Crusoe and Lancium Childress AI data center campus
Announced
United States · 1 project · Last reported
Summary
Crusoe and Lancium announced in July 2026 a grid-connected AI data center campus of 1.0 GW on 270 acres owned by Lancium in Childress, Texas, repeating the partnership model used at Abilene. Lancium owns the land, secures the interconnection and develops the energy infrastructure, including behind-the-meter solar and storage; Crusoe designs, builds and operates the data center for an unnamed hyperscale technology company. Construction was expected to start in the third quarter of 2026, using closed-loop liquid cooling.
Source record as of 2026-07-15 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 34.42810, -100.21500 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Town or locality reference only; the facility position is not established.
Projects (1)
Crusoe and Lancium Childress AI data center campus
Announced last observed as of · Reported status
Location: Childress, Childress County, Texas, US. City centroid of Childress from Wikipedia (s3); the announcements name the city and county but give no address for the 270-acre site. Crusoe; Lancium; Wikipedia
Use: Ai unspecified
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | 1,000 MW | Planned · Campus · Unspecified | 2026-07-15 | Grid-connected capacity at full scale; IT versus total not stated. | Crusoe; Lancium |
| Land area | 270 acres | Acquired · Campus | 2026-07-15 | Crusoe; Lancium | |
| Jobs permanent | more than 100 count | Planned · Campus | 2026-07-15 | Crusoe; Lancium |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| Crusoe | Developer | Designs and builds the data center. | Crusoe; Lancium |
| Crusoe | Operator | Crusoe; Lancium | |
| Lancium | Owner | Owns the 270-acre site; secures the power interconnection and develops and manages the energy infrastructure. | Crusoe; Lancium |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2026-07-15 | Announced | Actual | Crusoe; Lancium | |
| 2026-Q3 | Construction started | Planned | Crusoe; Lancium |
Power supply
| Type | Description | Sources |
|---|---|---|
| Grid | Grid-connected campus with the interconnection secured by Lancium. | Crusoe; Lancium |
| Solar | Behind-the-meter solar described in Lancium's release. | Lancium |
| Battery storage | Energy storage resources at the campus, described as supporting grid reliability and efficiency. | Crusoe; Lancium |
Sources for these details
- Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas — Crusoe; 2026-07-15
- Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas — Lancium; 2026-07-15
- Childress, Texas — Wikipedia; publication date not stated · Archived source
- Companies
Source and location review
- Status source
- Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas evidence row
Crusoe · published 2026-07-15 · Company disclosure - Locator
- Locality reference only · Compiled location reference · locality evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 104 days before the data update on 2026-10-27
Location details
- Coordinates
- 34.42810, -100.21500
- Geometry licence
- source-terms-not-recorded
- Use scope
- Locality reference only
- Scope class
- locality
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- City centroid of Childress from Wikipedia (s3); the announcements name the city and county but give no address for the 270-acre site.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- c00fd435
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Childress, Texas Archived copy | Wikipedia Other | Imported: Geometry, Imported: Record | not stated | source-terms-not-recorded | Wikipedia | df9fd2e0a6114639f7f056b13aa084d8b47144f910e562d2a8eac83ee1774524Factual source record; not the publisher page | |
| Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas Archived copy | Crusoe Company disclosure | Imported: Geometry, Imported: Record, Imported: Status, Metric: Jobs Permanent, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Milestone: Construction Started, Power Source: Battery Storage, Power Source: Grid, Role: Developer, Operator claim, Owner claim | source-terms-not-recorded | Crusoe | dca605dda0c05bb17e145a1bbd75f42b51f8155ec273800a8dd7bd77f1dbfa1aFactual source record; not the publisher page | ||
| Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas Archived copy | Lancium Company disclosure | Imported: Geometry, Imported: Record, Imported: Status, Metric: Jobs Permanent, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Milestone: Construction Started, Power Source: Battery Storage, Power Source: Grid, Power Source: Solar, Role: Developer, Operator claim, Owner claim | source-terms-not-recorded | Lancium | a9ab79df6c74577a5f7a730cf3ce49feb20a80d7b10dd654aae26d56612ca13bFactual source record; not the publisher page |
Cite this site
Kyars, K. (2026). Crusoe and Lancium Childress AI data center campus [site vcc-site-5cc5c2b2cb554d5a3255]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5cc5c2b2cb554d5a3255/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction