Taylor Technology Campus (Big Watt Digital and PowerHouse)

Proposed

United States · 1 project · Last reported

Summary

Proposed 664-acre data center campus with an on-site power plant at 3301 Farm to Market Road 112, just outside Taylor in unincorporated Williamson County, Texas, developed by Big Watt Digital and PowerHouse Data Centers. Bisnow describes 500 MW of data center load with behind-the-meter generation and, citing the Austin Business Journal, says an unnamed tenant could add 500 MW. After withdrawing their annexation and zoning request in September 2026, the developers struck a deal letting the city regulate water use, noise and air quality, with reclaimed-water closed-loop cooling and about USD 28.2 million in community investments; the City Council approved it unanimously on 8 October 2026.

Source record as of 2026-10-09 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 30.57250, -97.41670 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Taylor Technology Campus (Big Watt Digital and PowerHouse)

Proposed last observed as of · Reported status

Location: Taylor, Williamson County, Texas, US. Bisnow gives the address 3301 Farm to Market Road 112; KUT places the site just outside Taylor's city limits in unincorporated Williamson County, pending annexation. The point is the Taylor city coordinate from its Wikipedia article, not the site. Bisnow; KUT News; KUT News; Wikipedia

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity500 MWPlanned · Campus · Unspecified2026-10-05Bisnow describes the campus as encompassing 500 MW of data center load alongside behind-the-meter on-site generation, without naming a source. Whether this is IT or facility load is not stated.Bisnow
Power capacity500 MWPlanned · Phase · Unspecified · Potential addition by an unnamed tenant2026-10-05Reported second-hand: Bisnow attributes this to the Austin Business Journal.Bisnow
Land area664 acresReported · Campus2026-10-09Bisnow, citing the Austin Business Journal, reported that the developers did not yet own the site.Bisnow; KUT News; KUT News
Jobs permanent320 countPlanned · Campus2026-10-05Full-time jobs estimated in a report commissioned for the project, as cited by Bisnow.Bisnow

Companies and organizations

NameRoleNotesSources
Big Watt DigitalDeveloperBisnow; KUT News; KUT News
PowerHouse Data CentersDeveloperBisnow; KUT News; KUT News
City of TaylorGovernmentNegotiated an annexation agreement letting it set standards on water use, noise, setbacks and air quality; the council approved it unanimously.KUT News; KUT News

Timeline

DateEventActual or plannedNotesSources
2026-09OtherActualDevelopers withdrew their annexation and zoning application to negotiate further on noise, water use, setbacks and community benefits, about two weeks after the planning and zoning commission delayed the item for 90 days in August.Bisnow; KUT News; KUT News
2026-10-08OtherActualTaylor City Council unanimously approved the agreement to annex the planned development at its Thursday meeting, which KUT had said was scheduled for 8 October.KUT News; KUT News

Power supply

TypeDescriptionSources
OtherBehind-the-meter on-site power plant intended to meet the campus's electricity needs; the fuel is not stated by the developers or the city in the cited sources, though a resident opposing the deal referred to gas power plants.Bisnow; KUT News; KUT News

Status stays proposed: the approval clears annexation, but no construction start, tenant or site purchase was reported. Per a city press release cited by Bisnow, cooling is closed-loop with reclaimed water (initial fill about 1.6 million gallons, no potable water), and the developers pay for utility improvements and landscaping buffers. KUT reports about USD 28.2 million in community investments, including more than USD 10 million for Taylor ISD and local students. A commissioned report cited by Bisnow estimated about USD 1.4 billion of gross tax revenue for Taylor from 2027 to 2046; no capital investment figure was found. Taylor projects by KDC and Blueprint Projects are different builds.

Sources for these details
Companies
  • Developer: Big Watt Digital (unknown scope) evidence
  • Developer: Big Watt Digital (unknown scope) evidence
  • Developer: Big Watt Digital (unknown scope) evidence
  • Developer: PowerHouse Data Centers (unknown scope) evidence
  • Developer: PowerHouse Data Centers (unknown scope) evidence
  • Developer: PowerHouse Data Centers (unknown scope) evidence
  • Government: City of Taylor (unknown scope) evidence
  • Government: City of Taylor (unknown scope) evidence
Source and location review
Status source
Taylor City Council approves deal to clear the way for a nearby data center and power plant evidence row
KUT News · published 2026-10-09 · News
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 18 days before the data update on 2026-10-27

Location details
Coordinates
30.57250, -97.41670
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Bisnow gives the address 3301 Farm to Market Road 112; KUT places the site just outside Taylor's city limits in unincorporated Williamson County, pending annexation. The point is the Taylor city coordinate from its Wikipedia article, not the site.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
900327af

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Taylor Technology Campus (Big Watt Digital and PowerHouse)
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Austin Suburb Set To Decide On Annexation, Zoning For Data Center Campus
Archived copy
Bisnow
Trade publication
Imported: Geometry, Imported: Record, Metric: Jobs Permanent, Metric: Land Area, Metric: Power Capacity, Milestone: Other, Power Source: Other, Role: Developersource-terms-not-recordedBisnowad9ada7fa80a424c9a8a229a0f73a439083dc5c8b6f82711d113b6f9df53ae28
Factual source record; not the publisher page
Taylor City Council approves deal to clear the way for a nearby data center and power plant
Archived copy
KUT News
News
Imported: Geometry, Imported: Record, Imported: Status, Metric: Land Area, Milestone: Other, Power Source: Other, Role: Developer, Role: Governmentsource-terms-not-recordedKUT News77f4fa9de1b603d06fb63c88b117a15e8afccf9f8aa3a458d63c20801e29c315
Factual source record; not the publisher page
Taylor has struck a deal on a nearby data center, allowing it to annex the site and set conditions
Archived copy
KUT News
News
Imported: Geometry, Imported: Record, Metric: Land Area, Milestone: Other, Power Source: Other, Role: Developer, Role: Governmentsource-terms-not-recordedKUT News7f4be29250be7ad0fec66513fcac5126669d3d7eefa08bf030ec5abab02e53c0
Factual source record; not the publisher page
Taylor, Texas
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipediad2131b3910821a36e87fc608831a23a74c8310d1cc10c597b4b09a23f77cfb9f
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Taylor Technology Campus (Big Watt Digital and PowerHouse) [site vcc-site-450769770dfe5ea908d6]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-450769770dfe5ea908d6/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction