Meta Richland Parish Data Center

Under construction

United States · 2 projects · Last reported

Summary

Meta Richland Parish Current Development

Turner reports continuing campus work and active interior buildout in the first buildings at Meta Richland Parish. The later campus expansion is not independently counted. evidence

Turner Construction Company · published 2026-07-16

Meta Richland Parish data center (Hyperion)

Meta campus on the former Franklin Farm megasite in Richland Parish, northeast Louisiana, built to house Hyperion, which Meta calls its largest AI cluster. Announced in December 2024 as a USD 10 billion project, it was placed in late 2025 in a joint venture 80% owned by Blue Owl-managed funds and expanded in July 2026 to a planned 5 GW of IT capacity and more than USD 50 billion of investment. Entergy Louisiana is adding gas-fired generation, batteries and transmission upgrades to serve the site under a 20-year agreement. Construction began in December 2024, and officials expect full build-out around 2036.

Source record as of 2026-07-14 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 32.52892, -91.63608 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (2)

Meta Richland Parish Current Development

Under construction last observed as of · Authoritative status update

Source and location review
Status source
Turner July 16 Richland Parish interior buildout observation evidence row
Turner Construction Company · published 2026-07-16 · Company disclosure
Locator
Campus locator · Community source · community_named_campus_reference_point evidence
Source checks

Not reviewed against imagery not_reviewed_for_core_preview
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 103 days before the data update on 2026-10-27

Meta Richland Parish data center (Hyperion)

Under construction last observed as of · Reported status

Location: Holly Ridge, Richland Parish, Louisiana, US. Sources place the campus on the former Franklin Farm megasite between Rayville and Delhi; the 2026 state release is datelined Holly Ridge and WRKF refers to the Holly Ridge site. Coordinates are the Holly Ridge community point from OpenStreetMap Nominatim, not a surveyed site boundary. Louisiana Economic Development; Louisiana Economic Development; WRKF

Use: Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity5,000 MWPlanned · Campus · It load2026-07-13The state release calls this IT capacity; Meta's fact sheet describes the same 5 GW as compute capacity to house Hyperion, which it calls its largest AI cluster.Louisiana Economic Development; Meta Platforms
Power capacityabout 2,000 MWPlanned · Phase · Unspecified · Initial build targeted by 20302025-11-05Reported before the 2026 expansion as the initial capacity target, with possible growth toward 5 GW.Data Center Frontier
Power capacityabout 2,500 MWPlanned · Campus · Unspecified2025-08-20Power requirement cited in coverage of the August 2025 utility approval, before the 5 GW expansion.KALB
Investment10,000,000,000 USDAnnounced · Campus2024-12-04Louisiana Economic Development
Investmentabout 27,000,000,000 USDReported · Campus2025-11-05Expected total development cost of the Meta and Blue Owl joint venture, covering buildings and long-lived power, cooling and connectivity infrastructure.Data Center Frontier; KTVE (myarklamiss.com)
Investmentmore than 50,000,000,000 USDAnnounced · Campus2026-07-13Louisiana Economic Development; Meta Platforms
Floor area4,000,000 sq_ftPlanned · Campus2024-12-04Louisiana Economic Development
Floor areaabout 10,000,000 sq_ftPlanned · Campus2026-07-13Described as nearly 10 million square feet after the 2026 expansion.Louisiana Economic Development
Land area2,250 acresReported · Campus2024-12-04Louisiana Economic Development
Land areamore than 3,200 acresReported · Campus2026-07-14Eventual footprint reported after the 2026 expansion.WRKF
Jobs construction5,000 countPlanned · Campus2024-12-04Peak construction workforce projected at announcement.Louisiana Economic Development
Jobs construction7,500 countPlanned · Campus2026-07-13Peak construction workforce projected after the expansion.Louisiana Economic Development
Jobs permanentat least 500 countPlanned · Campus2024-12-04Louisiana Economic Development
Jobs permanentabout 1,000 countPlanned · Campus2026-07-13Louisiana Economic Development; Meta Platforms

Companies and organizations

NameRoleNotesSources
Meta PlatformsDeveloperLouisiana Economic Development; Louisiana Economic Development; Meta Platforms
Meta PlatformsOwnerHolds 20% of the joint venture that owns the campus and keeps the development and property-management role.Data Center Frontier; KTVE (myarklamiss.com)
Meta PlatformsTenantAnchor tenant leasing the facilities from the joint venture.Data Center Frontier
Blue Owl Capital (managed funds)OwnerFunds managed by Blue Owl hold 80% of the joint venture formed in late 2025.Data Center Frontier; KTVE (myarklamiss.com)
PIMCOInvestorLed the debt placements that helped finance the joint venture.Data Center Frontier
Entergy LouisianaUtilityLouisiana Economic Development; KALB; Louisiana Economic Development
Turner Construction CompanyBuilderNamed as a general contractor.Data Center Frontier
DPR ConstructionBuilderNamed as a general contractor.Data Center Frontier
MortensonBuilderNamed as a general contractor.Data Center Frontier
Louisiana Economic DevelopmentGovernmentLouisiana Economic Development; Louisiana Economic Development

Timeline

DateEventActual or plannedNotesSources
2024-12-04AnnouncedActualLouisiana Economic Development
2024-12Construction startedActualThe state said site work would begin in December; later reporting dates the groundbreaking to December 2024.Louisiana Economic Development; WRKF
2025-08OtherActualThe Louisiana Public Service Commission voted 4-1 to approve Entergy Louisiana's three new gas plants tied to the campus, as reported on 2025-08-20.KALB
2025-10OtherActualMeta announced the joint venture with Blue Owl-managed funds at the end of October 2025 and on 21 October cited a development cost of about USD 27 billion.Data Center Frontier; KTVE (myarklamiss.com)
2026-07-13Expansion announcedActualExpansion to 5 GW of IT capacity and more than USD 50 billion of investment.Louisiana Economic Development; WRKF
2030OtherPlannedTarget for roughly 2 GW of initial capacity, as reported before the 2026 expansion.Data Center Frontier
2036Fully operationalPlannedOfficials expect the full build-out of both phases by 2036.WRKF

Power supply

TypeDescriptionSources
GridSupplied by Entergy Louisiana under a 20-year agreement. Regulators approved three new combined-cycle gas units in 2025 (two in Richland Parish, one at Waterford) along with transmission upgrades; the 2026 state release refers to seven new gas plants, while WRKF reports Entergy sought approval for ten. These are utility plants rather than on-site generation.KALB; Data Center Frontier; Louisiana Economic Development; WRKF
Battery storageThree grid-scale battery systems are part of the Entergy arrangement announced with the 2026 expansion.Louisiana Economic Development
NuclearThe 2026 arrangement includes possible nuclear development, including an output increase at Entergy's Waterford 3 plant.Louisiana Economic Development
SolarEntergy was cleared to fast-track up to 1,500 MW of solar; Meta earlier pledged to help bring at least 1,500 MW of new renewables to the grid and in 2026 committed to fund up to 2.5 GW of clean energy.Louisiana Economic Development; Data Center Frontier; Louisiana Economic Development

Meta's fact sheet PDF (s6) shows no publication date; its embedded file creation date is 2026-09-01. The KTVE article (s7) shows only a relative date.

Sources for these details
Companies
  • Developer: Meta Platforms (unknown scope) evidence
  • Developer: Meta Platforms (unknown scope) evidence
  • Developer: Meta Platforms (unknown scope) evidence
  • Owner: Meta Platforms (unknown scope) evidence
  • Owner: Meta Platforms (unknown scope) evidence
  • Tenant: Meta Platforms (unknown scope) evidence
  • Owner: Blue Owl Capital (managed funds) (unknown scope) evidence
  • Owner: Blue Owl Capital (managed funds) (unknown scope) evidence
  • Investor: PIMCO (unknown scope) evidence
  • Utility: Entergy Louisiana (unknown scope) evidence
  • Utility: Entergy Louisiana (unknown scope) evidence
  • Utility: Entergy Louisiana (unknown scope) evidence
  • Builder: Turner Construction Company (unknown scope) evidence
  • Builder: DPR Construction (unknown scope) evidence
  • Builder: Mortenson (unknown scope) evidence
  • Government: Louisiana Economic Development (unknown scope) evidence
  • Government: Louisiana Economic Development (unknown scope) evidence
Source and location review
Status source
Meta Commits More Than $50 Billion for North Louisiana Project, Becoming One of the Largest Data Centers in History evidence row
Louisiana Economic Development · published 2026-07-13 · Government record
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 105 days before the data update on 2026-10-27

Location details
Coordinates
32.52892, -91.63608
Geometry licence
CC-BY-SA-2.0, ODbL-1.0, no-open-license-asserted
Use scope
Campus locator
Scope class
community_named_campus_reference_point
Authority
Community source
Source entity
Campus
Method
nominatim_exact_named_campus_reference_point
Derivation
Use the single exact-name community feature, verify its source object geometry, and emit the unchanged service longitude/latitude in GeoJSON order.
Precision scope
The returned point lies in the northern component of the named three-component campus relation. It represents the overall operator-described campus, not a particular first building, Phase 2 construction, or Laidley/Evest legal parcel. No survey, exact building centroid, active construction footprint or bounded numerical accuracy is claimed.
Horizontal uncertainty
Not reported

Community mapper and geocoder provide no bounded horizontal accuracy; coordinate decimal places are not measurement precision.

Geometry evidence
0357dcf6 5492ab7f 816746dd 90966722 d5e0a9c8

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Meta Richland Parish Data Center
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
As development continues, the cost of Meta's data center in Richland Parish will be 3x more than originally projected
Archived copy
KTVE (myarklamiss.com)
News
Imported: Record, Metric: Investment, Milestone: Other, Owner claimnot statedsource-terms-not-recordedKTVE (myarklamiss.com)21e02ed3af3408c57903ca441089ba7cce2b4f8759837ef8be23a229800257c6
Factual source record; not the publisher page
Exact named Meta Richland Parish Data Center Nominatim point
Archived copy
OpenStreetMap contributors via Nominatim
OpenStreetMap
Site distinctness context, Geometrynot statedODbL-1.0OpenStreetMap contributors via Nominatim619548b627d084a63f05a776ea734cd1c360f4f686b6f58f56feed7d59cc6243
Retained source material; see source provenance
La. regulators approve Entergy power plants for Meta's AI data center
Archived copy
KALB
News
Imported: Record, Metric: Power Capacity, Milestone: Other, Power Source: Grid, Role: Utilitysource-terms-not-recordedKALB824a2a7f0004054368cb6f3478ccfe7c7467a448b85853f187ff797d1ac63869
Factual source record; not the publisher page
Meta Commits More Than $50 Billion for North Louisiana Project, Becoming One of the Largest Data Centers in History
Archived copy
Louisiana Economic Development
Government record
Imported: Geometry, Imported: Record, Imported: Status, Metric: Floor Area, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Metric: Power Capacity, Milestone: Expansion Announced, Power Source: Battery Storage, Power Source: Grid, Power Source: Nuclear, Power Source: Solar, Role: Developer, Role: Government, Role: Utilitysource-terms-not-recordedLouisiana Economic Development87ec24f1852b0b90601a8255f00c1af828218d6e00b7f2f542944d1930bda3d8
Factual source record; not the publisher page
Meta is investing $40B more to expand Richland Parish data center project
Archived copy
WRKF
News
Imported: Geometry, Imported: Record, Imported: Status, Metric: Land Area, Milestone: Construction Started, Milestone: Expansion Announced, Milestone: Fully Operational, Power Source: Gridsource-terms-not-recordedWRKFfa7ee619f1b5d40faf77a1a0bd545dece5a704cd2f6d474fcb6df423204e8261
Factual source record; not the publisher page
Meta Richland Parish campus and contractor identity
Archived copy
Meta
Company disclosure
Geometry identity context, Site distinctness contextnot statedall-rights-reservedMetac2517a573f8fdc76e30b348b60c6edab79abb592e644ad1aa3d6f6a1f3c4d5e0
Retained source material; see source provenance
Meta Richland Parish Data Center fact sheet
Archived copy
Meta Platforms
Company disclosure
Imported: Record, Metric: Investment, Metric: Jobs Permanent, Metric: Power Capacity, Role: Developernot statedsource-terms-not-recordedMeta Platformsc4e2c066eda0f63a7c0e01f824eddde1ca9732d8cc5bdda6004570a29c6038a6
Factual source record; not the publisher page
Meta Richland Parish Data Center source object identity and geometry corroboration
Archived copy
OpenStreetMap contributors
OpenStreetMap
Site distinctness context, Geometrynot statedODbL-1.0OpenStreetMap contributors7b3d653ac4a8ea367cf46cb6261a4af8138f7996cc5f58c3e4a3244bb8eb6ba3
Retained source material; see source provenance
Meta Selects Northeast Louisiana as Site of $10 Billion Artificial Intelligence Optimized Data Center; Governor Jeff Landry Calls Investment 'A New Chapter' for State
Archived copy
Louisiana Economic Development
Government record
Imported: Geometry, Imported: Record, Metric: Floor Area, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Metric: Land Area, Milestone: Announced, Milestone: Construction Started, Power Source: Solar, Role: Developer, Role: Government, Role: Utilitysource-terms-not-recordedLouisiana Economic Developmente97ce5e8a19460a83379d9733c02ddc24afb5988d5eeaba1e12b99ac08a90997
Factual source record; not the publisher page
Meta's $27B Hyperion Campus: A New Blueprint for AI Infrastructure Finance
Archived copy
Data Center Frontier
Trade publication
Imported: Record, Metric: Investment, Metric: Power Capacity, Milestone: Other, Power Source: Grid, Power Source: Solar, Role: Builder, Role: Investor, Owner claim, Tenant claimsource-terms-not-recordedData Center Frontier137cf55f504a17d0c4c70ed593221ccd280dbc44ad6263e895b9f8b7513b4c7a
Factual source record; not the publisher page
Nominatim object geometry WGS84 datum
Archived copy
Nominatim project
Company disclosure
Site distinctness context, Geometrynot statedno-open-license-assertedNominatim project173fa7a8e032ccee5de4412e19d89149a898ee609c1f069253d78c444b7705a6
Retained source material; see source provenance
Nominatim returned point and object reference semantics
Archived copy
Nominatim project
Company disclosure
Site distinctness context, Geometrynot statedno-open-license-assertedNominatim project2b22abff55df61794873a6648149a09a46262c4f409578cb8d6823de3d6b5f7e
Retained source material; see source provenance
OpenStreetMap attribution and ODbL terms
Archived copy
OpenStreetMap Foundation
OpenStreetMap
Site distinctness context, Geometrynot statedCC-BY-SA-2.0OpenStreetMap Foundation6fb8c3041dd598f5d63befa6ef01badc313abbb41f76431e374eafb72723fac0
Retained source material; see source provenance
Turner July 16 Richland Parish interior buildout observation
Archived copy
Turner Construction Company
Company disclosure
Geometry identity context, Site distinctness context, Physical statusall-rights-reservedTurner Construction Companyf9536829eedf4c5226ef71cec78fb4979a3cf05d3368d98cd79b3d52dad569cb
Retained source material; see source provenance
Turner Richland Parish Phase 1 and Phase 2 scope boundary
Archived copy
Turner Construction Company
Company disclosure
Geometry identity context, Site distinctness contextnot statedall-rights-reservedTurner Construction Companyede8a71cb228bb548ac36c9449416356dbfd2c89bd66192b6c601e098e537482
Retained source material; see source provenance
Cite this site

Kyars, K. (2026). Meta Richland Parish Data Center [site vcc-site-33110c77390f92dc4432]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-33110c77390f92dc4432/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction