QScale Q01 Lévis Campus

Partially operational Under construction

Canada · 2 projects · Last reported

Summary

QScale Q01 Building B

QScale reports Q01 Building B construction well underway and labels the build as 60 MW of IT capacity. evidence

QScale · published 2026-06-04

QScale Q01 campus (Lévis)

QScale's Q01 campus in Lévis, in the Quebec City area, is a liquid- and air-cooled colocation and AI campus that the company says is powered by 142 MW of renewable energy. Launched in 2021 as an eight-phase project, it was later costed at CAD 1.05 billion; Hewlett Packard Enterprise became its first anchor tenant in 2023. Goldman Sachs Alternatives closed its acquisition of QScale in May 2026, and in June 2026 QScale said construction of a second building adding 60 MW of IT capacity was well underway.

Source record as of 2026-10-09 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 46.67616, -71.32506 (Polygon locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (2)

QScale Q01 Building B

Under construction last observed as of · Authoritative status update

Power

MetricStageValueAs ofMethodNotesEvidence
Critical IT loadDesign60 MWReportedDirectly labeled IT-capacity design figure; no present-load or operational-capacity claim.evidence
Source and location review
Status source
QScale Q01 Building B construction update evidence row
QScale · published 2026-06-04 · Company disclosure
Locator
Campus locator · Community mapped · reviewed_openstreetmap_named_addressed_qscale_facility_building_polygon evidence
Source checks

Not reviewed against imagery not_reviewed_for_core_preview
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 145 days before the data update on 2026-10-27

QScale Q01 campus (Lévis)

Partially operational last observed as of · Reported status

Location: Lévis, Quebec, CA. QScale's Q01 campus page gives the address 2280 Albert-Dion St, Lévis; coordinates were geocoded from that address to an OpenStreetMap building tagged QScale. QScale

Use: Colocation, Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity142 MWPlanned · Campus · Unspecified2023-05-22Power capacity listed on the campus page; the 2023 release says the campus is powered by 142 MW of renewable energy. Neither says whether the figure is contracted or how it relates to the 114 MW IT load.QScale; QScale
Power capacity140 MWContracted · Campus · Unspecified2021-07-13Agreement with Hydro-Québec for the use of 140 MW, reported at the 2021 launch.QScale
Power capacity114 MWPlanned · Campus · It load2026-10-09Protected customer IT load stated on the undated campus page.QScale
Power capacity60 MWUnder construction · Phase · It load · Building B2026-06-04Second building; the release gives its cost as 700 million dollars without a currency code.QScale
Investment1,050,000,000 CADAnnounced · Campus2022-09-21Total for all eight phases. The 2021 launch release gave 867 million dollars, with 195 million for phase 1.QScale
Floor areaabout 930,000 sq_ftPlanned · Campus2026-10-09Total building space on the undated campus page; white space about 313,000 sq ft.QScale

Companies and organizations

NameRoleNotesSources
QScaleDeveloperQScale; QScale; QScale
QScaleOperatorQScale; QScale
Hewlett Packard EnterpriseTenantAnnounced as first anchor tenant in May 2023; deployed its AI cloud at the campus.QScale; QScale
Goldman Sachs AlternativesOwnerIts infrastructure business acquired QScale; founders and management reinvested.QScale
Government of QuebecInvestorProvided a loan and bought shares for the first phase in 2021.QScale
Hydro-QuébecUtilityAgreement for the use of 140 MW reported at the 2021 launch.QScale

Timeline

DateEventActual or plannedNotesSources
2021-07-13AnnouncedActualLaunch and financing of the first phase; phase 1 backbone infrastructure was targeted for completion by the end of 2022.QScale
2022-09-21OtherActualPhase 2 construction reported well underway, a year ahead of schedule.QScale
2023-05-22OtherActualHewlett Packard Enterprise announced as first anchor tenant.QScale
2024-11-20OtherActualCredit facility of up to 320 million dollars arranged to fund phases 3 and 4.QScale
2026-05-13OtherActualGoldman Sachs Alternatives announced that it had closed its acquisition of QScale.QScale
2026-06-04Expansion announcedActualConstruction of Building B (60 MW IT) reported well underway.QScale

Power supply

TypeDescriptionSources
GridSupplied by Hydro-Québec through a QScale-owned 120 kV substation; the company describes the supply as 100% renewable.QScale; QScale

Status rests on the June 2026 release, which describes the existing campus in operation while Building B is built, and on QScale's undated campus page, which reports HPE's deployment; status_as_of is the date that page was read (2026-10-09), as are the as_of dates of figures taken from it. Building B's 700 million dollar cost is given without a currency and is not recorded as a metric.

Sources for these details
Companies
  • Developer: QScale (unknown scope) evidence
  • Developer: QScale (unknown scope) evidence
  • Developer: QScale (unknown scope) evidence
  • Operator: QScale (unknown scope) evidence
  • Operator: QScale (unknown scope) evidence
  • Tenant: Hewlett Packard Enterprise (unknown scope) evidence
  • Tenant: Hewlett Packard Enterprise (unknown scope) evidence
  • Owner: Goldman Sachs Alternatives (unknown scope) evidence
  • Investor: Government of Quebec (unknown scope) evidence
  • Utility: Hydro-Québec (unknown scope) evidence
Source and location review
Status source
QScale Begins Construction of Its Second Building at the Q01 Campus, Adding 60 MW of AI-Ready Infrastructure in Quebec evidence row
QScale · published 2026-06-04 · Company disclosure
Locator
Project locator · Compiled location reference · site evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 18 days before the data update on 2026-10-27

Location details
Coordinates
46.67616, -71.32506
Geometry licence
ODbL-1.0
Use scope
Campus locator
Scope class
reviewed_openstreetmap_named_addressed_qscale_facility_building_polygon
Authority
Community mapped
Source entity
Campus
Method
openstreetmap_named_addressed_facility_polygon_as_campus_locator
Derivation
cross_source_overlay
Precision scope
Contributor-mapped polygon for one named QScale data-centre building at Q01's exact first-party address, used only to locate the Q01 campus. It is not the Building B footprint or centroid, the Q01 campus boundary, a parcel, a construction extent, or a survey-accuracy claim.
Horizontal uncertainty
Not reported

OpenStreetMap does not state horizontal positional accuracy; community-mapped geometry is not a cadastral or survey product.

Geometry evidence
8dff3085

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for QScale Q01 Lévis Campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Goldman Sachs Alternatives to Acquire QScale, a Leading Canadian Data Center Platform
Archived copy
QScale
Company disclosure
Imported: Record, Milestone: Other, Owner claimsource-terms-not-recordedQScale465e6d62f72139e93c755900473aa286022ca28991920d94c96ca07ef06fdedb
Factual source record; not the publisher page
OpenStreetMap way 1171439340: QScale
Archived copy
OpenStreetMap contributors
OpenStreetMap
GeometryODbL-1.0© OpenStreetMap contributorsb618f90aa1d60b6737ad409febfbd328a24aaa81acc26d9c5e9e14bbcb040e81
Retained source material; see source provenance
Q01 Campus
Archived copy
QScale
Company disclosure
Imported: Geometry, Imported: Record, Imported: Status, Metric: Floor Area, Metric: Power Capacity, Power Source: Grid, Operator claim, Tenant claimnot statedsource-terms-not-recordedQScale6ad9ec6af49c8a8c8859f74073d49483b301a501b06c42e0be9e278505b60ff9
Factual source record; not the publisher page
QScale Accelerates Its Expansion and Growth
Archived copy
QScale
Company disclosure
Imported: Record, Metric: Investment, Milestone: Other, Role: Developersource-terms-not-recordedQScalec8bffa01762068af6a8ceebb09b101b41bd5f1298373b43e6af1814e8a66afe9
Factual source record; not the publisher page
QScale Begins Construction of Its Second Building at the Q01 Campus, Adding 60 MW of AI-Ready Infrastructure in Quebec
Archived copy
QScale
Company disclosure
Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: Expansion Announced, Role: Developersource-terms-not-recordedQScale474418bfe4855f9425cc925b517533dd60b48b44948db99772e26c325bed9c5f
Factual source record; not the publisher page
QScale Q01 Building B construction update
Archived copy
QScale
Company disclosure
Physical status, Critical IT load observationall-rights-reservedQScale71cd3c449fce72037b102a9832ab0366ddfb3296002b3783f4d3be28831fe5db
Retained source material; see source provenance
QScale Secures Up to $320 Million Funding to Accelerate Growth
Archived copy
QScale
Company disclosure
Imported: Record, Milestone: Othersource-terms-not-recordedQScale90620a4eb43038251c3d3d2f9d40a64f1cda700fc5c85e229c15ffbaae7a5952
Factual source record; not the publisher page
QScale Welcomes Hewlett Packard Enterprise as First Anchor Tenant at Q01 Campus
Archived copy
QScale
Company disclosure
Imported: Record, Metric: Power Capacity, Milestone: Other, Operator claim, Tenant claimsource-terms-not-recordedQScaleb1b4e0c3d62fc83b79aef6d7ab33e3cd8092bbc66b111ee2a5e887031ceaf01c
Factual source record; not the publisher page
QScale: From Data Processing to Food Self-Sufficiency
Archived copy
QScale
Company disclosure
Imported: Record, Metric: Power Capacity, Milestone: Announced, Power Source: Grid, Role: Developer, Role: Investor, Role: Utilitysource-terms-not-recordedQScalea2168aeaa01df0a48abbc4dd42e20322f8a891c3db8cef79750a9010676d4ab7
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). QScale Q01 Lévis Campus [site vcc-site-0ecf05307f91c1e40479]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0ecf05307f91c1e40479/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction