SoftBank-Sesterce Bosquel AI data center
Announced
France · 1 project · Last reported
Summary
A joint venture majority-owned by SoftBank Group and formed with Sesterce was selected to develop and operate a 1 GW AI data center campus in Bosquel, Somme, in the Hauts-de-France region. Announced on 2026-05-30 as part of the 2026 Choose France summit, it is one of three named Hauts-de-France sites in SoftBank's 5 GW France plan. No investment figure, construction schedule or permit status has been published for the site; SoftBank cites about 400 long-term jobs once it operates.
Source record as of 2026-06-01 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 49.73910, 2.21790 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Town or locality reference only; the facility position is not established.
Projects (1)
SoftBank-Sesterce Bosquel AI data center
Announced last observed as of · Reported status
Location: Bosquel, Somme, Hauts-de-France, FR. Nominatim centroid of the commune of Bosquel (Somme); sources name the commune only. SoftBank Group; Sesterce
Use: Ai unspecified
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | 1,000 MW | Planned · Campus · Unspecified | 2026-05-31 | SoftBank Group; Sesterce | |
| Jobs permanent | 400 count | Planned · Campus | 2026-05-31 | SoftBank Group |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| SoftBank Group | Developer | Majority owner of the joint venture. | SoftBank Group; Sesterce |
| Sesterce | Developer | Joint venture partner; the venture as a whole was selected to develop and operate the campus. | SoftBank Group; Sesterce |
| Communauté de communes Somme Sud-Ouest | Government | Named as a partner; the Somme prefect refers to a call for expressions of interest launched by the CC2SO, the community of communes' abbreviation. | SoftBank Group; Sesterce |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2026-05-30 | Announced | Actual | Announced in Paris alongside SoftBank's 5 GW France plan at Choose France 2026. | SoftBank Group; SoftBank Group |
SoftBank's France plan gives an initial EUR 45 billion for 3.1 GW across Dunkirk (Loon-Plage), Bosquel and Bouchain by 2031, without a per-site split, so no investment is attributed to Bosquel. The campus design is by architecture firm Patriarche.
Sources for these details
- SoftBank Group and Sesterce to Develop 1 GW AI Data Center in Bosquel, France — SoftBank Group; 2026-05-31
- SoftBank Group and Sesterce to Develop 1 GW AI Data Center in Bosquel, France — Sesterce; 2026-06-01 · Archived source
- SoftBank Group to Build 5 GW of AI Data Center Capacity in France — SoftBank Group; 2026-05-31
- Companies
- Developer: SoftBank Group (unknown scope) evidence
- Developer: SoftBank Group (unknown scope) evidence
- Developer: Sesterce (unknown scope) evidence
- Developer: Sesterce (unknown scope) evidence
- Government: Communauté de communes Somme Sud-Ouest (unknown scope) evidence
- Government: Communauté de communes Somme Sud-Ouest (unknown scope) evidence
Source and location review
- Status source
- SoftBank Group and Sesterce to Develop 1 GW AI Data Center in Bosquel, France evidence row
SoftBank Group · published 2026-05-31 · Company disclosure - Locator
- Locality reference only · Compiled location reference · locality evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 148 days before the data update on 2026-10-27
Location details
- Coordinates
- 49.73910, 2.21790
- Geometry licence
- source-terms-not-recorded
- Use scope
- Locality reference only
- Scope class
- locality
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- Nominatim centroid of the commune of Bosquel (Somme); sources name the commune only.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- f59be53e
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| SoftBank Group and Sesterce to Develop 1 GW AI Data Center in Bosquel, France Archived copy | Sesterce Company disclosure | Imported: Geometry, Imported: Record, Imported: Status, Metric: Power Capacity, Role: Developer, Role: Government | source-terms-not-recorded | Sesterce | dfca3a61b82e61e2d64f964d43821062ca39c6e11d68aaac1411d9278af573adFactual source record; not the publisher page | ||
| SoftBank Group and Sesterce to Develop 1 GW AI Data Center in Bosquel, France Archived copy | SoftBank Group Company disclosure | Imported: Geometry, Imported: Record, Imported: Status, Metric: Jobs Permanent, Metric: Power Capacity, Milestone: Announced, Role: Developer, Role: Government | source-terms-not-recorded | SoftBank Group | 4d62b354bd21d1691df8583ad19b7088e888d035448bf8fd8f3fef70dc3d6cb4Factual source record; not the publisher page | ||
| SoftBank Group to Build 5 GW of AI Data Center Capacity in France Archived copy | SoftBank Group Company disclosure | Imported: Record, Milestone: Announced | source-terms-not-recorded | SoftBank Group | 2bf16f8d22f59e04bc2b762bc27c72daa7dd8c8a244c764af7b99934cf874063Factual source record; not the publisher page |
Cite this site
Kyars, K. (2026). SoftBank-Sesterce Bosquel AI data center [site vcc-site-6bf2ad82353d1ed7d3c9]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6bf2ad82353d1ed7d3c9/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction