BONC Horinger Intelligent Computing Centre (Industrial Internet Northern Regional Center)

Operational

China · 1 project · Last reported

Summary

On 10 August 2026 the Horinger New Area Party-Mass Service Center published on the New Area management committee's website that the BONC (东方国信) Horinger intelligent computing centre currently serves customers. Its customers cover research institutions and AI service providers, and its orders for domestic customised compute are growing steadily. The item also gives a CNY 4.8 billion total investment and a plan for more than 100,000 P of intelligent compute. This present-tense government statement supports current operation of the existing base as of the publication date. It names no building or phase. The August 2025 substation EIA says Phase 1 has operated since 2025 and Phase 2 is under construction. Completion or operation of Phase 2, and the planned capacity, are not asserted. evidence

Inner Mongolia Horinger New Area Party-Mass Service Center (内蒙古和林格尔新区党群服务中心) · published 2026-08-10

Location

The interactive map needs JavaScript. Display anchor: 40.54201, 111.81067 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (1)

BONC Horinger Intelligent Computing Centre — existing operations

Operational last observed as of · Authoritative status update

Acceptance publicity page dated 26 August 2025 (发布日期) in the Hohhot EEB 'project acceptance' list. It attaches the report form used as the locator source. It identifies the project as the 2# 110 kV substation of BONC Industrial Internet Northern Regional Center Phase 2. evidence

Hohhot Ecology and Environment Bureau · published 2025-08-26

EIA report form (60 pages, compiled March 2025) for two 110 kV cable lines built by the Hohhot Power Supply Branch of Inner Mongolia Power (Group) to the BONC project. One runs 2.60 km from the Shengle 220 kV substation and one 5.85 km from the Hesheng 220 kV substation, both in the Yungu area of Horinger New Area. Both end at cable joint wells DJ2 (111°48'25.93", 40°32'34.53") and DJ1 (111°48'25.78", 40°32'34.22") north of the BONC campus's own planned 110 kV substation, south of Shuju Street (数聚大街). Beyond the wells, BONC's local company builds the cables to its own substation. Hohhot DRC approval 呼发改审批电字【2025】10号. It lists the China Mobile Hohhot Data Center among the nearby projects. evidence

Hohhot Ecology and Environment Bureau · published 2025-06-10

Acceptance publicity page dated 10 June 2025 attaching the supply-line report form. evidence

Hohhot Ecology and Environment Bureau · published 2025-06-10

Approval letter dated 26 June 2025 (listed 3 July 2025) to the Hohhot Power Supply Branch. It approves two new 110 kV lines in the Yungu area of Horinger New Area, from the Hesheng 220 kV substation (5.85 km) and the Shengle 220 kV substation (2.60 km), both ending at BONC (止于东方国信). evidence

Hohhot Ecology and Environment Bureau · published 2025-07-03

Undated corporate introduction. It says the company takes part in the 'East Data West Computing' programme and has laid out data-centre clusters to a high standard. Its Inner Mongolia Horinger intelligent computing base (内蒙古和林格尔智算基地) was reported by CCTV as a key project of the national hub node. Used only to confirm that BONC describes a single Horinger intelligent computing base. evidence

BONC (东方国信; 北京东方国信科技股份有限公司) · publication date not stated

Georeferenced imagery extract used only for a qualitative check of the EIA point. The point falls in the central-east, largely unbuilt part of a road-bounded block. Built data-hall buildings occupy the block's west part and a residential compound adjoins it to the east. The China Mobile Hohhot data-centre block lies south of an east-west road. See the geometry facts file. Not a lifecycle observation. evidence

Esri · publication date not stated

Companies
  • Owner: Inner Mongolia BONC Technology Co., Ltd. (内蒙古东方国信科技有限公司) (current) evidence
  • Operator: BONC (东方国信; 北京东方国信科技股份有限公司) (current) evidence
Source and location review
Status source
Horinger New Area news item: 'From WAIC to Inner Mongolia Horinger New Area: three looks at the compute acceleration in the free trade zone' (从WAIC到内蒙古和林格尔新区:“三看”自贸试验区里的算力“加速度”), 10 August 2026 evidence row
Inner Mongolia Horinger New Area Party-Mass Service Center (内蒙古和林格尔新区党群服务中心) · published 2026-08-10 · Government record
Locator
Campus locator · Official source · official_eia_on_campus_substation_locator evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 78 days before the data update on 2026-10-27

Location details
Coordinates
40.54201, 111.81067
Geometry licence
all-rights-reserved
Use scope
Campus locator
Scope class
official_eia_on_campus_substation_locator
Authority
Official source
Source entity
Campus
Method
official_eia_geographic_dms_point_transcription
Derivation
direct_geometry
Precision scope
EIA station-centre point of the campus's planned 2# 110 kV substation, which the report places in the central-east of the BONC Industrial Internet Northern Regional Center plant area (about 13.1 ha). It locates the campus through on-campus support infrastructure. It is not an operating data-centre building, a parcel centroid, an entrance or the construction extent.
Horizontal uncertainty
Not reported

No survey accuracy is stated. The datum and transcription are checked by the 1.4 m agreement with the report's CGCS2000 corner coordinates. The point marks the planned 2# substation, not the operating Phase 1 buildings; its offset from them is unknown but within the campus, which extends a few hundred metres around the point. Decimal places are transcription precision, not accuracy.

Geometry evidence
48b3c190

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for BONC Horinger Intelligent Computing Centre (Industrial Internet Northern Regional Center)
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
BONC (东方国信) corporate homepage: company introduction
Archived copy
BONC (东方国信; 北京东方国信科技股份有限公司)
Company disclosure
Site and project identitynot statedall-rights-reservedBONC (东方国信), www.bonc.com.cn843d870a750a8744e8298530ecc1a68d254653ec2119483c338d74e17833e2bc
Retained source material; see source provenance
Environmental impact report form: 110 kV supply-line works for the BONC Industrial Internet Northern Regional Center project (东方国信工业互联网北方区域中心项目配套110千伏供电线路工程), published with the Hohhot EEB acceptance notice of 10 June 2025
Archived copy
Hohhot Ecology and Environment Bureau
Government record
Site and project identityall-rights-reserved呼和浩特市生态环境局 (Hohhot Ecology and Environment Bureau)0d8ea7f36097b81bfa2ab63858a1edfab62b3fd82d1a5337718b01fb21225d83
Retained source material; see source provenance
Environmental impact report form: BONC Industrial Internet Northern Regional Center Phase 2 2# 110 kV substation (东方国信工业互联网北方区域中心项目二期工程2#110kV变电站工程), published with the Hohhot EEB acceptance notice of 26 August 2025
Archived copy
Hohhot Ecology and Environment Bureau
Government record
Geometry, Owner claimall-rights-reserved呼和浩特市生态环境局 (Hohhot Ecology and Environment Bureau)fa5305341ec1d747a0067923a8f0155d2c3ee6a2896639376211a3ac8a6d0df9
Retained source material; see source provenance
Esri World Imagery export: Horinger New Area Yungu area around the BONC campus (EPSG:4326, 111.800-111.822E, 40.533-40.548N)
Archived copy
Esri
Other
Site and project identitynot statedEsri World Imagery terms of use; not redistributedEsri, Maxar, Earthstar Geographics, and the GIS User Community (Esri World Imagery)13362bf7b80a7774e7fe6cb0ca29b0a9b63532f0c627e60f387fe05bc875cff8
Retained source material; see source provenance
Hohhot EEB approval 呼环政批字〔2025〕31号 of the EIA report form for the 110 kV supply-line works of the BONC Industrial Internet Northern Regional Center project (26 June 2025)
Archived copy
Hohhot Ecology and Environment Bureau
Government record
Site and project identityall-rights-reserved呼和浩特市生态环境局 (Hohhot Ecology and Environment Bureau)21e60d5074dd9685fce95e6c18f9403a53b69926f2fa6b86a13d468ccb1694fa
Retained source material; see source provenance
Hohhot EEB notice of acceptance of the EIA document for the 110 kV supply-line works of the BONC Industrial Internet Northern Regional Center project (10 June 2025)
Archived copy
Hohhot Ecology and Environment Bureau
Government record
Site and project identityall-rights-reserved呼和浩特市生态环境局 (Hohhot Ecology and Environment Bureau)7fe413a1489fb95fbafe52be269c2d4c011ee023d831765e56fcb66dba018638
Retained source material; see source provenance
Hohhot EEB notice of acceptance of the EIA document for the BONC Industrial Internet Northern Regional Center Phase 2 2# 110 kV substation (26 August 2025)
Archived copy
Hohhot Ecology and Environment Bureau
Government record
Site and project identityall-rights-reserved呼和浩特市生态环境局 (Hohhot Ecology and Environment Bureau)0ca6bb15f66376e65af7f21bfc64b02342bc0c4697ed3be2e90b2b8c5084cf2d
Retained source material; see source provenance
Horinger New Area news item: 'From WAIC to Inner Mongolia Horinger New Area: three looks at the compute acceleration in the free trade zone' (从WAIC到内蒙古和林格尔新区:“三看”自贸试验区里的算力“加速度”), 10 August 2026
Archived copy
Inner Mongolia Horinger New Area Party-Mass Service Center (内蒙古和林格尔新区党群服务中心)
Government record
Site and project identity, Physical status, Operator claimall-rights-reserved内蒙古和林格尔新区党群服务中心, via the Horinger New Area Management Committee website (hlgena.huhhot.gov.cn)6cccbcc8c8de9c82f37e7af13ba3a6ae74ba5c35b18905bc478a8d386d81ff15
Retained source material; see source provenance
Cite this site

Kyars, K. (2026). BONC Horinger Intelligent Computing Centre (Industrial Internet Northern Regional Center) [site vcc-site-8b806f7ae4b0034de59b]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8b806f7ae4b0034de59b/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction