Volcano Engine Inner Mongolia Horinger Compute Centre — Phase 1 Campus
Completed
China · 1 project · Last reported
Summary
On 27 October 2026 the Horinger New Area planning and construction bureau reported that the 10-1 data-centre machine-room building works of the Volcano Engine Inner Mongolia Horinger Compute Centre Phase 1 A project had recently completed their construction completion-acceptance filing (竣工验收备案). The works are the 10-1 machine-room building, 32,138.14 m2 of floor area, with a stated IT capacity of 26 MW. The record covers construction completion of building 10-1 only: operation is described as a future step and is not asserted, the 26 MW is a design figure and not installed load, and the other Phase 1 A machine-room buildings (10-2 to 10-4), the separately accepted integrated building, the 110 kV substation, Phase 1 B (10-5 to 10-8) and the separate Phase 2 park are not included. evidence
Planning and Construction Bureau of the Hohhot Area of the Inner Mongolia Pilot Free Trade Zone and Horinger New Area (自贸试验区呼和浩特片区、和林格尔新区规划建设局) · published 2026-10-27
Location
The interactive map needs JavaScript. Display anchor: 40.58596, 111.84670 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Campus reference; individual project footprints are not mapped.
Projects (1)
Volcano Engine Inner Mongolia Horinger Compute Centre Phase 1 A — 10-1 data-centre machine-room building
Completed last observed as of · Authoritative status update
Earlier version (67 pages) of the same EIA form, with the same printed coordinate. Attachment 2 (PDF page 57) reproduces the Horinger New Area Management Committee project filing notice (project code 2409-150123-89-01-454670; builder Hohhot Saibei Hongcheng Technology Co., Ltd.; location Yungu area, east to Shengshi Road (盛世路), south to Yungu Heng 28 Road (云谷横28路), west to Shenglian Road (盛联路), north to Yunkun Avenue (云鲲大街); 259,933.23 m2 of land, of which Phase 1 A 119,698.23 m2 and Phase 1 B 140,235 m2; Phase 1 A four new machine-room buildings (128,274.36 m2), one integrated building (9,406.59 m2) containing the new boiler room, one 110 kV substation and ancillary works; Phase 1 B four machine-room buildings; planned construction 1 October 2024 to 30 October 2026). Attachment 3 (PDF pages 58-59) reproduces the land planning conditions (class 1 industrial land west of the existing parcel line, bounded by Yungu Heng 28 Road, Shenglian Road and Yunkun Avenue) and a parcel plan (宗地图) on the 2000 national geodetic coordinate system with a ten-point boundary-coordinate table. Figure 4 (PDF page 65) is the Phase 1 general layout: machine-room buildings 10-1, 10-2 and 10-3 in the western column, 10-4 south of the integrated building, and the boiler house inside the integrated building at the north of the western half, immediately east of 10-1; 10-5 to 10-8 form the eastern half. Surveyor names printed on the parcel plan are not reproduced. evidence
Hohhot Ecology and Environment Bureau (呼和浩特市生态环境局) · publication date not stated
Acceptance notice dated 18 June 2025: project name Volcano Engine Inner Mongolia Horinger Compute Centre Phase 1 project; location Horinger County, Hohhot; builder Hohhot Saibei Hongcheng Technology Co., Ltd.; the full EIA report form is attached (the accepted-version PDF used as the locator source). An acceptance notice is not an approval and an environmental approval for a boiler house is not development consent. evidence
Hohhot Ecology and Environment Bureau (呼和浩特市生态环境局) · published 2025-06-18
Published 12 December 2025 (PubDate meta 2025-12-12 16:22): the Phase 1 A integrated building of the Volcano Engine Inner Mongolia Horinger Compute Centre recently passed completion acceptance; the item repeats the four boundary roads (Shengshi Road east, Yungu Heng 28 Road south, Shenglian Road west, Yunkun Avenue north). Identity context: it ties the integrated building, which contains the EIA's boiler house, to Phase 1 A. Outside the window and a different building, so not a status observation for 10-1. evidence
Inner Mongolia Horinger New Area Planning and Construction Bureau (内蒙古和林格尔新区规划建设局) · published 2025-12-12
EIA report form for the indoor 110 kV substation (4 x 80 MVA) of the Volcano Engine Inner Mongolia Horinger Compute Centre Phase 1 A project. It places the station in the south-west corner of the Phase 1 A plant area (厂区内西南角), prints its centre as 40 deg 35 min 0.462 s N, 111 deg 50 min 43.120 s E, and gives four station corner points in table 2-4. Used only as an independent cross-check of the Phase 1 A parcel and coordinate frame: all four corner points and the printed centre fall inside the Phase 1 A parcel computed from the CGCS2000 parcel plan, the corners at its south-west corner (0.5-36 m from the parcel boundary), about 300-410 m south-west of the boiler-house point. The printed centre lies about 78 m from the centroid of the four corners (an internal inconsistency of the report; neither is used as the locator). evidence
Inner Mongolia Autonomous Region Department of Ecology and Environment · published 2025-02-26
- Companies
Source and location review
- Status source
- Horinger New Area news item: 'Volcano Engine Inner Mongolia Horinger Compute Centre Phase 1 A project 10-1 data-centre machine-room building works complete their completion-acceptance filing' (火山引擎内蒙古和林格尔算力中心一期A项目10-1数据中心机房楼工程完成竣工验收备案), 27 October 2026 evidence row
Planning and Construction Bureau of the Hohhot Area of the Inner Mongolia Pilot Free Trade Zone and Horinger New Area (自贸试验区呼和浩特片区、和林格尔新区规划建设局) · published 2026-10-27 · Government record - Locator
- Campus locator · Official source · official_eia_on_campus_boiler_house_point_parcel_checked evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 0 days before the data update on 2026-10-27
Location details
- Coordinates
- 40.58596, 111.84670
- Geometry licence
- all-rights-reserved
- Use scope
- Campus locator
- Scope class
- official_eia_on_campus_boiler_house_point_parcel_checked
- Authority
- Official source
- Source entity
- Campus
- Method
- official_eia_geographic_dms_point_transcription_with_cgcs2000_parcel_and_imagery_check
- Derivation
- direct_geometry
- Precision scope
- EIA point of the Phase 1 A gas boiler house inside the integrated building, which lies at the north of the Phase 1 A parcel, immediately east of building 10-1. The point is inside the Phase 1 A parcel computed from its CGCS2000 parcel plan, 54 m from the parcel boundary and 155 m from the parcel centroid, and about 165 m east-north-east of the visual centre of building 10-1. It locates the Phase 1 A campus of the compute centre; it is not the footprint or centre of building 10-1, nor an entrance, and it does not locate Phase 1 B (east of Phase 1 A) or the separate Phase 2 park.
- Horizontal uncertainty
Not reported
The report states no datum or positional accuracy. The WGS84/CGCS2000 reading is supported by the point lying inside the Phase 1 A parcel computed from the parcel plan's CGCS2000 boundary coordinates and by the parcel's agreement with independent Esri imagery of unstated accuracy and date (manual visual comparison, roughly 10 m). The point marks the integrated-building block about 165 m from the centre of building 10-1. Decimal places are transcription precision, not accuracy.
- Geometry evidence
- 2130cbd0
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Environmental impact report form (accepted version): Volcano Engine Inner Mongolia Horinger Compute Centre Phase 1 project, gas boiler house (火山引擎内蒙古和林格尔算力中心一期项目环境影响报告表), attached to the Hohhot Ecology and Environment Bureau acceptance notice of 18 June 2025 Archived copy | Hohhot Ecology and Environment Bureau (呼和浩特市生态环境局) Environmental assessment document | Geometry, Owner claim | not stated | all-rights-reserved | 呼和浩特市生态环境局; report form prepared for 呼和浩特市塞北红城科技有限公司 | 68137319695787cf288b09c756bd599374b09a89e0c6766b781905b3eb62dd22Retained source material; see source provenance | |
| Environmental impact report form (earlier publicised version with attachments and figures): Volcano Engine Inner Mongolia Horinger Compute Centre Phase 1 project gas boiler house, attached to the Hohhot Ecology and Environment Bureau acceptance notice of March 2025 Archived copy | Hohhot Ecology and Environment Bureau (呼和浩特市生态环境局) Environmental assessment document | Site and project identity | not stated | all-rights-reserved | 呼和浩特市生态环境局; report form prepared for 呼和浩特市塞北红城科技有限公司 | 34883c10c49b952dae04cf32b9aba01509000f05e15a09ccb12c0d3e83615337Retained source material; see source provenance | |
| Environmental impact report form: Volcano Engine Inner Mongolia Horinger Compute Centre Phase 1 A project 110 kV substation (火山引擎内蒙古和林格尔算力中心一期A项目110kV变电站工程环境影响报告表), Inner Mongolia Department of Ecology and Environment radiation-EIA approval-result publicity of 26 February 2025 Archived copy | Inner Mongolia Autonomous Region Department of Ecology and Environment Environmental assessment document | Site and project identity | all-rights-reserved | Inner Mongolia Autonomous Region Department of Ecology and Environment | f9797dc28eff21b9ace520ccd242427ef03c94599f49e7d7173fcca043f3290cRetained source material; see source provenance | ||
| Esri World Imagery EPSG:4326 export around the Volcano Engine Horinger Phase 1 A parcel (request bbox 111.8395-111.8545E, 40.5800-40.5900N) Archived copy | Esri Map feature | Site and project identity | not stated | all-rights-reserved | Esri, Maxar, Earthstar Geographics and the GIS user community (World Imagery) | c6a3574a0119df9b9af931682225eaf2661c21ae64e41533ae231ab782eca47cRetained source material; see source provenance | |
| Hohhot Ecology and Environment Bureau: acceptance notice for the EIA document of the Volcano Engine Inner Mongolia Horinger Compute Centre Phase 1 project (关于火山引擎内蒙古和林格尔算力中心一期项目环境影响评价文件受理情况公示) Archived copy | Hohhot Ecology and Environment Bureau (呼和浩特市生态环境局) Government record | Site and project identity | all-rights-reserved | 呼和浩特市生态环境局 | 3188e504ea20deea7e90b2630c06e1b307b7dc66ed3a49e1174d5212ff66333dRetained source material; see source provenance | ||
| Horinger New Area major-project information: integrated building of the Volcano Engine Inner Mongolia Horinger Compute Centre Phase 1 A project passes completion acceptance (火山引擎内蒙古和林格尔算力中心一期A项目综合楼顺利通过竣工验收), 12 December 2025 Archived copy | Inner Mongolia Horinger New Area Planning and Construction Bureau (内蒙古和林格尔新区规划建设局) Government record | Site and project identity | all-rights-reserved | 内蒙古和林格尔新区规划建设局, via the Horinger New Area Management Committee website (hlgena.huhhot.gov.cn) | 44b652fb2f48f01a578803df526ecc55c3aba91cca9c25ccadf8f39969f2c777Retained source material; see source provenance | ||
| Horinger New Area news item: 'From WAIC to Inner Mongolia Horinger New Area: three looks at the compute acceleration in the free trade zone' (从WAIC到内蒙古和林格尔新区:“三看”自贸试验区里的算力“加速度”), 10 August 2026 Archived copy | Inner Mongolia Horinger New Area Party-Mass Service Center (内蒙古和林格尔新区党群服务中心) Government record | Site and project identity, Physical status, Operator claim | all-rights-reserved | 内蒙古和林格尔新区党群服务中心, via the Horinger New Area Management Committee website (hlgena.huhhot.gov.cn) | 6cccbcc8c8de9c82f37e7af13ba3a6ae74ba5c35b18905bc478a8d386d81ff15Retained source material; see source provenance | ||
| Horinger New Area news item: 'Volcano Engine Inner Mongolia Horinger Compute Centre Phase 1 A project 10-1 data-centre machine-room building works complete their completion-acceptance filing' (火山引擎内蒙古和林格尔算力中心一期A项目10-1数据中心机房楼工程完成竣工验收备案), 27 October 2026 Archived copy | Planning and Construction Bureau of the Hohhot Area of the Inner Mongolia Pilot Free Trade Zone and Horinger New Area (自贸试验区呼和浩特片区、和林格尔新区规划建设局) Government record | Physical status, User claim | all-rights-reserved | 自贸试验区呼和浩特片区、和林格尔新区规划建设局, via the Horinger New Area Management Committee website (hlgena.huhhot.gov.cn) | d75a551cd23680cff10d153497858f225b247d0678bc55b6b77f4781e29d4183Retained source material; see source provenance |