Riot Platforms Corsicana facility

Partially operational

United States · 1 project · Last reported

Summary

Riot Platforms campus in Navarro County, Texas, begun in 2022 to expand bitcoin mining; its 400 MW first phase of immersion-cooled mining infrastructure was completed in 2024 and still serves mining. Riot now plans to make the site's expected total of about 1 GW of developed capacity available for high-density compute: in January 2026 it said it would convert available Corsicana power for data center use, its 2025 annual report described a first data center phase at Corsicana, and in August 2026 it disclosed a non-binding letter of intent with a single tenant for the full site. The sources opened report no signed lease.

Source record as of 2026-08-10 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 32.05000, -96.47000 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

County or district reference only; the facility position is not established.

Projects (1)

Riot Platforms Corsicana facility

Partially operational last observed as of · Reported status

Location: Navarro County, Texas, US. Riot's 10-K places the facility in Navarro County without naming a town or address. Coordinates are the Navarro County point from its Wikipedia article, not the site. Riot Platforms, Inc. via SEC EDGAR; Wikipedia

Use: Crypto mining, Hpc

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacityabout 1,000 MWPlanned · Campus · Unspecified2026-08-10Riot's expected total developed capacity at completion, now described as available for high-density compute; Riot does not say whether this is IT or facility load.Riot Platforms, Inc. via SEC EDGAR; Riot Platforms, Inc. via SEC EDGAR; Riot Platforms, Inc. via SEC EDGAR
Power capacityabout 400 MWOperational · Phase · Unspecified · Phase I (immersion-cooled bitcoin mining)2026-08-10Developed capacity currently equipped for bitcoin mining.Riot Platforms, Inc. via SEC EDGAR; Riot Platforms, Inc. via SEC EDGAR

Companies and organizations

Timeline

DateEventActual or plannedNotesSources
2022Construction startedActualRiot began developing the Corsicana Facility in 2022 to expand bitcoin mining.Riot Platforms, Inc. via SEC EDGAR
2024First operationalActualConstruction of the 400 MW Phase I mining build was completed during 2024.Riot Platforms, Inc. via SEC EDGAR
2026-01-16OtherActualRiot said it was working to convert all available power capacity at Corsicana, as at Rockdale, for data center use.Riot Platforms, Inc. via SEC EDGAR
2026-08-10OtherActualRiot disclosed a non-binding letter of intent with a single, unnamed tenant for a proposed lease of the full site and said it aims to convert it into an executed lease.Riot Platforms, Inc. via SEC EDGAR; Riot Platforms, Inc. via SEC EDGAR

Status reflects the operating 400 MW mining phase; the AI/HPC conversion rests on a non-binding letter of intent and could change. Riot's 2025 10-K says it has completed a basis of design for its standard data center build to support the initial data center phase at Corsicana. The January 2026 release puts Riot's fully approved data center power portfolio at about 1.7 GW across Rockdale and Corsicana combined.

Sources for these details
Companies
  • Developer: Riot Platforms (unknown scope) evidence
  • Developer: Riot Platforms (unknown scope) evidence
  • Operator: Riot Platforms (unknown scope) evidence
  • Operator: Riot Platforms (unknown scope) evidence
Source and location review
Status source
Riot Platforms Form 8-K: second quarter 2026 results and Corsicana letter of intent evidence row
Riot Platforms, Inc. via SEC EDGAR · published 2026-08-10 · Regulatory filing
Locator
County or district reference only · Compiled location reference · admin2 evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 78 days before the data update on 2026-10-27

Location details
Coordinates
32.05000, -96.47000
Geometry licence
source-terms-not-recorded
Use scope
County or district reference only
Scope class
admin2
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Riot's 10-K places the facility in Navarro County without naming a town or address. Coordinates are the Navarro County point from its Wikipedia article, not the site.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
8d80043d

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Riot Platforms Corsicana facility
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Navarro County, Texas
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipediaa61a8213a7cb27e49d284bf293da207b0d0d280011f221486bb9dad1e7a47478
Factual source record; not the publisher page
Riot announces fee simple acquisition of land and first data center lease with AMD at the Rockdale Site (Form 8-K, Exhibit 99.1)
Archived copy
Riot Platforms, Inc. via SEC EDGAR
Regulatory filing
Imported: Record, Milestone: Other, Role: Developersource-terms-not-recordedRiot Platforms, Inc. via SEC EDGARd8ce58cb32b86bbc4c757a633532736c8574bb79647351774f4928642e79f3b8
Factual source record; not the publisher page
Riot Platforms Form 8-K: second quarter 2026 results and Corsicana letter of intent
Archived copy
Riot Platforms, Inc. via SEC EDGAR
Regulatory filing
Imported: Record, Imported: Status, Milestone: Othersource-terms-not-recordedRiot Platforms, Inc. via SEC EDGAR8ec7d3fea5d371fbf0a1b74e2543a624fef988480ed2f09a9cb3177e6f376831
Factual source record; not the publisher page
Riot Platforms Q2 2026 earnings deck (Form 8-K, Exhibit 99.2)
Archived copy
Riot Platforms, Inc. via SEC EDGAR
Regulatory filing
Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: Othersource-terms-not-recordedRiot Platforms, Inc. via SEC EDGARc395a1ac4615a3cfdb1140902058846e3f42bea148253b1c78e538845b16cce6
Factual source record; not the publisher page
Riot Platforms, Inc. annual report on Form 10-K for fiscal year 2025
Archived copy
Riot Platforms, Inc. via SEC EDGAR
Regulatory filing
Imported: Geometry, Imported: Record, Metric: Power Capacity, Milestone: Construction Started, Milestone: First Operational, Role: Developer, Operator claimsource-terms-not-recordedRiot Platforms, Inc. via SEC EDGARded9853da218340b64eea4edc20d1e27980a106e5228cb74e064144475aa8232
Factual source record; not the publisher page
Riot Platforms, Inc. quarterly report on Form 10-Q for the period ended June 30, 2026
Archived copy
Riot Platforms, Inc. via SEC EDGAR
Regulatory filing
Imported: Record, Imported: Status, Metric: Power Capacity, Operator claimsource-terms-not-recordedRiot Platforms, Inc. via SEC EDGAR95f43fcc7b54ee5c8d95aea324b084e4b1e2312950895b48e9c73be64e497333
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Riot Platforms Corsicana facility [site vcc-site-387901bd13edd6eab35d]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-387901bd13edd6eab35d/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction