billion by Q2 2027; these are analyst projections, not company figures.

Source record as of 2026-10-05 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 41.91720, -91.72540 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Approximate site reference; the exact facility position is unverified.

Projects (1)

Google Cedar Rapids data center campus (Big Cedar Industrial Center)

Under construction last observed as of · Reported status

Location: Cedar Rapids, Linn County, Iowa, US. OpenStreetMap point for the Big Cedar Industrial Center in Cedar Rapids, which the site owner names as the campus location; the Google parcel within the industrial center is not pinpointed. Alliant Energy

Use: Cloud, Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacityabout 261 MWPlanned · Campus · It load2026-10-05Analyst projection of IT power for three buildings by Q2 2027, derived from satellite imagery, permits and equipment counts; Google has not published a capacity figure.Epoch AI
Power capacityabout 87 MWPlanned · Phase · It load · Building 12026-10-05Analyst projection for the first building, which the analyst expects online around the end of 2026.Epoch AI
Investmentabout 9,900,000,000 USDReported · Campus2026-10-05Analyst projection of total capital cost by Q2 2027; the page does not say what the figure includes and it is not a company-announced figure.Epoch AI
Buildings5 countPlanned · Campus2025-06-06A first building plus four more planned in later phases.ConstructConnect
Jobs constructionmore than 1,200 countPlanned · Campus2025-06-06ConstructConnect
Jobs permanent100 countPlanned · Campus2025-06-06Operational employees expected once the campus runs.ConstructConnect

Companies and organizations

NameRoleNotesSources
GoogleDeveloperGoogle; Alliant Energy; Google
GoogleOwnerEpoch AI

Timeline

DateEventActual or plannedNotesSources
2024-06-14Construction startedActualDate land clearing began, per analyst review of satellite imagery.Epoch AI
2025-05-30AnnouncedActualGoogle confirmed the Cedar Rapids campus with its $7 billion Iowa investment announcement.Google; Alliant Energy
2026First operationalPlannedTrade press reported first-building completion expected in 2026; the analyst projection puts Building 1 online around the end of 2026.ConstructConnect; Epoch AI

The $7 billion figure is an Iowa-wide two-year commitment shared with the Council Bluffs expansion and is not recorded as a campus investment. Power and cost figures here are Epoch AI estimates (projections from satellite imagery, permits and grid data), not company figures, and should be replaced if Google or regulators publish figures. Status rests on the analyst page, last updated 2026-10-05.

Sources for these details
Companies
  • Developer: Google (unknown scope) evidence
  • Developer: Google (unknown scope) evidence
  • Developer: Google (unknown scope) evidence
  • Owner: Google (unknown scope) evidence
Source and location review
Status source
Google Cedar Rapids | AI data centers evidence row
Epoch AI · published 2026-10-05 · Analyst report
Locator
Approximate site reference · Compiled location reference · approximate_site evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 22 days before the data update on 2026-10-27

Location details
Coordinates
41.91720, -91.72540
Geometry licence
source-terms-not-recorded
Use scope
Approximate site reference
Scope class
approximate_site
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
OpenStreetMap point for the Big Cedar Industrial Center in Cedar Rapids, which the site owner names as the campus location; the Google parcel within the industrial center is not pinpointed.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
b4f744ea

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Google Cedar Rapids data center campus (Big Cedar Industrial Center)
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Google Announces Data Center Project at Big Cedar Industrial Center
Archived copy
Alliant Energy
Utility disclosure
Imported: Geometry, Imported: Record, Milestone: Announced, Role: Developernot statedsource-terms-not-recordedAlliant Energydce63e60672e337734dc18f6dd1a9f5c0d4c5ce7ea288a1d969eaa52e5ba6b5a
Factual source record; not the publisher page
Google Cedar Rapids | AI data centers
Archived copy
Epoch AI
Analyst report
Imported: Record, Imported: Status, Metric: Investment, Metric: Power Capacity, Milestone: Construction Started, Milestone: First Operational, Owner claimsource-terms-not-recordedEpoch AI40318f4886cd6191b7615dbd1aa47bda8c3d131e631dcee4e846e214afb675a2
Factual source record; not the publisher page
Google Doubles Down on Iowa with $7 Billion Data Center Investment
Archived copy
ConstructConnect
Trade publication
Imported: Record, Metric: Buildings, Metric: Jobs Construction, Metric: Jobs Permanent, Milestone: First Operationalsource-terms-not-recordedConstructConnectc7fbc4d51dcdb0949bb40f43f57e40480ebe745d04eae054468829dc3cf52c01
Factual source record; not the publisher page
How Google is driving a new era of American innovation in Iowa
Archived copy
Google
Company disclosure
Imported: Record, Milestone: Announced, Role: Developersource-terms-not-recordedGoogle85d992900df65402b060c702f4e0ebee3bcdba8431d14f90e403b1911d96270d
Factual source record; not the publisher page
Iowa - Google Data Center Location
Archived copy
Google
Company disclosure
Imported: Record, Role: Developernot statedsource-terms-not-recordedGooglece8faab28b6c9f33cc3d8359c725866bb7586513d1cbecc84eff7583331b762d
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Google Cedar Rapids data center campus (Big Cedar Industrial Center) [site vcc-site-5878345369c98c058193]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5878345369c98c058193/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction