GDS Shaoguan Computing Cluster, Baitu Industrial Park, Qujiang

Announced

China · 1 project · Last reported

Summary

On 26 October 2026 the Shaoguan Ecology and Environment Bureau published, with its acceptance notice (accepted 23 October), the EIA report form of the 万国数据韶关220千伏输变电工程 filed by the GDS project company 韶关市万国云耀数据科技有限公司. The filing names the GDS Shaoguan computing cluster (韶关万国数据算力集群) in the Baitu industrial park, Qujiang, as the sole load of a new dedicated 220 kV substation (GDS I) and describes the GDS data centre to be built there with T-BLOCK modules. Phase 1 of the substation (2x120 MVA, 112.6 MW maximum load) is planned for December 2026 and phase 2 (225.4 MW in total) for late 2027 or April 2028. This dated regulatory filing identifies the data-centre project and supports announced status only: it concerns grid-connection infrastructure, is not development consent for the data centre, and establishes no data-centre construction, completion or operation. Loads and dates are substation plans, not IT capacity. evidence

韶关市万国云耀数据科技有限公司 (filing builder); published by the Shaoguan Municipal Ecology and Environment Bureau · published 2026-10-26

Location

The interactive map needs JavaScript. Display anchor: 24.68642, 113.50929 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (1)

GDS Shaoguan Computing Cluster (韶关万国数据算力集群) — data-centre campus development

Announced last observed as of · Project announcement

Acceptance notice published 2026-10-26: on 23 October 2026 the bureau accepted the ecological EIA report form for the 万国数据韶关220千伏输变电工程, builder 韶关市云耀数据科技有限公司 (the report cover gives 韶关市万国云耀数据科技有限公司), location Baitu town, Qujiang District and Longgui town, Wujiang District, consultant 广东韶科环保科技有限公司, with the report attached for a two-working-day notice period. Acceptance for review is not an EIA approval and not development consent. evidence

Shaoguan Municipal Ecology and Environment Bureau (韶关市生态环境局) · published 2026-10-26

Grid-company EIA for the public 220 kV Baitu data-centre switching station in the Baitu industrial park, Qujiang. Its C line is a 1.43 km cable from that station along park roads and south via 规划二路 into the 220 kV GDS user station (万国用户站), using a cable channel inside the GDS station, and it ends at g113°30'52.440", 24°41'02.928" (PDF pages 2, 19 and 33). Those values behave as GCJ-02: their inverse lies 71.5 m from the GDS I centre in the October GDS filing. Identity context for the GDS user substation; it gives no data-centre status. evidence

Shaoguan Municipal Ecology and Environment Bureau (韶关市生态环境局); builder Guangdong Power Grid Shaoguan Power Supply Bureau · published 2026-07-03

Grid-company EIA for a new 220 kV outgoing bay at the existing Tanjie substation to connect the GDS Shaoguan computing cluster. It prints the Tanjie substation centre as 113°29′3.042″, 24°40′26.388″ (PDF pages 3 and 10). Read as WGS84 that point lies 657 m from the walled Tanjie yard, while its GCJ-02 inverse falls in the yard 27 m from the Tanjie line end printed in the October GDS filing. Used only for the datum check; it gives no data-centre status. evidence

Shaoguan Municipal Ecology and Environment Bureau (韶关市生态环境局); builder Guangdong Power Grid Shaoguan Power Supply Bureau · published 2026-06-15

Web Mercator imagery tile containing the GDS I substation centre. With neighbouring z16/z17 tiles (listed in the geometry facts) it shows the point in a cleared earthworks tract with ponds just east of the Baitu industrial park factory blocks. Undated imagery; no data-centre buildings are visible and no physical status is inferred. evidence

Esri · publication date not stated

Web Mercator imagery tile containing the walled outdoor yard of the existing 220 kV Tanjie substation. The Tanjie line end printed in the October GDS filing, read directly as WGS84, falls inside this yard; this is the datum check for the GDS I point. Qualitative registration check, not a measured accuracy. evidence

Esri · publication date not stated

Companies
  • Operator: GDS (万国数据) (intended) evidence
Source and location review
Status source
Ecological EIA report form: 万国数据韶关220千伏输变电工程 (GDS Shaoguan 220 kV transmission project), public version, builder 韶关市万国云耀数据科技有限公司 evidence row
韶关市万国云耀数据科技有限公司 (filing builder); published by the Shaoguan Municipal Ecology and Environment Bureau · published 2026-10-26 · Regulatory filing
Locator
Campus locator · Official source · official_eia_dedicated_user_substation_centre evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 1 days before the data update on 2026-10-27

Location details
Coordinates
24.68642, 113.50929
Geometry licence
all-rights-reserved
Use scope
Campus locator
Scope class
official_eia_dedicated_user_substation_centre
Authority
Official source
Source entity
Campus
Method
official_eia_geographic_dms_point_transcription_with_imagery_datum_check
Derivation
direct_geometry
Precision scope
Centre of the proposed GDS I (万国I站) 220 kV user substation that the GDS project company is building to supply only the GDS Shaoguan computing cluster, printed in its October 2026 EIA. It marks the cluster through its dedicated grid intake in the Baitu industrial park; it is not a data-hall centre, parcel centroid, entrance, campus boundary or construction extent.
Horizontal uncertainty
Not reported

No datum or positional accuracy is stated. The WGS84 reading rests on a qualitative imagery check of a second point in the same filing (the Tanjie line end) and on agreement within 72 m with the GCJ-02-corrected point of the July grid EIA. None of the filings outlines the data-centre property, so the substation's offset from the data-centre buildings, and whether it lies inside their parcel, are unknown. Decimal places are transcription precision.

Geometry evidence
1f706dda

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for GDS Shaoguan Computing Cluster, Baitu Industrial Park, Qujiang
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Ecological EIA report form: 万国数据韶关220千伏输变电工程 (GDS Shaoguan 220 kV transmission project), public version, builder 韶关市万国云耀数据科技有限公司
Archived copy
韶关市万国云耀数据科技有限公司 (filing builder); published by the Shaoguan Municipal Ecology and Environment Bureau
Regulatory filing
Project announcement, Geometry, Operator claimall-rights-reserved韶关市万国云耀数据科技有限公司 (builder); report prepared by 广东韶科环保科技有限公司; published by the Shaoguan Municipal Ecology and Environment Bureau967da14da541afd53af6fa6ad228aea59057c4faf66edb7af454fe20b1b91b7a
Retained source material; see source provenance
EIA report form: 韶关220千伏白土数据中心输变电工程 (Shaoguan 220 kV Baitu data-centre transmission project), public version, accepted July 2026
Archived copy
Shaoguan Municipal Ecology and Environment Bureau (韶关市生态环境局); builder Guangdong Power Grid Shaoguan Power Supply Bureau
Environmental assessment document
Site and project identityall-rights-reservedGuangdong Power Grid Co., Ltd. Shaoguan Power Supply Bureau (builder); published by the Shaoguan Municipal Ecology and Environment Bureaudbe5d65db0cebf8b0b10d29cb32fec875fef09135f89713698ddb83936638795
Retained source material; see source provenance
EIA report form: 韶关万国数据算力集群项目接入系统配套工程 (GDS Shaoguan computing-cluster grid-connection works at the 220 kV Tanjie substation), public version, June 2026
Archived copy
Shaoguan Municipal Ecology and Environment Bureau (韶关市生态环境局); builder Guangdong Power Grid Shaoguan Power Supply Bureau
Environmental assessment document
Site and project identityall-rights-reservedGuangdong Power Grid Co., Ltd. Shaoguan Power Supply Bureau (builder); published by the Shaoguan Municipal Ecology and Environment Bureaufb9ea43e840f289956e726e9e596f78fc15838148fedf88e546c07d3e9c0a74b
Retained source material; see source provenance
Esri World Imagery tile z17/56256/106863 (GDS I substation point, Baitu industrial park, Qujiang)
Archived copy
Esri
Other
Site and project identitynot statedEsri World Imagery terms of use; not redistributedEsri, Maxar, Earthstar Geographics, and the GIS User Community (Esri World Imagery)0fa6e1c401ca3ef38dc15abddeb3baf7ce0e64d24061db0d8da679939081def4
Retained source material; see source provenance
Esri World Imagery tile z17/56260/106852 (220 kV Tanjie substation, Baitu, Qujiang)
Archived copy
Esri
Other
Site and project identitynot statedEsri World Imagery terms of use; not redistributedEsri, Maxar, Earthstar Geographics, and the GIS User Community (Esri World Imagery)9613fa5625acff6487cc30b62648cf21119d86e4aeb8d9a8a184ac6868aae1b8
Retained source material; see source provenance
Shaoguan Ecology and Environment Bureau acceptance notice for the EIA report form of the 万国数据韶关220千伏输变电工程
Archived copy
Shaoguan Municipal Ecology and Environment Bureau (韶关市生态环境局)
Government record
Site and project identityall-rights-reservedShaoguan Municipal Ecology and Environment Bureau (韶关市生态环境局), Shaoguan municipal government portal63ef99e73ce7247eac5aa0740d586ed1bf17ad670b28e6cde201c4eac1194d5c
Retained source material; see source provenance
Cite this site

Kyars, K. (2026). GDS Shaoguan Computing Cluster, Baitu Industrial Park, Qujiang [site vcc-site-b287b39e1341bb948cb6]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b287b39e1341bb948cb6/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction