EdgeCore Mesa data center campus

Partially operational

United States · 1 project · Last reported

Summary

Wholesale hyperscale data center campus that EdgeCore Digital Infrastructure established in Mesa, Arizona, in April 2023, with power from Salt River Project. Its first building, PH01, was operating by 2025 while PH02 and PH03 were under construction for completion in 2025 and 2026. In May 2025 EdgeCore bought another 43.87 acres, more than doubling its buildable land in Mesa, and raised planned capacity to over 450 MW. EdgeCore's campus page now describes an 84-acre, five-building campus able to support 496 MW of critical IT load in about 2.7 million square feet.

Source record as of 2025-05-21 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 33.34420, -111.61960 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Approximate site reference; the exact facility position is unverified.

Projects (1)

EdgeCore Mesa data center campus

Partially operational last observed as of · Reported status

Location: Mesa, Arizona, US. Point from the local OpenStreetMap layer (datacenters/layers/osm/features.geojson): a building footprint tagged EdgeCore at South Everton Terrace, Mesa (OSM way 808979618). It marks one existing building, not the centroid of the expanded 84-acre campus. The cited sources name Mesa but give no street address. EdgeCore Digital Infrastructure; EdgeCore Digital Infrastructure

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity496 MWPlanned · Campus · It load2026-10-09Critical IT load of the five-building campus on EdgeCore's undated campus page, dated here by access.EdgeCore Digital Infrastructure
Power capacitymore than 450 MWPlanned · Campus · Unspecified2025-05-20Total announced with the May 2025 land purchase.EdgeCore Digital Infrastructure; InBusiness Phoenix
Power capacitymore than 250 MWPlanned · Phase · Unspecified · 43.87-acre expansion parcel2025-05-20EdgeCore Digital Infrastructure; InBusiness Phoenix
Land area84 acresReported · Campus2026-10-09EdgeCore Digital Infrastructure
Land area43.87 acresAcquired · Phase · 43.87-acre expansion parcel2025-05-20EdgeCore Digital Infrastructure; InBusiness Phoenix
Buildings5 countPlanned · Campus2026-10-09EdgeCore Digital Infrastructure
Floor areaabout 2,700,000 sq_ftPlanned · Campus2026-10-09EdgeCore Digital Infrastructure

Companies and organizations

NameRoleNotesSources
EdgeCore Digital InfrastructureDeveloperEdgeCore Digital Infrastructure; InBusiness Phoenix; EdgeCore Digital Infrastructure
EdgeCore Digital InfrastructureOwnerDescribed as a wholesale data center developer, owner and operator.InBusiness Phoenix
EdgeCore Digital InfrastructureOperatorInBusiness Phoenix
Salt River ProjectUtilityEdgeCore Digital Infrastructure; InBusiness Phoenix

Timeline

DateEventActual or plannedNotesSources
2023-04OtherActualEdgeCore dates the establishment of its first Mesa campus to April 2023.EdgeCore Digital Infrastructure; InBusiness Phoenix
2025-05-20Expansion announcedActualPurchase of 43.87 more acres and expansion to over 450 MW announced.EdgeCore Digital Infrastructure; InBusiness Phoenix
2025OtherPlannedCompletion year for one of the two buildings under construction; the sources give 2025 and 2026 for PH02 and PH03 without saying which is which.InBusiness Phoenix
2026OtherPlannedCompletion year for the other building under construction (PH02 or PH03).InBusiness Phoenix

Power supply

TypeDescriptionSources
GridSalt River Project serves the operating building and was slated to power PH02 and PH03 on completion.EdgeCore Digital Infrastructure; InBusiness Phoenix

Status rests on the May 2025 release; no 2026 source confirming whether PH02 and PH03 were finished was found. EdgeCore's campus page is undated and does not give per-building status, so its figures carry the access date. The May 2025 release also said 206 MW had been built and commissioned on the original Mesa land while two buildings were still under construction; that figure is left out of the metrics because it is unclear what share was operating.

Sources for these details
Companies
  • Developer: EdgeCore Digital Infrastructure (unknown scope) evidence
  • Developer: EdgeCore Digital Infrastructure (unknown scope) evidence
  • Developer: EdgeCore Digital Infrastructure (unknown scope) evidence
  • Owner: EdgeCore Digital Infrastructure (unknown scope) evidence
  • Operator: EdgeCore Digital Infrastructure (unknown scope) evidence
  • Utility: Salt River Project (unknown scope) evidence
  • Utility: Salt River Project (unknown scope) evidence
Source and location review
Status source
EdgeCore Digital Infrastructure Announces Expansion of Its Metro Phoenix Data Center Market to Over 450 MW evidence row
EdgeCore Digital Infrastructure · published 2025-05-20 · Company disclosure
Locator
Approximate site reference · Compiled location reference · approximate_site evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 524 days before the data update on 2026-10-27

Location details
Coordinates
33.34420, -111.61960
Geometry licence
source-terms-not-recorded
Use scope
Approximate site reference
Scope class
approximate_site
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Point from the local OpenStreetMap layer (datacenters/layers/osm/features.geojson): a building footprint tagged EdgeCore at South Everton Terrace, Mesa (OSM way 808979618). It marks one existing building, not the centroid of the expanded 84-acre campus. The cited sources name Mesa but give no street address.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
3b92e884

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for EdgeCore Mesa data center campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Data Center Developer Announces Expansion of Metro Phoenix Infrastructure
Archived copy
InBusiness Phoenix
Trade publication
Imported: Record, Imported: Status, Metric: Land Area, Metric: Power Capacity, Milestone: Expansion Announced, Milestone: Other, Power Source: Grid, Role: Developer, Operator claim, Owner claim, Role: Utilitysource-terms-not-recordedInBusiness Phoenixfa45949b3cbaf7d12161746429c41c15d171d9453d97ac3ea4418a6d2ed42b48
Factual source record; not the publisher page
EdgeCore Digital Infrastructure Announces Expansion of Its Metro Phoenix Data Center Market to Over 450 MW
Archived copy
EdgeCore Digital Infrastructure
Company disclosure
Imported: Geometry, Imported: Record, Imported: Status, Metric: Land Area, Metric: Power Capacity, Milestone: Expansion Announced, Milestone: Other, Power Source: Grid, Role: Developer, Role: Utilitysource-terms-not-recordedEdgeCore Digital Infrastructure9b0b658c498ca92acc465a0ffeb1a794d9afede12ac4f95fd4a4b8f094caa3d6
Factual source record; not the publisher page
Phoenix data center campus
Archived copy
EdgeCore Digital Infrastructure
Company disclosure
Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Floor Area, Metric: Land Area, Metric: Power Capacity, Role: Developernot statedsource-terms-not-recordedEdgeCore Digital Infrastructure3409245d898b380fbec9363aee2417210d0946f1fee9d786ba99b90487f86d81
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). EdgeCore Mesa data center campus [site vcc-site-54d4a697323404ecfc35]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-54d4a697323404ecfc35/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction