CoreWeave Kenilworth NEST 11 AI data center

Under construction

United States · 1 project · Last reported

Summary

CoreWeave is converting a 1982 pharmaceutical research building (11 NEST) on the former Merck campus, now the Northeast Science and Technology Center on Galloping Hill Road in Kenilworth, New Jersey, into an AI data center. It leased the building in October 2024, bought it with 27 adjacent acres for 322 million US dollars in August 2025, and started construction in September 2025. In November 2025 the state EDA approved a 250 million US dollar tax credit for the roughly 1.76 billion US dollar project, reported at 250 MW. CoreWeave's own site page lists 40 MW of planned load. Opening is targeted for early 2027 amid growing local opposition.

Source record as of 2026-10-09 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 40.67810, -74.28810 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

CoreWeave Kenilworth NEST 11 AI data center

Under construction last observed as of · Reported status

Location: Kenilworth, Union County, New Jersey, US. Borough centroid from the Wikipedia infobox for Kenilworth (s6), which also gives Union County. Sources place the building at 2000 Galloping Hill Road on the roughly 108-acre NEST campus, but no geocoder was used, so the point is the borough centroid rather than the building. Real Estate NJ; Real Estate NJ; CoreWeave; Wikipedia

Use: Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Investment1,000,000,000 USDAnnounced · Campus2024-10-24Figure the article's headline gives for the data center at the lease announcement; the body says the conversion is part of a planned 1.2 billion US dollar CoreWeave investment without giving a site breakdown.Real Estate NJ
Investmentabout 1,760,000,000 USDIncentive agreement · Campus2025-11-25Project cost cited by the state EDA with the tax credit award; reported as nearly 1.8 billion US dollars.Real Estate NJ
Power capacity250 MWPlanned · Campus · Unspecified2025-11-25Figure reported with the EDA award; conflicts with the 40 MW on CoreWeave's own site page.Real Estate NJ
Power capacity40 MWPlanned · Campus · Unspecified2026-10-09Planned load listed on CoreWeave's undated NEST 11 page, accessed on this date; the sources do not explain the gap with the 250 MW figure.CoreWeave
Floor area392,600 sq_ftUnder construction · Campus2025-11-25Retrofit of the existing 284,500 sq ft 11 NEST building plus 108,100 sq ft of new construction.Real Estate NJ
Floor area280,000 sq_ftPlanned · Campus2024-10-24Size of the existing lab and manufacturing building as described at the 2024 lease announcement.Real Estate NJ
Land area27 acresAcquired · Campus2025-11-25Adjacent acreage bought with the building.Real Estate NJ
Jobs permanent143 countPlanned · Campus2025-11-25Jobs committed under the state tax credit; CoreWeave's page says more than 140.Real Estate NJ
Jobs constructionmore than 1,500 countPlanned · Campus2026-10-09Union construction and skilled trade jobs cited on CoreWeave's undated site page, accessed on this date.CoreWeave

Companies and organizations

NameRoleNotesSources
CoreWeaveDeveloperReal Estate NJ; Real Estate NJ
CoreWeaveOwnerBought the building and 27 adjacent acres in August 2025 after first leasing it from a venture of Onyx Equities and Machine Investment Group.Real Estate NJ
PSE&GUtilitySaid in 2024 it would begin preparing local electrical infrastructure for the facility.Real Estate NJ
New Jersey Economic Development AuthorityGovernmentApproved a 250 million US dollar tax credit under the Next New Jersey Program - AI on November 12, 2025.Real Estate NJ; New Jersey Economic Development Authority

Timeline

DateEventActual or plannedNotesSources
2024-10-24AnnouncedActualLong-term lease of the building and conversion plan announced.Real Estate NJ
2025-08Site acquiredActualPurchase of the building and 27 adjacent acres for 322 million US dollars.Real Estate NJ
2025-09Construction startedActualMid-September 2025, according to the EDA.Real Estate NJ
2025-11-12OtherActualEDA approved a five-year, 250 million US dollar tax credit, the first award under the Next New Jersey Program - AI.Real Estate NJ; New Jersey Economic Development Authority
2027First operationalPlannedOperations expected in early 2027.Real Estate NJ

Power supply

TypeDescriptionSources
GridUtility supply prepared by PSE&G; CoreWeave says it is funding about 150 million US dollars of new substation and electrical infrastructure.Real Estate NJ; CoreWeave

CoreWeave's Kenilworth page is undated; status_as_of is the date it was accessed, when it still described the facility as being built. Capacity figures conflict: trade press reported 250 MW with the state tax credit award, while CoreWeave's page lists a planned 40 MW load for NEST 11.

Sources for these details
Companies
  • Developer: CoreWeave (unknown scope) evidence
  • Developer: CoreWeave (unknown scope) evidence
  • Owner: CoreWeave (unknown scope) evidence
  • Utility: PSE&G (unknown scope) evidence
  • Government: New Jersey Economic Development Authority (unknown scope) evidence
  • Government: New Jersey Economic Development Authority (unknown scope) evidence
Source and location review
Status source
Kenilworth, NJ AI Data Center evidence row
CoreWeave · publication date not stated · Company disclosure
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 18 days before the data update on 2026-10-27

Location details
Coordinates
40.67810, -74.28810
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Borough centroid from the Wikipedia infobox for Kenilworth (s6), which also gives Union County. Sources place the building at 2000 Galloping Hill Road on the roughly 108-acre NEST campus, but no geocoder was used, so the point is the borough centroid rather than the building.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
e5ef1215

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for CoreWeave Kenilworth NEST 11 AI data center
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
A.I. cloud startup CoreWeave to build $1 billion data center at Onyx's NEST campus in Kenilworth
Archived copy
Real Estate NJ
Trade publication
Imported: Geometry, Imported: Record, Metric: Floor Area, Metric: Investment, Milestone: Announced, Power Source: Grid, Role: Developer, Role: Utilitysource-terms-not-recordedReal Estate NJeca2a0cbc6f6a179be41bda1a7a976182085765a44fe7d0e8030fa04d0b60f55
Factual source record; not the publisher page
Community rallies against construction of giant data center in small NJ town
Archived copy
ABC7 New York
News
Imported: Record, Imported: Statussource-terms-not-recordedABC7 New York43d77a06ffc297e6b6c57895f79ac086f7a22930d5395ec4f62309b71b5c7549
Factual source record; not the publisher page
CoreWeave begins $1.8 billion data center project in Kenilworth, landing first award under new EDA tax credit program
Archived copy
Real Estate NJ
Trade publication
Imported: Geometry, Imported: Record, Metric: Floor Area, Metric: Investment, Metric: Jobs Permanent, Metric: Land Area, Metric: Power Capacity, Milestone: Construction Started, Milestone: First Operational, Milestone: Other, Milestone: Site Acquired, Role: Developer, Role: Government, Owner claimsource-terms-not-recordedReal Estate NJa71baf3b8f55d07f682e3115c1e3923b7f3f983cb2cf1423f5753ffa60d84d6b
Factual source record; not the publisher page
Kenilworth, New Jersey
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia4f88495e4dee753e2e91e3e11867310df2fe3e0197a1af0e0d57a0f1f76eadaa
Factual source record; not the publisher page
Kenilworth, NJ AI Data Center
Archived copy
CoreWeave
Company disclosure
Imported: Geometry, Imported: Record, Imported: Status, Metric: Jobs Construction, Metric: Power Capacity, Power Source: Gridnot statedsource-terms-not-recordedCoreWeave02442207a15150b88d0d6910d0c7a142b5b14ff2dfb3588c3a466f2d7759549b
Factual source record; not the publisher page
Next NJ Program - AI approvals table
Archived copy
New Jersey Economic Development Authority
Government record
Imported: Record, Milestone: Other, Role: Governmentsource-terms-not-recordedNew Jersey Economic Development Authority35dd434678d87a121e860b810248c94bcf9e03e3a8b6778d585d32f5e43c8116
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). CoreWeave Kenilworth NEST 11 AI data center [site vcc-site-7ceb4cfa4ba358ea4547]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7ceb4cfa4ba358ea4547/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction