Core Scientific Muskogee data center campus

Partially operational

United States · 1 project · Last reported

Summary

Core Scientific high-density colocation campus at 1525 West 43rd Street South in Muskogee, Oklahoma, served by Oklahoma Gas & Electric. A 70 MW building designed for Nvidia GB300 systems is leased to CoreWeave and was billing by mid-July 2026, and a second building of about 82 MW, now leased to AMD, is under construction for delivery from the second half of 2027. In May 2026 Core Scientific announced plans to grow the campus to about 1.5 GW of gross power, about 1.0 GW leasable, on about 250 acres, and in August 2026 it closed the purchase of Polaris DS, which holds about 440 MW of in-service OG&E grid capacity.

Source record as of 2026-07-28 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 35.74330, -95.35670 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Core Scientific Muskogee data center campus

Partially operational last observed as of · Reported status

Location: Muskogee, Muskogee County, Oklahoma, US. Core Scientific gives the street address 1525 West 43rd Street South, Muskogee. No geocoder was used, so coordinates are the Muskogee city point from its Wikipedia article, which also names the county. Core Scientific; Core Scientific; Wikipedia

Use: Ai unspecified, Hpc

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity100 MWContracted · Phase · Grid connection · Original Muskogee 1 site2026-03-02Gross utility power capacity from OG&E listed in the 10-K; the company site page also describes a 100 MW development with a substation able to support more than 500 MW.Core Scientific; Core Scientific, Inc. via SEC EDGAR
Power capacityabout 70 MWOperational · Phase · Unspecified · Building 1 (CoreWeave)2026-07-28Leased capacity reported as billing by mid-July 2026. Core Scientific does not say whether the figure is critical IT load.Core Scientific; Core Scientific
Power capacityabout 82 MWContracted · Phase · Unspecified · Building 2 (AMD)2026-07-28Building under construction since at least May 2026, when it was described as an unleased 82.5 MW building; leased to AMD in July 2026.Core Scientific; Core Scientific; Core Scientific
Power capacityabout 440 MWOperational · Phase · Grid connection · Polaris DS capacity2026-08-14In-service gross grid capacity held by Polaris DS LLC under electric service agreements with OG&E, acquired by Core Scientific to support the expansion.Core Scientific; Core Scientific
Power capacityabout 1,500 MWPlanned · Campus · Unspecified2026-08-14Planned gross power from a mix of grid and behind-the-meter supply, which the company equates to about 1.0 GW of leasable power. Gross power is not defined as IT or facility load.Core Scientific; Core Scientific; Data Center Knowledge
Land area65 acresReported · Phase · Muskogee 1 campus footprint2026-10-09From the undated company site page, accessed 2026-10-09.Core Scientific
Land areaabout 250 acresReported · Phase · Land secured for planned expansion2026-05-06Described as secured to support the planned expansion; the sources do not say whether it is owned or held under option.Core Scientific; Data Center Knowledge

Companies and organizations

NameRoleNotesSources
Core ScientificDeveloperCore Scientific; Core Scientific; Core Scientific
Core ScientificOperatorCore Scientific; Core Scientific, Inc. via SEC EDGAR
CoreWeaveTenantNamed as tenant of the roughly 70 MW first building only in the Q2 2026 earnings presentation (s4). The May 2026 release (s3) describes that leased building, designed for the Nvidia GB300 platform, without naming the customer.Core Scientific; Core Scientific
AMDTenantNamed for Muskogee only in the Q2 2026 earnings presentation (s4), which lists about 82 MW at this AMD direct site. The Q2 release (s8) gives the 15-year term for about 530 MW across five sites without naming them.Core Scientific; Core Scientific
Oklahoma Gas & ElectricUtilityCore Scientific, Inc. via SEC EDGAR; Core Scientific; Core Scientific

Timeline

DateEventActual or plannedNotesSources
2026First operationalActualThe 70 MW CoreWeave building was in final testing in May 2026 with delivery targeted for Q2 2026, and was billing by mid-July 2026.Core Scientific; Core Scientific
2026-05-06Expansion announcedActualPlan to scale the campus to about 1.5 GW of gross power and agreement to buy Polaris DS.Core Scientific; Data Center Knowledge
2026-07-28OtherActualCore Scientific disclosed AMD leases including about 82 MW at Muskogee.Core Scientific
2026-08-14OtherActualAcquisition of Polaris DS completed for about USD 444 million in cash.Core Scientific
2027-H2OtherPlannedTarget for initial delivery of the roughly 82 MW AMD building; the May 2026 release gave Q4 2027.Core Scientific; Core Scientific; Core Scientific

Power supply

TypeDescriptionSources
GridGrid power from Oklahoma Gas & Electric, including about 440 MW of in-service capacity under Polaris DS service agreements; load studies for more grid capacity were due to finish in 2026.Core Scientific, Inc. via SEC EDGAR; Core Scientific; Core Scientific
OtherCore Scientific says it has a plan for a scalable behind-the-meter power solution to supplement grid supply, without naming the fuel or size.Core Scientific

Core Scientific's Q2 2026 presentation lists about 917 MW of further power pipeline at Muskogee in two entries without saying how much is grid or behind-the-meter. The AMD agreements are 15-year leases for about 530 MW across five Core Scientific sites; per-site splits come from the company's earnings presentation.

Sources for these details
Companies
  • Developer: Core Scientific (unknown scope) evidence
  • Developer: Core Scientific (unknown scope) evidence
  • Developer: Core Scientific (unknown scope) evidence
  • Operator: Core Scientific (unknown scope) evidence
  • Operator: Core Scientific (unknown scope) evidence
  • Tenant: CoreWeave (unknown scope) evidence
  • Tenant: CoreWeave (unknown scope) evidence
  • Tenant: AMD (unknown scope) evidence
  • Tenant: AMD (unknown scope) evidence
  • Utility: Oklahoma Gas & Electric (unknown scope) evidence
  • Utility: Oklahoma Gas & Electric (unknown scope) evidence
  • Utility: Oklahoma Gas & Electric (unknown scope) evidence
Source and location review
Status source
Core Scientific Q2 2026 earnings presentation (Form 8-K, Exhibit 99.2) evidence row
Core Scientific · published 2026-07-28 · Regulatory filing
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 91 days before the data update on 2026-10-27

Location details
Coordinates
35.74330, -95.35670
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Core Scientific gives the street address 1525 West 43rd Street South, Muskogee. No geocoder was used, so coordinates are the Muskogee city point from its Wikipedia article, which also names the county.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
cfd03805

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Core Scientific Muskogee data center campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Core Scientific announces second quarter 2026 results
Archived copy
Core Scientific
Company disclosure
Imported: Record, Tenant claimsource-terms-not-recordedCore Scientificb70ec1a285588315094bb4c9fa71ad598c095bae8feb80f667d38aa11d7f73d3
Factual source record; not the publisher page
Core Scientific completes acquisition of Polaris DS, advancing planned Muskogee expansion to 1.5 GW of gross power
Archived copy
Core Scientific
Company disclosure
Imported: Record, Metric: Power Capacity, Milestone: Other, Power Source: Grid, Role: Developer, Role: Utilitysource-terms-not-recordedCore Scientific9d5b5910345d55f30d58a56f885a0a85fadbb437462648b444972c0568ad3737
Factual source record; not the publisher page
Core Scientific plans expansion to 1.5 gigawatts of gross power at Muskogee, Oklahoma campus
Archived copy
Core Scientific
Company disclosure
Imported: Geometry, Imported: Record, Metric: Land Area, Metric: Power Capacity, Milestone: Expansion Announced, Milestone: First Operational, Milestone: Other, Power Source: Grid, Power Source: Other, Role: Developer, Tenant claim, Role: Utilitysource-terms-not-recordedCore Scientific5fc27f1f872ac1555ea6d636e357f49f7f86e4155b50b88f5cbb4ed1a01e2e6a
Factual source record; not the publisher page
Core Scientific Q2 2026 earnings presentation (Form 8-K, Exhibit 99.2)
Archived copy
Core Scientific
Regulatory filing
Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: First Operational, Milestone: Other, Tenant claimsource-terms-not-recordedCore Scientific7679598ab1cebc84c61e67b73e9fa454afe44ca5b45263f83714594f3a8127d0
Factual source record; not the publisher page
Core Scientific's Muskogee bet: can crypto-era infrastructure fuel AI?
Archived copy
Data Center Knowledge
Trade publication
Imported: Record, Metric: Land Area, Metric: Power Capacity, Milestone: Expansion Announcedsource-terms-not-recordedData Center Knowledgec172d899d588a3e2d848fd8d400d54fff19511baaa18c7e84d2f07021911ae94
Factual source record; not the publisher page
Core Scientific, Inc. Form 10-K for the fiscal year ended December 31, 2025
Archived copy
Core Scientific, Inc. via SEC EDGAR
Regulatory filing
Imported: Record, Metric: Power Capacity, Power Source: Grid, Operator claim, Role: Utilitysource-terms-not-recordedCore Scientific, Inc. via SEC EDGARa75005b81dcd522ad3f042c7f25ce3807c03b796bea0edf597ff3035d32c7e5d
Factual source record; not the publisher page
Muskogee 1 high-density data center
Archived copy
Core Scientific
Company disclosure
Imported: Geometry, Imported: Record, Metric: Land Area, Metric: Power Capacity, Role: Developer, Operator claimnot statedsource-terms-not-recordedCore Scientific9a3c84a018d9e79cefeb08989cef5b3ac1393ee52178dc9cdfeb802f691a6acb
Factual source record; not the publisher page
Muskogee, Oklahoma
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia8a6a895d53c5e5cdc8aed41747c25ddcc990aeeb263a3b6678430b8bab32a5c3
Factual source record; not the publisher page