Microsoft Villamayor de Gállego datacenter campus (Aragón)

Announced

Spain · 1 project · Last reported

Summary

Planned Microsoft datacenter campus on Villamayor de Gállego land at the Malpica industrial estate northeast of Zaragoza, the third Aragón site Microsoft disclosed. The regional government declared it of regional interest in July 2024, citing EUR 2.2 billion of total investment and EUR 365.3 million for an initial phase. The November 2025 regional plan (PIGA Región MSFT) lists 81 hectares and about EUR 1.73 billion, with 50 MW secured for a first phase and up to 300 MW sought later. A modified plan went out for public comment in July 2026, and Forbes reported first operation was expected from 2030.

Source record as of 2026-09-04 · Details and sources

The planning directorate's notice of 28 September 2026, published in the Boletín Oficial de Aragón on 2 October 2026 within the procedure for approving the PIGA "Implantación de la Región Microsoft en Aragón" (Microsoft 7724 Spain, SL), records that the promoter's July 2026 documentation contains the environmental impact studies of the urbanisation projects of the three centres in La Muela, Zaragoza and Villamayor de Gállego, and that the public-information procedure on the studies for those three sites had been opened (by Orden VFL/1111/2026, BOA of 30 July 2026). This dated government record keeps the Villamayor de Gállego campus announced; no definitive approval, licence or works are established. evidence

Gobierno de Aragón, Boletín Oficial de Aragón · published 2026-10-02

Location

The interactive map needs JavaScript. Display anchor: 41.68570, -0.77400 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Microsoft Villamayor de Gállego datacenter campus (Aragón)

Announced last observed as of · Project announcement

This record reports announced as of 2026-09-04. elDiario.es

Location: Villamayor de Gállego, Zaragoza, Aragón, ES. Municipality centroid from Nominatim. Sources place the campus on Villamayor de Gállego land associated with the Polígono Malpica, whose named substation (Malpica) serves it; the parcel itself is not identified. Vozpópuli; Inspenet; elDiario.es

Use: Cloud, Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Investment2,200,000,000 EURAnnounced · Campus2024-07-03Total cited when the regional interest declaration was made; the Vozpópuli headline rounds it to EUR 2 billion.Vozpópuli; Inspenet
Investment365,300,000 EURAnnounced · Phase · Initial construction phase2024-07-03Vozpópuli; Inspenet
Investment1,733,000,000 EURReported · Campus2025-11-14Per-site figure in the November 2025 PIGA as reported by elDiario.es; lower than the 2024 figure, and the sources do not explain the difference.elDiario.es
Power capacity50 MWPlanned · Phase · Unspecified · First phase2025-11-14elDiario.es; Forbes España
Power capacityup to 300 MWPlanned · Campus · Unspecified2025-11-14Second-phase aspiration per campus in the PIGA, as reported by elDiario.es; Forbes gives 250-300 MW per campus over about ten years.elDiario.es; Forbes España
Land area81 hectaresPlanned · Campus2025-11-14elDiario.es
Jobs construction2,000 countPlanned · Phase · Initial construction phase2024-07-03Inspenet describes these as jobs during construction; Vozpópuli says the initial phase will employ 2,000 people.Vozpópuli; Inspenet
Jobs permanentabout 300 countPlanned · Campus2024-07-03Vozpópuli; Inspenet

Companies and organizations

NameRoleNotesSources
MicrosoftDeveloperVozpópuli; Inspenet; elDiario.es; Forbes España
Gobierno de AragónGovernmentDeclared the project of regional interest and is processing the PIGA regional plan.Vozpópuli; elDiario.es; Forbes España

Timeline

DateEventActual or plannedNotesSources
2024-07-03AnnouncedActualAragón's governing council declared the campus of regional interest.Vozpópuli; Inspenet
2025-11-14OtherActualInitial approval of the PIGA Región MSFT plan covering La Muela, Villamayor de Gállego and Zaragoza, opening a public information period.elDiario.es; Forbes España
2026-07-30OtherActualA modification of the PIGA was published in the Boletín Oficial de Aragón for public comment.elDiario.es
2030First operationalPlannedForbes reported the first phase was expected to operate from 2030.Forbes España

Power supply

TypeDescriptionSources
GridGrid supply through a new substation (named Malpica) starting at 132 kV with a later upgrade to 220 kV.elDiario.es

Investment figures conflict between the 2024 declaration (EUR 2.2 billion) and the 2025 PIGA (about EUR 1.73 billion); both are kept with their dates. In 2024 the sources put Microsoft's investment across its three Aragón sites at EUR 6.6 billion. No government primary source was opened; Boletín Oficial de Aragón entries should be added when available.

Related projects: microsoft aragon la muela, microsoft aragon zaragoza puerto venecia

Sources for these details
Companies
  • Developer: Microsoft (unknown scope) evidence
  • Developer: Microsoft (unknown scope) evidence
  • Developer: Microsoft (unknown scope) evidence
  • Developer: Microsoft (unknown scope) evidence
  • Government: Gobierno de Aragón (unknown scope) evidence
  • Government: Gobierno de Aragón (unknown scope) evidence
  • Government: Gobierno de Aragón (unknown scope) evidence
Source and location review
Status source
BOA no. 192 of 2 October 2026 (csv BOA20261002018): notice of the Dirección General de Planificación Logística y Ordenación del Territorio submitting new strategic environmental documentation of the PIGA "Implantación de la Región Microsoft en Aragón" (Microsoft 7724 Spain, SL) to public information evidence row
Gobierno de Aragón, Boletín Oficial de Aragón · published 2026-10-02 · Government record
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 25 days before the data update on 2026-10-27

Location details
Coordinates
41.68570, -0.77400
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Municipality centroid from Nominatim. Sources place the campus on Villamayor de Gállego land associated with the Polígono Malpica, whose named substation (Malpica) serves it; the parcel itself is not identified.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
e35f6456

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Microsoft Villamayor de Gállego datacenter campus (Aragón)
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Aragón da luz verde a un centro de datos de Microsoft con una inversión de 2.000 millones
Archived copy
Vozpópuli
News
Imported: Geometry, Imported: Record, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Milestone: Announced, Role: Developer, Role: Governmentsource-terms-not-recordedVozpópuli11d83534715af1b9fd187188aa55f21a1741609d9a46f716802523faacfadc86
Factual source record; not the publisher page
BOA no. 192 of 2 October 2026 (csv BOA20261002018): notice of the Dirección General de Planificación Logística y Ordenación del Territorio submitting new strategic environmental documentation of the PIGA "Implantación de la Región Microsoft en Aragón" (Microsoft 7724 Spain, SL) to public information
Archived copy
Gobierno de Aragón, Boletín Oficial de Aragón
Government record
Project announcementpublic-sector-informationBoletín Oficial de Aragón, Gobierno de Aragón543eae841f285d98b914d15d6876629aa36be57821ddf634706d71dde9afd804
Retained source material; see source provenance
Microsoft abrirá otro centro de datos en Aragón (el tercero)
Archived copy
Inspenet
Trade publication
Imported: Geometry, Imported: Record, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Milestone: Announced, Role: Developersource-terms-not-recordedInspenetf6d870174f663042c654502145b660201ec7e58925c6fd82867b8eab965a9199
Factual source record; not the publisher page
Microsoft avanza con su red de centros de datos en Zaragoza, donde proyecta una de sus mayores regiones en Europa
Archived copy
elDiario.es
News
Imported: Geometry, Imported: Record, Metric: Investment, Metric: Land Area, Metric: Power Capacity, Milestone: Other, Power Source: Grid, Role: Developer, Role: Governmentsource-terms-not-recordedelDiario.es56457d526fcfc7a719fa128725dbe7a57b8399f404281d3914ddc70f685dc990
Factual source record; not the publisher page
Microsoft obtiene luz verde para su ambicioso proyecto de centros de datos en Aragón
Archived copy
Forbes España
News
Imported: Record, Metric: Power Capacity, Milestone: First Operational, Milestone: Other, Role: Developer, Role: Governmentsource-terms-not-recordedForbes España925ed1313fbda1781670d1935ccfe139098e7d3757cc6d39954b86782c4ba9c4
Factual source record; not the publisher page
ZeC presenta 25 alegaciones al plan de Microsoft y exige a la alcaldesa de Zaragoza paralizar un centro de datos
Archived copy
elDiario.es
News
Imported: Record, Imported: Status, Milestone: Othersource-terms-not-recordedelDiario.es7d0104540f8563169d4fef2e8f4ec29f5103e98bc2a317177a20606650b961b9
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Microsoft Villamayor de Gállego datacenter campus (Aragón) [site vcc-site-b74f3c274a5a8c1e01da]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b74f3c274a5a8c1e01da/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction