Amazon and STACK campus at Resilient Technology Park, Shreveport

Announced

United States · 1 project · Last reported

Summary

Data center campus that STACK Infrastructure is to develop, own and lease to Amazon at the 313-acre Resilient Technology Park off Greenwood Road in west Shreveport, Louisiana, next to Interstate 20. The City Council approved it after the planning commission had blocked it, and residents sued in January 2026 seeking judicial review. In February 2026 local radio described a USD 10 billion site plan of seven two-story buildings and nearly 3 million sq ft, though other outlets said the site was left out of Amazon's USD 12 billion regional announcement because of the lawsuit. In August 2026 the state announced USD 6 billion for this third campus, raising Amazon's regional plan to USD 18 billion.

Source record as of 2026-08-27 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 32.46390, -93.79440 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Amazon and STACK campus at Resilient Technology Park, Shreveport

Announced last observed as of · Reported status

Location: Shreveport, Caddo Parish, Louisiana, US. Local radio gives 7340 Greenwood Road, and the Shreveport-Bossier Journal places the park off Greenwood Road in west Shreveport next to I-20, but no coordinates are published. The point is the Shreveport city coordinate from its Wikipedia article, not the park. News Radio 710 KEEL; Shreveport-Bossier Journal; Louisiana Economic Development; Wikipedia

Use: Cloud

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Investment6,000,000,000 USDAnnounced · Campus2026-08-18Investment announced by the state for the third northwest Louisiana campus at Resilient Technology Park, on top of the USD 12 billion announced in February for other campuses.Louisiana Economic Development; Institutional Real Estate, Inc.
Investment10,000,000,000 USDReported · Campus2026-02-23Local radio coverage of the February announcement described the Greenwood Road site as a USD 10 billion AI data center. This conflicts with the state's later USD 6 billion figure and with KSLA and the Shreveport-Bossier Journal, which said this site was not part of the February announcement; it is kept for transparency.News Radio 710 KEEL
Land area313 acresReported · Campus2026-08-27Size of Resilient Technology Park as a whole.Shreveport-Bossier Journal; Institutional Real Estate, Inc.
Land areamore than 250 acresPlanned · Campus2026-02-23Area covered by the campus site plan as reported in February 2026, before the 14% footprint reduction reported in August.News Radio 710 KEEL
Buildings7 countPlanned · Campus2026-02-23Two-story buildings in the February 2026 site plan.News Radio 710 KEEL
Floor areaabout 3,000,000 sq_ftPlanned · Campus2026-02-23Reported as nearly 3 million sq ft.News Radio 710 KEEL
Jobs permanent210 countPlanned · Campus2026-08-18Direct new jobs attributed to the third campus; the state estimates 499 more indirect jobs.Louisiana Economic Development

Companies and organizations

NameRoleNotesSources
STACK InfrastructureDeveloperLeads construction and development of Amazon's northwest Louisiana campuses.News Radio 710 KEEL; Shreveport-Bossier Journal; Louisiana Economic Development; Institutional Real Estate, Inc.; KSLA News 12
STACK InfrastructureOwnerLouisiana Economic Development; Institutional Real Estate, Inc.; KSLA News 12
Amazon (Amazon Web Services)TenantThe Shreveport-Bossier Journal says STACK will lease the campuses to Amazon; KSLA calls Amazon the customer and end user, and local radio names AWS as the primary tenant or operator.News Radio 710 KEEL; Shreveport-Bossier Journal; KSLA News 12
AmazonInvestorThe USD 6 billion is presented by the state as Amazon's planned investment; Amazon also funds grid and water upgrades.Louisiana Economic Development
Southwestern Electric Power Company (SWEPCO)UtilityWAFB (KSLA report); Louisiana Economic Development; KSLA News 12
Shreveport City CouncilGovernmentApproved the development after the Shreveport Metropolitan Planning Commission had initially blocked it; residents' January 2026 suit seeks judicial review of that decision.Shreveport-Bossier Journal

Timeline

DateEventActual or plannedNotesSources
2026-01OtherActualThe mayor of Mooringsport and two Caddo Parish residents sued the city seeking judicial review of the City Council's approval; a district court hearing was set for 20 April 2026.Shreveport-Bossier Journal
2026-02-23OtherActualAmazon's USD 12 billion northwest Louisiana plan was announced. Local radio listed the Greenwood Road site among its campuses, while KSLA and the Shreveport-Bossier Journal said this site was left out of the USD 12 billion because of the pending litigation.News Radio 710 KEEL; Shreveport-Bossier Journal; KSLA News 12
2026-08-18AnnouncedActualThe state announced a USD 6 billion third campus at Resilient Technology Park; trade press reported that the development footprint had been cut by 14% to keep more green space and buffers.Louisiana Economic Development; Institutional Real Estate, Inc.

Power supply

TypeDescriptionSources
GridServed by SWEPCO, with Amazon funding new energy infrastructure and grid upgrades so costs are not passed to existing ratepayers.WAFB (KSLA report); Louisiana Economic Development

Covers only the Resilient Technology Park campus. Amazon's February 2026 USD 12 billion plan covers STACK campuses north of Blanchard on State Line Road (Caddo Parish) and north of Benton near LA 3 (Bossier Parish), with no site-level figures found. Program-wide figures (up to USD 400 million for water, up to 2,250 construction jobs, up to 750 direct jobs) are not campus figures. No megawatt figure was found. The outcome of the April 2026 court hearing could not be confirmed from an independent openable source, so it is not recorded. Sources do not say whether the USD 6 billion replaces the earlier USD 10 billion radio description of this site. IREI's article is partly paywalled.

Sources for these details
Companies
  • Developer: STACK Infrastructure (unknown scope) evidence
  • Developer: STACK Infrastructure (unknown scope) evidence
  • Developer: STACK Infrastructure (unknown scope) evidence
  • Developer: STACK Infrastructure (unknown scope) evidence
  • Developer: STACK Infrastructure (unknown scope) evidence
  • Owner: STACK Infrastructure (unknown scope) evidence
  • Owner: STACK Infrastructure (unknown scope) evidence
  • Owner: STACK Infrastructure (unknown scope) evidence
  • Tenant: Amazon (Amazon Web Services) (unknown scope) evidence
  • Tenant: Amazon (Amazon Web Services) (unknown scope) evidence
  • Tenant: Amazon (Amazon Web Services) (unknown scope) evidence
  • Investor: Amazon (unknown scope) evidence
  • Utility: Southwestern Electric Power Company (SWEPCO) (unknown scope) evidence
  • Utility: Southwestern Electric Power Company (SWEPCO) (unknown scope) evidence
  • Utility: Southwestern Electric Power Company (SWEPCO) (unknown scope) evidence
  • Government: Shreveport City Council (unknown scope) evidence
Source and location review
Status source
Amazon Grows Northwest Louisiana Planned Investment to $18 Billion With New Shreveport Campus evidence row
Louisiana Economic Development · published 2026-08-18 · Government record
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 61 days before the data update on 2026-10-27

Location details
Coordinates
32.46390, -93.79440
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Local radio gives 7340 Greenwood Road, and the Shreveport-Bossier Journal places the park off Greenwood Road in west Shreveport next to I-20, but no coordinates are published. The point is the Shreveport city coordinate from its Wikipedia article, not the park.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
4ce23293

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Amazon and STACK campus at Resilient Technology Park, Shreveport
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Amazon building $12 billion data center in Caddo & Bossier parishes, Gov. Landry announces
Archived copy
WAFB (KSLA report)
News
Imported: Record, Power Source: Grid, Role: Utilitysource-terms-not-recordedWAFB (KSLA report)bba79ccd35c91cd12bb3ecd1aa0798d52719fc5ebe2150346767009a5f56dbbb
Factual source record; not the publisher page
Amazon earmarks $6b for third data center campus in northwest Louisiana
Archived copy
Institutional Real Estate, Inc.
Trade publication
Imported: Record, Imported: Status, Metric: Investment, Metric: Land Area, Milestone: Announced, Role: Developer, Owner claimsource-terms-not-recordedInstitutional Real Estate, Inc.7d35ca7e1590a359210b7619e4d69450db2ecdf4905bcfe6162c5c34f9da6478
Factual source record; not the publisher page
Amazon Grows Northwest Louisiana Planned Investment to $18 Billion With New Shreveport Campus
Archived copy
Louisiana Economic Development
Government record
Imported: Geometry, Imported: Record, Imported: Status, Metric: Investment, Metric: Jobs Permanent, Milestone: Announced, Power Source: Grid, Role: Developer, Role: Investor, Owner claim, Role: Utilitysource-terms-not-recordedLouisiana Economic Developmentd394bb5e6d731c310b71e82b7cae286a71912d2ff1c510266a8f755c7eb5e07a
Factual source record; not the publisher page
Campuses for newly announced Amazon data center spanning Bossier & Caddo parishes confirmed
Archived copy
KSLA News 12
News
Imported: Record, Milestone: Other, Role: Developer, Owner claim, Tenant claim, Role: Utilitysource-terms-not-recordedKSLA News 123ed05a3615b82e58895b24c1518a90b23ed4c9ba6a7660adf9a213599cea4a20
Factual source record; not the publisher page
Court hearing set April 20 in challenge to Shreveport Amazon data center
Archived copy
Shreveport-Bossier Journal
News
Imported: Geometry, Imported: Record, Metric: Land Area, Milestone: Other, Role: Developer, Role: Government, Tenant claimsource-terms-not-recordedShreveport-Bossier Journal36fa93f833f7e90c44a8e8a6119de0c1c6f351a2a30a24b3ad7876328d58950d
Factual source record; not the publisher page
Historic $12 Billion Dollar Investment in Shreveport by Amazon for New Data Centers
Archived copy
News Radio 710 KEEL
News
Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Floor Area, Metric: Investment, Metric: Land Area, Milestone: Other, Role: Developer, Tenant claimsource-terms-not-recordedNews Radio 710 KEEL716b492fc402663f4ebaec7761efb41ed4b588dcfc84cbc1bee3341491fdd5c0
Factual source record; not the publisher page
Shreveport, Louisiana
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia2eb2aef25b033571f71ac94cbae3418aae0d9a8e3836b58f669cc9219c7488b6
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Amazon and STACK campus at Resilient Technology Park, Shreveport [site vcc-site-1246c2b9750b8b4832d2]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1246c2b9750b8b4832d2/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction