Meta Gallatin Data Center

Partially operational

United States · 1 project · Last reported

Summary

Multi-building Meta campus on roughly 800 acres in Gallatin, Tennessee. Construction began in August 2020 on what was first a USD 800 million commitment; by September 2022 the project was described as a nearly USD 1 billion investment, and in 2024 Meta filed plans for a further 278,000 sq ft data center that would take the campus to almost 1.9 million sq ft. In November 2024 Meta formally presented the operating campus to officials and said total investment would exceed USD 1.5 billion once the fourth data center is finished. DPR Construction is building the campus, and Meta says it planned its energy needs with the Tennessee Valley Authority.

Source record as of 2024-11-15 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 36.40850, -86.37160 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Approximate site reference; the exact facility position is unverified.

Projects (1)

Meta Gallatin Data Center

Partially operational last observed as of · Reported status

Location: Gallatin, Sumner County, Tennessee, US. Centroid of the area named Gallatin Data Center and tagged as Meta-operated in the local OpenStreetMap layer (way 1213758201); Meta-tagged data center buildings lie within about 500 m of it. Sources name only the city and county. Meta Platforms; Nashville Business Journal (via Gallatin Economic Development Agency); Nashville Business Journal (via Gallatin Economic Development Agency)

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Investment800,000,000 USDAnnounced · Campus2020Initial commitment made when Meta was still Facebook.Nashville Business Journal (via Gallatin Economic Development Agency)
Investmentabout 1,000,000,000 USDReported · Campus2022-09-23Described in September 2022 as a nearly USD 1 billion investment, with about USD 1 billion spent to date.W.Media
Investmentmore than 1,500,000,000 USDAnnounced · Campus2024-11-15Meta said the total would exceed this once the fourth data center is complete.Meta Platforms; Nashville Business Journal (via Gallatin Economic Development Agency)
Land areaabout 800 acresReported · Campus2024-11-15Nashville Business Journal (via Gallatin Economic Development Agency); Nashville Business Journal (via Gallatin Economic Development Agency)
Floor areaabout 1,900,000 sq_ftPlanned · Campus2024-04-15About 1.6 million sq ft operating or under construction plus the 278,000 sq ft building filed in 2024, including some office space.Nashville Business Journal (via Gallatin Economic Development Agency)
Buildingsat least 4 countPlanned · Campus2024-11-15Data center buildings; the fourth was under construction in November 2024.Nashville Business Journal (via Gallatin Economic Development Agency)
Jobs construction1,700 countReported · Campus2022-09-23Peak skilled trade workforce reported in 2022, up from an earlier peak of 1,200.W.Media
Jobs construction1,100 countReported · Campus2026-10-09Skilled trade workers on site at peak construction, per Meta's undated fact sheet; differs from the 2022 report.Meta Platforms
Jobs permanentmore than 100 countReported · Campus2024-11-15Meta Platforms; Nashville Business Journal (via Gallatin Economic Development Agency)

Companies and organizations

NameRoleNotesSources
Meta PlatformsDeveloperMeta Platforms; W.Media
Meta PlatformsOperatorNashville Business Journal (via Gallatin Economic Development Agency)
DPR ConstructionBuilderW.Media; Nashville Business Journal (via Gallatin Economic Development Agency)
Tennessee Valley AuthorityUtilityMeta Platforms

Timeline

DateEventActual or plannedNotesSources
2020-08Construction startedActualMeta Platforms; W.Media
2022-09Expansion announcedActualW.Media reported two new structures, one for cold storage of older data, with completion then expected in late 2023.W.Media
2024-04Expansion announcedActualPlans for a further 278,000 sq ft data center went to the Gallatin planning commission.Nashville Business Journal (via Gallatin Economic Development Agency)
2024-11OtherActualMeta formally presented the operating campus to state and local officials.Nashville Business Journal (via Gallatin Economic Development Agency)

Power supply

TypeDescriptionSources
GridMeta says it planned the campus's energy needs with the Tennessee Valley Authority and pays the full cost of the energy used; an on-site electrical substation was finished by 2022.Meta Platforms; W.Media

In November 2024 the campus was described as operating while its fourth data center was still under construction; no later report on that building was found. Reported site size differs: about 800 acres (Nashville Business Journal, 2024) versus more than 900 acres (W.Media, 2022). Peak construction workforce also differs: 1,700 in W.Media's 2022 report versus 1,100 on Meta's fact sheet. Meta's fact sheet (s1) shows no publication date (embedded file creation date 2026-09-02), so figures that rest on it alone are dated to the access date, 2026-10-09. The Nashville Business Journal articles are cited from reposts on the Gallatin Economic Development Agency site.

Sources for these details
Companies
  • Developer: Meta Platforms (unknown scope) evidence
  • Developer: Meta Platforms (unknown scope) evidence
  • Operator: Meta Platforms (unknown scope) evidence
  • Builder: DPR Construction (unknown scope) evidence
  • Builder: DPR Construction (unknown scope) evidence
  • Utility: Tennessee Valley Authority (unknown scope) evidence
Source and location review
Status source
Meta's data centers in Gallatin are up and running evidence row
Nashville Business Journal (via Gallatin Economic Development Agency) · published 2024-11-15 · News
Locator
Approximate site reference · Compiled location reference · approximate_site evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 711 days before the data update on 2026-10-27

Location details
Coordinates
36.40850, -86.37160
Geometry licence
source-terms-not-recorded
Use scope
Approximate site reference
Scope class
approximate_site
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Centroid of the area named Gallatin Data Center and tagged as Meta-operated in the local OpenStreetMap layer (way 1213758201); Meta-tagged data center buildings lie within about 500 m of it. Sources name only the city and county.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
dfa60568

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Meta Gallatin Data Center
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Meta Expands Gallatin Data Center with $1B Investment
Archived copy
W.Media
Trade publication
Imported: Record, Metric: Investment, Metric: Jobs Construction, Milestone: Construction Started, Milestone: Expansion Announced, Power Source: Grid, Role: Builder, Role: Developersource-terms-not-recordedW.Mediae3ea0d4d5ef0145c641c0c73296bdf6dc63005eee72ef59140ac670d187f0f40
Factual source record; not the publisher page
Meta Gallatin Data Center fact sheet
Archived copy
Meta Platforms
Company disclosure
Imported: Geometry, Imported: Record, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Milestone: Construction Started, Power Source: Grid, Role: Developer, Role: Utilitynot statedsource-terms-not-recordedMeta Platformscb4f89e4753b4860d41d5ee1652aad28378550ce3c0463f700c0819e080aed45
Factual source record; not the publisher page
Meta's data centers in Gallatin are up and running
Archived copy
Nashville Business Journal (via Gallatin Economic Development Agency)
News
Imported: Geometry, Imported: Record, Imported: Status, Metric: Buildings, Metric: Investment, Metric: Jobs Permanent, Metric: Land Area, Milestone: Other, Operator claimsource-terms-not-recordedNashville Business Journal (via Gallatin Economic Development Agency)5f20c8182b6e7cedce910c687c7bdd73d8e09550aa649778c1c77ed6173d46ce
Factual source record; not the publisher page
Meta, formerly known as Facebook, tees up another data center in Gallatin
Archived copy
Nashville Business Journal (via Gallatin Economic Development Agency)
News
Imported: Geometry, Imported: Record, Metric: Floor Area, Metric: Land Area, Milestone: Expansion Announced, Role: Buildersource-terms-not-recordedNashville Business Journal (via Gallatin Economic Development Agency)e96372232b52dc776503119a9aad6fed6269bf1e5785244b5059f7c370a1658e
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Meta Gallatin Data Center [site vcc-site-beb10377588af430b5a6]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-beb10377588af430b5a6/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction