Amazon Web Services King George County campus (Birchwood site)

Proposed

United States · 1 project · Last reported

Summary

Proposed Amazon Web Services data center campus on about 869 acres at the former Birchwood coal power plant on State Route 3 in the Sealston area of King George County, Virginia. Rezoned in September 2023, it is planned at 7.25 to 7.5 million sq ft, with a first phase of up to eight buildings and about 4 million sq ft and nine more buildings in later phases, and is reported as a USD 6 billion project. The county approved tax incentives in December 2023, but a new board voted in January 2024 to renegotiate them; Amazon sought a vested rights review in 2025, and as of March 2026 the case was pending in circuit court with no construction reported.

Source record as of 2026-10-09 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 38.26140, -77.33190 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Amazon Web Services King George County campus (Birchwood site)

Proposed last observed as of · Reported status

Location: Sealston, King George County, Virginia, US. Coordinates are the Sealston community coordinates from its Wikipedia page. Sources place the campus at the former Birchwood power plant on State Route 3 in the Sealston area but give no parcel coordinates. Bisnow; Fredericksburg Free Press; Wikipedia

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Investmentabout 6,000,000,000 USDReported · Campus2024-01-08Proposed investment reported when the county approved tax incentives in December 2023 and in later local coverage; the sources do not describe it as a commitment in the performance agreement.Bisnow; Fredericksburg Free Press; Baxtel
Land areaabout 869 acresReported · Campus2024-01-08Site area; the rezoning counsel gives about 870 acres.Bisnow; Hirschler; Bisnow; Fredericksburg Free Press; Baxtel
Floor areaup to 7,500,000 sq_ftPlanned · Campus2024-01-08Full build-out over about 15 years.Bisnow; Bisnow; Baxtel
Floor area7,250,000 sq_ftPlanned · Campus2024-03-23Figure given by the rezoning counsel and local press.Hirschler; Fredericksburg Free Press
Floor areaabout 4,000,000 sq_ftPlanned · Phase · Phase 12024-01-08Bisnow; Bisnow
Buildingsup to 8 countPlanned · Phase · Phase 12024-01-08Data center buildings, plus two electrical substations.Bisnow; Bisnow
Buildings9 countPlanned · Phase · Later phases2023-08-14Later phases on neighbouring parcels, adding about 3.5 million sq ft.Bisnow; Baxtel

Companies and organizations

NameRoleNotesSources
Amazon Web ServicesDeveloperNamed as Amazon Data Center Services by its rezoning counsel and as Amazon Web Services (AWS) in local press.Hirschler; Fredericksburg Free Press
Amazon Web ServicesOwnerBought nine parcels for USD 168.8 million in December 2023, per Baxtel; a county supervisor said AWS owns the land.Fredericksburg Free Press; Baxtel
Birchwood Power PartnersDeveloperSubsidiary of J-Power that first proposed the campus at the former power plant site in July 2023.Bisnow; Bisnow
King George County Board of SupervisorsGovernmentApproved the rezoning and a December 2023 performance agreement; a reconstituted board voted in January 2024 to renegotiate it.Bisnow; Fredericksburg Free Press
Dominion EnergyUtilitySaid new substations and transmission lines would be needed but it was not proposing power plants in the county.Fredericksburg Free Press

Timeline

DateEventActual or plannedNotesSources
2023-07AnnouncedActualBirchwood Power Partners proposed the campus; Amazon was identified as the intended user soon after.Bisnow; Bisnow
2023-09Zoning approvedActualHirschler; Bisnow
2023-12-19OtherActualThe outgoing Board of Supervisors approved a performance agreement with tax incentives for the campus.Bisnow; Fredericksburg Free Press
2023-12Site acquiredActualAmazon bought nine parcels for USD 168.8 million, per Baxtel.Baxtel
2024-01OtherActualA reconstituted board voted on 2 January to renegotiate the performance agreement; a letter from Amazon's lawyer argued the vote did not affect the agreement's enforceability.Bisnow; Fredericksburg Free Press
2025-04OtherActualAmazon filed a court petition seeking a vested rights review; the county Board of Zoning Appeals denied its request in mid-2025 and the case was pending in circuit court as of March 2026, per Baxtel.Baxtel

Power supply

TypeDescriptionSources
GridDominion Energy said new substations and transmission lines would be needed to support data center growth in the county and that it was not proposing power plants there; the first phase plans include two on-site electrical substations.Bisnow; Fredericksburg Free Press

Status comes from Baxtel's undated third-party listing (accessed 2026-10-09), which labels the project in doubt; its latest entry, for March 2026, says the case was pending in King George County Circuit Court with no ruling. No later ruling was found. Total floor area is reported as 7.5 million sq ft by Bisnow and Baxtel and 7.25 million sq ft by the rezoning counsel and local press. Baxtel gives a total of 19 buildings, which does not match its own phase breakdown of eight plus nine, so no campus building total is recorded. The site was the 258 MW Birchwood coal plant, decommissioned in 2021.

Sources for these details
Companies
  • Developer: Amazon Web Services (unknown scope) evidence
  • Developer: Amazon Web Services (unknown scope) evidence
  • Owner: Amazon Web Services (unknown scope) evidence
  • Owner: Amazon Web Services (unknown scope) evidence
  • Developer: Birchwood Power Partners (unknown scope) evidence
  • Developer: Birchwood Power Partners (unknown scope) evidence
  • Government: King George County Board of Supervisors (unknown scope) evidence
  • Government: King George County Board of Supervisors (unknown scope) evidence
  • Utility: Dominion Energy (unknown scope) evidence
Source and location review
Status source
Amazon: King George, VA Data Center evidence row
Baxtel · publication date not stated · Other
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 18 days before the data update on 2026-10-27

Location details
Coordinates
38.26140, -77.33190
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Coordinates are the Sealston community coordinates from its Wikipedia page. Sources place the campus at the former Birchwood power plant on State Route 3 in the Sealston area but give no parcel coordinates.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
77cb3c3a

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Amazon Web Services King George County campus (Birchwood site)
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Amazon Data Center Campus Planned For King George County, Virginia, As Project Clears Key Hurdle
Archived copy
Bisnow
Trade publication
Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Floor Area, Metric: Land Area, Milestone: Announced, Role: Developersource-terms-not-recordedBisnow31ce62acad4ac56d9aa735bff0e55e8bc030928b88d3746f85b80a26b55fd572
Factual source record; not the publisher page
Amazon Dealt Setback In Plan For $6B Virginia Data Center Campus
Archived copy
Bisnow
Trade publication
Imported: Record, Metric: Buildings, Metric: Floor Area, Metric: Investment, Metric: Land Area, Milestone: Announced, Milestone: Other, Milestone: Zoning Approved, Power Source: Grid, Role: Developer, Role: Governmentsource-terms-not-recordedBisnow10b313e64f7822d76ea820596b99023bd8415172bb4bd5d1e652727cc7a65861
Factual source record; not the publisher page
Amazon: King George, VA Data Center
Archived copy
Baxtel
Other
Imported: Record, Imported: Status, Metric: Buildings, Metric: Floor Area, Metric: Investment, Metric: Land Area, Milestone: Other, Milestone: Site Acquired, Owner claimnot statedsource-terms-not-recordedBaxtel28e5b388e109cb1c7093de3834d0d3fdde9d9047180e1d6ae2bdbe42ef0024cf
Factual source record; not the publisher page
Hirschler Secures Historic Rezoning for Massive Data Center Campus in King George County, Virginia
Archived copy
Hirschler
Other
Imported: Record, Metric: Floor Area, Metric: Land Area, Milestone: Zoning Approved, Role: Developersource-terms-not-recordedHirschlerb88221054831892cdb0cad6f2151a64c58b3209bd7160b40e87e6488fc86ce11
Factual source record; not the publisher page
King George supervisors ready to 'go to war' with Amazon
Archived copy
Fredericksburg Free Press
News
Imported: Geometry, Imported: Record, Metric: Floor Area, Metric: Investment, Metric: Land Area, Milestone: Other, Power Source: Grid, Role: Developer, Role: Government, Owner claim, Role: Utilitysource-terms-not-recordedFredericksburg Free Press272338bd630124bac15b8e4153444bdd85b41b10446c41222425d3a48351f2e1
Factual source record; not the publisher page
Sealston, Virginia
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia73bdc7e65dde60efd0e9069cbb5d075754984c53d360580a7995114d7141b0ef
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Amazon Web Services King George County campus (Birchwood site) [site vcc-site-9c23979ae731456903ea]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9c23979ae731456903ea/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction