Balico gas-powered data center campus, Pittsylvania County

Cancelled

United States · 1 project · Last reported

Summary

Rejected plan by Herndon-based Balico for a data center campus with a 3,500 MW on-site natural gas power plant near Chatham in Pittsylvania County, Virginia. The first application, covering 47 parcels and about 2,233 acres with 84 data center buildings, was withdrawn in November 2024 after community meetings. A scaled-down version on about 750 acres with up to 12 buildings kept the 3,500 MW plant; the planning commission unanimously recommended denial in January 2025. On 15 April 2025 county supervisors refused Balico's request to withdraw it again and voted 6-1 against the rezoning, so a new filing had to wait a year.

Source record as of 2025-04-16 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 36.82560, -79.39750 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Balico gas-powered data center campus, Pittsylvania County

Cancelled last observed as of · Reported status

Location: Chatham, Pittsylvania County, Virginia, US. Coordinates are the Wikipedia centroid of the town of Chatham (s5). Sources place the land near Chatham (s3, s4) in the county's Banister district (s1) but name no roads; the parcels were not geocoded. WDBJ7; Cardinal News; Wikipedia

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity3,500 MWPlanned · Campus · Onsite generation2025-04-14Planned natural gas power plant serving the campus; WDBJ reported the same plant size for the scaled-down 2025 application.Cardinal News; WDBJ7; Cardinal News
Land areaabout 2,233 acresPlanned · Campus2024-11-0447 parcels to be rezoned to heavy industrial in the original application, withdrawn in November 2024 and superseded by the 750-acre plan.Cardinal News
Land areaabout 750 acresPlanned · Campus2025-04-16Scaled-down application rejected in April 2025.WDBJ7; Cardinal News
Buildings84 countPlanned · Campus2024-11-04Original application, withdrawn in November 2024 and superseded by the 12-building plan.Cardinal News; Cardinal News
Buildingsup to 12 countPlanned · Campus2025-04-16Each building planned at 396,000 square feet.Radio IQ (WVTF); WDBJ7; Cardinal News
Jobs permanentup to 700 countPlanned · Campus2024-11-04Company claim for the original application; residents questioned the job promises.Cardinal News

Companies and organizations

NameRoleNotesSources
Balico LLCDeveloperCardinal News; Radio IQ (WVTF); WDBJ7; Cardinal News
Pittsylvania County Board of SupervisorsGovernmentDenied the withdrawal request 5-2 and the rezoning 6-1.Radio IQ (WVTF); Cardinal News

Timeline

DateEventActual or plannedNotesSources
2024-10AnnouncedActualBalico held community meetings on its rezoning application in late October 2024.Cardinal News
2024-11OtherActualFirst application withdrawn before a planning commission hearing, with county staff recommending denial; Balico said it was revising, not abandoning, the project.Cardinal News
2025-01OtherActualPlanning commission voted unanimously to recommend denying the revised rezoning.Radio IQ (WVTF)
2025-04-15CancelledActualBoard of Supervisors denied Balico's request to withdraw and rejected the rezoning 6-1.Cardinal News

Power supply

TypeDescriptionSources
Natural gas onsiteA 3,500 MW natural gas power plant on the campus, described as the largest in Virginia; a public health study commissioned by the Southern Environmental Law Center estimated at least 326.53 tons of fine particulate emissions a year.Cardinal News; Radio IQ (WVTF); WDBJ7

Recorded as cancelled because the county rejected the rezoning after refusing Balico's request to withdraw it; the sources reviewed report no appeal or new application. After the vote Balico's attorney said it was pursuing a joint venture with Dallas developer Hillwood and weighing other uses for the land, including another data center or housing. This project is separate from the Stack Infrastructure campus at the Berry Hill megasite in the same county.

Sources for these details
Companies
  • Developer: Balico LLC (unknown scope) evidence
  • Developer: Balico LLC (unknown scope) evidence
  • Developer: Balico LLC (unknown scope) evidence
  • Developer: Balico LLC (unknown scope) evidence
  • Government: Pittsylvania County Board of Supervisors (unknown scope) evidence
  • Government: Pittsylvania County Board of Supervisors (unknown scope) evidence
Source and location review
Status source
Pittsylvania rejects data center project that has dominated county conversation for 6 months evidence row
Cardinal News · published 2025-04-16 · News
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 559 days before the data update on 2026-10-27

Location details
Coordinates
36.82560, -79.39750
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Coordinates are the Wikipedia centroid of the town of Chatham (s5). Sources place the land near Chatham (s3, s4) in the county's Banister district (s1) but name no roads; the parcels were not geocoded.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
2b620414

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Balico gas-powered data center campus, Pittsylvania County
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Balico withdraws application to build data centers in Pittsylvania County
Archived copy
Radio IQ (WVTF)
News
Imported: Record, Metric: Buildings, Milestone: Other, Power Source: Natural Gas Onsite, Role: Developer, Role: Governmentsource-terms-not-recordedRadio IQ (WVTF)13c272253cf001e9f5eebd912171a863edf76fcda45fc5dd183c90d7e85b87fa
Factual source record; not the publisher page
Chatham, Virginia
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipediab1e1e3a3c0bf73aeec3cab43106d718206f974e9372dd472ae8b85463c1c3d93
Factual source record; not the publisher page
Company withdraws data center proposal, residents express skepticism
Archived copy
WDBJ7
News
Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Land Area, Metric: Power Capacity, Power Source: Natural Gas Onsite, Role: Developersource-terms-not-recordedWDBJ751b14f724e6c968ce90ade978582e6e34fe091a57be96f5c2f293f2c583d45cd
Factual source record; not the publisher page
Data center proposal in Pittsylvania withdrawn, for now
Archived copy
Cardinal News
News
Imported: Record, Metric: Buildings, Metric: Jobs Permanent, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Milestone: Other, Power Source: Natural Gas Onsite, Role: Developersource-terms-not-recordedCardinal Newsb19e4c491e25365012b16f7927b7ce5b0babb4d6e5fe7efe1523530411e51849
Factual source record; not the publisher page
Pittsylvania rejects data center project that has dominated county conversation for 6 months
Archived copy
Cardinal News
News
Imported: Geometry, Imported: Record, Imported: Status, Metric: Buildings, Metric: Land Area, Metric: Power Capacity, Milestone: Cancelled, Role: Developer, Role: Governmentsource-terms-not-recordedCardinal Newsf94270d524a0e21d4ba41f3b6c9e58cccc5544024566e3208e8daec3a9831561
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Balico gas-powered data center campus, Pittsylvania County [site vcc-site-7b36022a26fba8770036]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7b36022a26fba8770036/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction