Riot Platforms Corsicana facility
Partially operational
United States · 1 project · Last reported
Summary
Riot Platforms campus in Navarro County, Texas, begun in 2022 to expand bitcoin mining; its 400 MW first phase of immersion-cooled mining infrastructure was completed in 2024 and still serves mining. Riot now plans to make the site's expected total of about 1 GW of developed capacity available for high-density compute: in January 2026 it said it would convert available Corsicana power for data center use, its 2025 annual report described a first data center phase at Corsicana, and in August 2026 it disclosed a non-binding letter of intent with a single tenant for the full site. The sources opened report no signed lease.
Source record as of 2026-08-10 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 32.05000, -96.47000 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
County or district reference only; the facility position is not established.
Projects (1)
Riot Platforms Corsicana facility
Partially operational last observed as of · Reported status
Location: Navarro County, Texas, US. Riot's 10-K places the facility in Navarro County without naming a town or address. Coordinates are the Navarro County point from its Wikipedia article, not the site. Riot Platforms, Inc. via SEC EDGAR; Wikipedia
Use: Crypto mining, Hpc
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | about 1,000 MW | Planned · Campus · Unspecified | 2026-08-10 | Riot's expected total developed capacity at completion, now described as available for high-density compute; Riot does not say whether this is IT or facility load. | Riot Platforms, Inc. via SEC EDGAR; Riot Platforms, Inc. via SEC EDGAR; Riot Platforms, Inc. via SEC EDGAR |
| Power capacity | about 400 MW | Operational · Phase · Unspecified · Phase I (immersion-cooled bitcoin mining) | 2026-08-10 | Developed capacity currently equipped for bitcoin mining. | Riot Platforms, Inc. via SEC EDGAR; Riot Platforms, Inc. via SEC EDGAR |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| Riot Platforms | Developer | Riot Platforms, Inc. via SEC EDGAR; Riot Platforms, Inc. via SEC EDGAR | |
| Riot Platforms | Operator | Riot Platforms, Inc. via SEC EDGAR; Riot Platforms, Inc. via SEC EDGAR |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2022 | Construction started | Actual | Riot began developing the Corsicana Facility in 2022 to expand bitcoin mining. | Riot Platforms, Inc. via SEC EDGAR |
| 2024 | First operational | Actual | Construction of the 400 MW Phase I mining build was completed during 2024. | Riot Platforms, Inc. via SEC EDGAR |
| 2026-01-16 | Other | Actual | Riot said it was working to convert all available power capacity at Corsicana, as at Rockdale, for data center use. | Riot Platforms, Inc. via SEC EDGAR |
| 2026-08-10 | Other | Actual | Riot disclosed a non-binding letter of intent with a single, unnamed tenant for a proposed lease of the full site and said it aims to convert it into an executed lease. | Riot Platforms, Inc. via SEC EDGAR; Riot Platforms, Inc. via SEC EDGAR |
Status reflects the operating 400 MW mining phase; the AI/HPC conversion rests on a non-binding letter of intent and could change. Riot's 2025 10-K says it has completed a basis of design for its standard data center build to support the initial data center phase at Corsicana. The January 2026 release puts Riot's fully approved data center power portfolio at about 1.7 GW across Rockdale and Corsicana combined.
Sources for these details
- Riot Platforms, Inc. annual report on Form 10-K for fiscal year 2025 — Riot Platforms, Inc. via SEC EDGAR; 2026-03-02 · Archived source
- Riot announces fee simple acquisition of land and first data center lease with AMD at the Rockdale Site (Form 8-K, Exhibit 99.1) — Riot Platforms, Inc. via SEC EDGAR; 2026-01-16
- Riot Platforms Form 8-K: second quarter 2026 results and Corsicana letter of intent — Riot Platforms, Inc. via SEC EDGAR; 2026-08-10
- Riot Platforms Q2 2026 earnings deck (Form 8-K, Exhibit 99.2) — Riot Platforms, Inc. via SEC EDGAR; 2026-08-10
- Riot Platforms, Inc. quarterly report on Form 10-Q for the period ended June 30, 2026 — Riot Platforms, Inc. via SEC EDGAR; 2026-08-10 · Archived source
- Navarro County, Texas — Wikipedia; publication date not stated
- Companies
Source and location review
- Status source
- Riot Platforms Form 8-K: second quarter 2026 results and Corsicana letter of intent evidence row
Riot Platforms, Inc. via SEC EDGAR · published 2026-08-10 · Regulatory filing - Locator
- County or district reference only · Compiled location reference · admin2 evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 78 days before the data update on 2026-10-27
Location details
- Coordinates
- 32.05000, -96.47000
- Geometry licence
- source-terms-not-recorded
- Use scope
- County or district reference only
- Scope class
- admin2
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- Riot's 10-K places the facility in Navarro County without naming a town or address. Coordinates are the Navarro County point from its Wikipedia article, not the site.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- 8d80043d
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Navarro County, Texas Archived copy | Wikipedia Other | Imported: Geometry, Imported: Record | not stated | source-terms-not-recorded | Wikipedia | a61a8213a7cb27e49d284bf293da207b0d0d280011f221486bb9dad1e7a47478Factual source record; not the publisher page | |
| Riot announces fee simple acquisition of land and first data center lease with AMD at the Rockdale Site (Form 8-K, Exhibit 99.1) Archived copy | Riot Platforms, Inc. via SEC EDGAR Regulatory filing | Imported: Record, Milestone: Other, Role: Developer | source-terms-not-recorded | Riot Platforms, Inc. via SEC EDGAR | d8ce58cb32b86bbc4c757a633532736c8574bb79647351774f4928642e79f3b8Factual source record; not the publisher page | ||
| Riot Platforms Form 8-K: second quarter 2026 results and Corsicana letter of intent Archived copy | Riot Platforms, Inc. via SEC EDGAR Regulatory filing | Imported: Record, Imported: Status, Milestone: Other | source-terms-not-recorded | Riot Platforms, Inc. via SEC EDGAR | 8ec7d3fea5d371fbf0a1b74e2543a624fef988480ed2f09a9cb3177e6f376831Factual source record; not the publisher page | ||
| Riot Platforms Q2 2026 earnings deck (Form 8-K, Exhibit 99.2) Archived copy | Riot Platforms, Inc. via SEC EDGAR Regulatory filing | Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: Other | source-terms-not-recorded | Riot Platforms, Inc. via SEC EDGAR | c395a1ac4615a3cfdb1140902058846e3f42bea148253b1c78e538845b16cce6Factual source record; not the publisher page | ||
| Riot Platforms, Inc. annual report on Form 10-K for fiscal year 2025 Archived copy | Riot Platforms, Inc. via SEC EDGAR Regulatory filing | Imported: Geometry, Imported: Record, Metric: Power Capacity, Milestone: Construction Started, Milestone: First Operational, Role: Developer, Operator claim | source-terms-not-recorded | Riot Platforms, Inc. via SEC EDGAR | ded9853da218340b64eea4edc20d1e27980a106e5228cb74e064144475aa8232Factual source record; not the publisher page | ||
| Riot Platforms, Inc. quarterly report on Form 10-Q for the period ended June 30, 2026 Archived copy | Riot Platforms, Inc. via SEC EDGAR Regulatory filing | Imported: Record, Imported: Status, Metric: Power Capacity, Operator claim | source-terms-not-recorded | Riot Platforms, Inc. via SEC EDGAR | 95f43fcc7b54ee5c8d95aea324b084e4b1e2312950895b48e9c73be64e497333Factual source record; not the publisher page |
Cite this site
Kyars, K. (2026). Riot Platforms Corsicana facility [site vcc-site-387901bd13edd6eab35d]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-387901bd13edd6eab35d/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction