Summary

Master-planned data center park by land developer Tract on about 2,069 acres in southwest Buckeye, Arizona, south of Interstate 10 on Johnson Road near the municipal airport, on land once planned for a large housing community. Announced in August 2024 after the city council unanimously approved a development agreement and a Buckeye Tech Corridor plan amendment, it could hold up to 40 data centers and 20 million square feet, with Tract working with APS on plans for up to 1.8 GW. The project is valued at about USD 20 billion over a phased 15-year build-out. A June 2026 trade update said it had entered engineering and horizontal infrastructure preparation.

Source record as of 2026-06-15 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 33.37060, -112.59080 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Tract Buckeye data center park

Announced last observed as of · Reported status

Location: Buckeye, Arizona, US. Coordinates are the Wikipedia centroid of Buckeye (s5). Local reporting places the park in southwest Buckeye, south of Interstate 10 on Johnson Road near Buckeye Municipal Airport; the parcel was not geocoded. Arizona's Family (KTVK/KPHO); Wikipedia

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacityup to 1,800 MWPlanned · Campus · Unspecified2024-08-29Capacity Tract said it was planning with the local utility; the mayor said securing the power could take about seven years.Arizona's Family (KTVK/KPHO); Construction Review Online
Investmentabout 20,000,000,000 USDReported · Campus2024-08-12Reported total value of the park at full build-out.Arizona's Family (KTVK/KPHO); KTAR News (Phoenix Business Journal)
Investmentat least 100,000,000 USDAnnounced · Phase · Tract site infrastructure (water, power, transport)2024-08-12Tract's planned spending on water, power and transportation infrastructure for the site; reported separately from the city's development agreement terms.KTAR News (Phoenix Business Journal); Construction Review Online
Land areaabout 2,069 acresReported · Campus2024-08-31Other reports round the site to nearly 2,000 or 2,100 acres.Baxtel; Construction Review Online
Buildingsup to 40 countPlanned · Campus2024-08-31Baxtel; Construction Review Online
Floor areaup to 20,000,000 sq_ftPlanned · Campus2024-08-31Arizona's Family (KTVK/KPHO); Baxtel; Construction Review Online
Jobs constructionabout 2,000 countPlanned · Campus2024-08-12KTAR News (Phoenix Business Journal); Construction Review Online
Jobs permanentabout 500 countPlanned · Campus2024-08-12Full-time jobs estimated in August 2024 coverage of the council approval; Arizona's Family separately reported about 300 high-paying jobs.KTAR News (Phoenix Business Journal); Construction Review Online

Companies and organizations

NameRoleNotesSources
TractDeveloperDenver-based master developer of the park, which is meant to host hyperscale and wholesale data center operators.Arizona's Family (KTVK/KPHO); KTAR News (Phoenix Business Journal); Baxtel; Construction Review Online
Arizona Public ServiceUtilityTract said it was working with APS on plans to support up to 1.8 GW; no supply agreement has been reported.Arizona's Family (KTVK/KPHO); Construction Review Online
City of BuckeyeGovernmentApproved the development agreement, including reimbursement of up to USD 50 million of public infrastructure costs once the project generates USD 60 million for the city.KTAR News (Phoenix Business Journal)

Timeline

DateEventActual or plannedNotesSources
2024-08-06Zoning approvedActualBuckeye City Council unanimously approved the development agreement with Tract and a major plan amendment creating the Buckeye Tech Corridor.KTAR News (Phoenix Business Journal)
2024-08AnnouncedActualArizona's Family (KTVK/KPHO); Baxtel
2026OtherActualReported as having entered engineering and horizontal infrastructure preparation as of 2026.Construction Review Online

Power supply

TypeDescriptionSources
GridAPS service planned; Tract said it was working with the utility on infrastructure for up to 1.8 GW. In September 2026 APS said it had made no commitments to serve additional data centers since January 2024 because of grid constraints; the article does not mention this park.Arizona's Family (KTVK/KPHO); Construction Review Online; KJZZ

The Construction Review article was first published on 8 August 2024 and updated on 15 June 2026; its statement that the park entered engineering and horizontal infrastructure preparation comes from that update, so status_as_of uses the update date. Status stays at announced because no data center building is reported under construction. Whether Tract holds an APS service commitment predating the utility's January 2024 cutoff was not found.

Sources for these details
Companies
  • Developer: Tract (unknown scope) evidence
  • Developer: Tract (unknown scope) evidence
  • Developer: Tract (unknown scope) evidence
  • Developer: Tract (unknown scope) evidence
  • Utility: Arizona Public Service (unknown scope) evidence
  • Utility: Arizona Public Service (unknown scope) evidence
  • Government: City of Buckeye (unknown scope) evidence
Source and location review
Status source
$20bn Tract Data Center Park in Buckeye Advances to Horizontal Infrastructure Preparation Phase evidence row
Construction Review Online · published 2024-08-08 · Trade publication
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 134 days before the data update on 2026-10-27

Location details
Coordinates
33.37060, -112.59080
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Coordinates are the Wikipedia centroid of Buckeye (s5). Local reporting places the park in southwest Buckeye, south of Interstate 10 on Johnson Road near Buckeye Municipal Airport; the parcel was not geocoded.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
b46f3107

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Tract Buckeye data center park
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
$20 billion data center campus gets green light in Buckeye
Archived copy
KTAR News (Phoenix Business Journal)
News
Imported: Record, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Milestone: Zoning Approved, Role: Developer, Role: Governmentsource-terms-not-recordedKTAR News (Phoenix Business Journal)56931a18fcf765074291ed065d7d422ec100c0ed835e251eb7b98e3b71fc5b16
Factual source record; not the publisher page
$20bn Tract Data Center Park in Buckeye Advances to Horizontal Infrastructure Preparation Phase
Archived copy
Construction Review Online
Trade publication
Imported: Record, Imported: Status, Metric: Buildings, Metric: Floor Area, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Metric: Land Area, Metric: Power Capacity, Milestone: Other, Power Source: Grid, Role: Developer, Role: Utilitysource-terms-not-recordedConstruction Review Onlineeb41aa4e24cdf184be7ef098a441c89eace0e053c3be6502a9196ebf466de03b
Factual source record; not the publisher page
APS says it can't commit to new data centers because of electric grid constraints
Archived copy
KJZZ
News
Imported: Record, Power Source: Gridsource-terms-not-recordedKJZZ227c6b692ce922e2448ea2e79d3a92ed1b166e138e79f5ba374dfdbb346a05e4
Factual source record; not the publisher page
Buckeye, Arizona
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia07270fd2de4e4f6858444757c44bb86114ced8e466308307f645d04d9b5dde19
Factual source record; not the publisher page
Developer wants to power the future of AI in Buckeye with new data center
Archived copy
Arizona's Family (KTVK/KPHO)
News
Imported: Geometry, Imported: Record, Metric: Floor Area, Metric: Investment, Metric: Power Capacity, Milestone: Announced, Power Source: Grid, Role: Developer, Role: Utilitysource-terms-not-recordedArizona's Family (KTVK/KPHO)fc16057d1720f75c689dab6d1f4a99bcbc29a5c3a2157cb1aa057c27b40b529b
Factual source record; not the publisher page
Tract announces new gigawatt-scale data center park in Phoenix, Arizona
Archived copy
Baxtel
Trade publication
Imported: Record, Metric: Buildings, Metric: Floor Area, Metric: Land Area, Milestone: Announced, Role: Developersource-terms-not-recordedBaxtel96824ea7befbc04c7ec87a65ac08a69b2d35ac660f43176f7e2de093fc7c8db5
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Tract Buckeye data center park [site vcc-site-7cb4c635a0469cf8e507]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7cb4c635a0469cf8e507/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction