Prometheus Hyperscale Evanston campus

Announced

United States · 1 project · Last reported

Summary

Proposed AI data center campus on about 506 acres of family ranchland roughly 12 miles east of Evanston, Wyoming, south of Interstate 80 in Uinta County. Prometheus Hyperscale plans 1.25 GW in a first phase with a stated path to 5 GW, run as an islanded microgrid on on-site natural gas generation rather than the public grid. Uinta County commissioners unanimously granted a conditional use permit in June 2026; the company says construction could start within six months of final permitting and take four to five years. The county sent support letters to Meta and Microsoft, but no tenant has been confirmed.

Source record as of 2026-06-22 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 41.26830, -110.96320 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Prometheus Hyperscale Evanston campus

Announced last observed as of · Reported status

Location: Evanston, Uinta County, Wyoming, US. Coordinates are the Wikipedia centroid of Evanston (s5). Local reporting places the site about 12 miles east of Evanston on the south side of Interstate 80, so the campus lies some distance east of this point. KPCW; TownLift; Wikipedia

Use: Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity1,250 MWPlanned · Phase · Unspecified · Initial phase2026-06-22Described as the initial capacity, with the first phase expected to take 48 to 60 months to build. Cowboy State Daily rounded it to 1.2 GW in February 2026. IT versus facility scope is not stated.KPCW; Baxtel; Cowboy State Daily
Power capacityup to 5,000 MWPlanned · Campus · Unspecified2026-06-22Company-stated long-term development path; no schedule given.Baxtel
Land areaabout 506 acresReported · Campus2026-06-19Ranchland held by the founder's family.KPCW; TownLift; Baxtel
Jobs construction1,500–2,000 countReported · Campus2026-02-14Estimate given by the county economic development director.Cowboy State Daily
Jobs constructionabout 8,000 countPlanned · Campus2026-06-22Construction positions by 2029 claimed by Prometheus and the Build Wyoming initiative, within a total of nearly 12,000 direct and indirect jobs. Much higher than the county's February 2026 estimate.TownLift
Jobs permanent300–400 countReported · Campus2026-02-14Initial permanent jobs estimated by the county economic development director.Cowboy State Daily

Companies and organizations

NameRoleNotesSources
Prometheus HyperscaleDeveloperKPCW; TownLift; Baxtel; Cowboy State Daily
Uinta County Board of CommissionersGovernmentGranted the conditional use permit and earlier approved letters of support addressed to Meta and Microsoft at the developer's request.KPCW; Baxtel; Cowboy State Daily

Timeline

DateEventActual or plannedNotesSources
2024AnnouncedActualThe project, formerly called Wyoming Hyperscale Whitebox, was relaunched in 2024 after an original 120 MW plan in 2020.Baxtel
2026-02OtherActualUinta County approved letters of support addressed to Meta and Microsoft, written at the developer's request.Cowboy State Daily
2026-06Permit approvedActualUinta County commissioners unanimously approved a conditional use permit after the county planning commission recommended approval; reported on 19 June 2026 as a Tuesday vote.KPCW; Baxtel

Power supply

TypeDescriptionSources
Natural gas onsitePlanned on-site natural gas generation run as an islanded microgrid instead of a grid interconnection, which the company says avoids interconnection delays. The founder has said he eventually wants to add nuclear power.KPCW; TownLift; Baxtel

Meta and Microsoft are not listed as tenants: the county's support letters were written at the developer's request, and in February 2026 the county chair said any deal was a long way off. Prometheus says its closed-loop water-glycol cooling will not draw groundwater, surface water or Bear River water, with a private on-site well for domestic plumbing. No report of final permitting or a construction start after June 2026 was found.

Sources for these details
Companies
  • Developer: Prometheus Hyperscale (unknown scope) evidence
  • Developer: Prometheus Hyperscale (unknown scope) evidence
  • Developer: Prometheus Hyperscale (unknown scope) evidence
  • Developer: Prometheus Hyperscale (unknown scope) evidence
  • Government: Uinta County Board of Commissioners (unknown scope) evidence
  • Government: Uinta County Board of Commissioners (unknown scope) evidence
  • Government: Uinta County Board of Commissioners (unknown scope) evidence
Source and location review
Status source
Proposed AI data center near Evanston advances as Prometheus courts major tech clients evidence row
TownLift · published 2026-06-22 · News
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 127 days before the data update on 2026-10-27

Location details
Coordinates
41.26830, -110.96320
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Coordinates are the Wikipedia centroid of Evanston (s5). Local reporting places the site about 12 miles east of Evanston on the south side of Interstate 80, so the campus lies some distance east of this point.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
60251015

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Prometheus Hyperscale Evanston campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
1.2-Gigawatt Data Center Near Evanston In Talks With Meta And Microsoft
Archived copy
Cowboy State Daily
News
Imported: Record, Metric: Jobs Construction, Metric: Jobs Permanent, Metric: Power Capacity, Milestone: Other, Role: Developer, Role: Governmentsource-terms-not-recordedCowboy State Dailyd4168edfe3c90f17653010c1038b05adbf0e109c05d139c7e2377d2db5b93fe2
Factual source record; not the publisher page
1.25GW data center approved on ranchland near Evanston, Wyoming
Archived copy
KPCW
News
Imported: Geometry, Imported: Record, Metric: Land Area, Metric: Power Capacity, Milestone: Permit Approved, Power Source: Natural Gas Onsite, Role: Developer, Role: Governmentsource-terms-not-recordedKPCW88a713fd4efd04c468a24ed45877aa802d6602163ca055e2292452894f0607f4
Factual source record; not the publisher page
Evanston, Wyoming
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipediad735da99d56a465320c94c3153ddbf91410f537ddfd60dc9871f7d1a17fcb89f
Factual source record; not the publisher page
Proposed AI data center near Evanston advances as Prometheus courts major tech clients
Archived copy
TownLift
News
Imported: Geometry, Imported: Record, Imported: Status, Metric: Jobs Construction, Metric: Land Area, Power Source: Natural Gas Onsite, Role: Developersource-terms-not-recordedTownLift3dc0d320aaec461c0c148ce7566867c6dd8837e7ccc44bbfa1069baf9ba1f2ea
Factual source record; not the publisher page
Wyoming Approves Prometheus Hyperscale's Gigawatt Data Center Campus
Archived copy
Baxtel
Trade publication
Imported: Record, Imported: Status, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Milestone: Permit Approved, Power Source: Natural Gas Onsite, Role: Developer, Role: Governmentsource-terms-not-recordedBaxtel747f961c2f48c23afc24d64fe7e3d7cacd6b584ff340abf14ea38e9c1eba1aa7
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Prometheus Hyperscale Evanston campus [site vcc-site-a393d0e2bc6a6f9efbd5]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a393d0e2bc6a6f9efbd5/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction