CDC Data Centres is building a campus of six four-storey data center buildings on about 20 hectares in the Marsden Park Industrial Precinct in Sydney's north-west, within the City of Blacktown. CDC turned the first sod in October 2024 and plans 504 MW of ICT capacity, scalable toward 1 GW, with a dedicated substation of about 720 MVA. The NSW government approved it as state significant development on 27 November 2025 despite objections from Blacktown City Council; press coverage put the investment at A$3.1 billion. CDC describes the campus as in the early stages of construction.

Source record as of 2026-10-09 · Details and sources

CDC's investor day presentation, released by Infratil on 16 September 2026, reports on slide 9 'Substantial investment underway to deliver multiple large scale data centres at CDC's Marsden Park campus across FY28-29'. On the same slide it says that CDC 'is well underway at all sites where customer capacity has been contracted, with all data centres under construction to be delivered across FY27-29'. Slide 6 corroborates this: as at 30 June 2026 it maps MP2 to MP5 as under construction and MP6 as future development. This records CDC's six-building Marsden Park development as under construction on 16 September 2026, the presentation date. The FY28-29 deliveries are forecasts. No particular construction stage, completion or operation is established. evidence

CDC Data Centres (presentation released by Infratil Limited, NZX/ASX: IFT) · published 2026-09-16

Location

The interactive map needs JavaScript. Display anchor: -33.72369, 150.83637 (Polygon locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (1)

CDC Marsden Park Early Construction

Under construction last observed as of · Authoritative status update

This record reports under construction as of 2026-10-09. CDC Data Centres

Location: Marsden Park, City of Blacktown, New South Wales, AU. Sources name the Marsden Park Industrial Precinct without a street address; the point is the Marsden Park suburb coordinate from its Wikipedia article, so it marks the suburb rather than the site. CDC Data Centres; NSW Planning Portal; W.Media; Wikipedia

Use: Cloud, Hpc, Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity504 MWPermitted · Campus · It load2025-11-27CDC calls this total ICT capacity; the planning portal describes it as power consumption of the data centre. W.Media reports the campus can scale toward 1 GW.CDC Data Centres; NSW Planning Portal; W.Media
Power capacity720 MWPermitted · Campus · Grid connection2025-11-27Rating of the on-site substation: 720 MW on the planning portal and 720 MVA in CDC's release.CDC Data Centres; NSW Planning Portal
Investment3,100,000,000 AUDReported · Campus2025-11-28Figure given in coverage of the approval; CDC's own release gives no amount.W.Media; Startup Daily (Information Age)
Buildings6 countPlanned · Campus2025-11-27CDC Data Centres; NSW Planning Portal
Land area20.1 hectaresReported · Campus2024-10-25CDC Data Centres
Jobs construction200 countPlanned · Campus2025-12-04Figure reported by Information Age; CDC's release instead cites more than 10,000 jobs over the life of construction.Startup Daily (Information Age)
Jobs permanent265 countPlanned · Campus2025-12-04Startup Daily (Information Age)

Companies and organizations

NameRoleNotesSources
CDC Data CentresDeveloperCDC Data Centres; W.Media; Startup Daily (Information Age)
CDC Data CentresOwnerCDC Data Centres
CDC Data CentresOperatorCDC Data Centres
NSW Department of PlanningGovernmentAssessed and approved the campus as state significant development.NSW Planning Portal; W.Media

Timeline

DateEventActual or plannedNotesSources
2024-10-25Construction startedActualCeremonial sod-turning, with minor earthworks and site preparation already under way.CDC Data Centres
2025-11-27Permit approvedActualApproved as state significant development SSD-70889211; Blacktown City Council had objected on engineering and planning grounds.NSW Planning Portal; W.Media

Power supply

TypeDescriptionSources
GridDedicated on-site substation of about 720 MVA.CDC Data Centres; NSW Planning Portal

Status rests on CDC's undated Sydney locations page, which described Marsden Park as in the early stages of construction when accessed on 2026-10-09, so status_as_of is the access date. An earlier DatacenterDynamics report on the filing gave a lower investment figure, but that page could not be opened. Wikipedia is cited only for the suburb coordinate.

Sources for these details
Companies
  • Operator: CDC Data Centres (intended) evidence
  • Developer: CDC Data Centres (unknown scope) evidence
  • Developer: CDC Data Centres (unknown scope) evidence
  • Developer: CDC Data Centres (unknown scope) evidence
  • Owner: CDC Data Centres (unknown scope) evidence
  • Operator: CDC Data Centres (unknown scope) evidence
  • Government: NSW Department of Planning (unknown scope) evidence
  • Government: NSW Department of Planning (unknown scope) evidence
Source and location review
Status source
CDC Investor Day Presentation (Infratil Investor Update, 16 September 2026) evidence row
CDC Data Centres (presentation released by Infratil Limited, NZX/ASX: IFT) · published 2026-09-16 · Company disclosure
Locator
Campus locator · Community mapped · community_mapped_named_cdc_marsden_park_campus_development_polygon evidence
Source checks

Not reviewed against imagery not_reviewed_for_core_preview
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 41 days before the data update on 2026-10-27

Location details
Coordinates
-33.72369, 150.83637
Geometry licence
ODbL-1.0
Use scope
Campus locator
Scope class
community_mapped_named_cdc_marsden_park_campus_development_polygon
Authority
Community mapped
Source entity
Facility
Method
cross_source_identity_bridge_to_live_osm_named_cdc_marsden_park_campus_polygon
Derivation
capture_replayed_geometry
Precision scope
The polygon is a contributor-mapped named development outline and the point is only its deterministic longitude-latitude bounding-box midpoint. Neither is a survey, cadastral, planning, parcel, security, building, phase, or current construction boundary. OSM construction tags are retained solely as source context and never provide the selected project's authoritative lifecycle.
Horizontal uncertainty
Not reported

OpenStreetMap supplies no survey accuracy, cadastral authority, planning-boundary authority, or numeric horizontal uncertainty for this way.

Geometry evidence
ce28239d

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for CDC Marsden Park Campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
CDC Data Centres Breaks Ground on New State-of-the-Art Data Centre Development in Marsden Park Industrial Precinct
Archived copy
CDC Data Centres
Company disclosure
Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Land Area, Metric: Power Capacity, Milestone: Construction Started, Power Source: Grid, Role: Developer, Operator claim, Owner claimsource-terms-not-recordedCDC Data Centres1b47260f3da54b9ec87a8cfb18e97d9ded2e844e1513ef6896cdff9a92e30bc0
Factual source record; not the publisher page
CDC Investor Day Presentation (Infratil Investor Update, 16 September 2026)
Archived copy
CDC Data Centres (presentation released by Infratil Limited, NZX/ASX: IFT)
Company disclosure
Physical statusall-rights-reservedCDC Data Centres / Infratil Limited971c5cac53ff8e04a61557ee623c8b8ca34ade097bc3b024b37658babce592af
Retained source material; see source provenance
CDC Marsden Park Campus current status
Archived copy
CDC Data Centres
Company disclosure
Physical status, Operator claimnot statedall-rights-reservedCDC Data Centres66d6de9440d4496482af80159cbe361afdb8e36bdebd5edf81ac1c65f1337620
Retained source material; see source provenance
Marsden Park Data Centre (SSD-70889211)
Archived copy
NSW Planning Portal
Government record
Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Power Capacity, Milestone: Permit Approved, Power Source: Grid, Role: Governmentnot statedsource-terms-not-recordedNSW Planning Portalaffdb4c05e4fd9ce15e93fef86065d35691c169928880524b7946c3e5b85f56d
Factual source record; not the publisher page
Marsden Park, New South Wales
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia7fa9e8bf2b83645f019be8c1cf972a3b55e34b1038a875dcedc9a4ef6730cb03
Factual source record; not the publisher page
NSW gives the nod to a $3 billion CDC data centre in Western Sydney
Archived copy
Startup Daily (Information Age)
News
Imported: Record, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Role: Developersource-terms-not-recordedStartup Daily (Information Age)e4911f2a1b62cfd1b89a7dad7ae658db55e5f4c082b943a732dbde949417c9d7
Factual source record; not the publisher page
NSW govt approves CDC's 504 MW campus in Sydney
Archived copy
W.Media
Trade publication
Imported: Geometry, Imported: Record, Metric: Investment, Metric: Power Capacity, Milestone: Permit Approved, Role: Developer, Role: Governmentsource-terms-not-recordedW.Mediacfc646b8cbd1e0964703443b2c51039ce43d43884583608079216add2d1d016e
Factual source record; not the publisher page
OpenStreetMap way 1336972876 — CDC Marsden Park Campus
Archived copy
OpenStreetMap contributors
Open map geometry
GeometryODbL-1.0© OpenStreetMap contributorsf176dfe0fd79fca768f9290dc5aa2204df379204403753640b3d48015b0fe8d8
Retained source material; see source provenance
Sydney and regional NSW locations
Archived copy
CDC Data Centres
Company disclosure
Imported: Record, Imported: Statusnot statedsource-terms-not-recordedCDC Data Centresf17cb698213f8d00f74822e976185eb369b22df8e4608d03266f64cebd820fdf
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). CDC Marsden Park Campus [site vcc-site-37ddc3b143bf9ea08d1c]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-37ddc3b143bf9ea08d1c/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction